4,005
Views
10
CrossRef citations to date
0
Altmetric
Editorial

Scheduling in manufacturing systems: new trends and perspectives

, , & ORCID Icon

References

  • Bozek, A., and F. Werner. 2017. “Flexible Job Shop Scheduling with Lot Streaming and Sublot Size Optimisation.” International Journal of Production Research, 21 pages. doi:10.1080/00207543.2017.1346322.
  • Chen, W., L. Lei, Z. Wang, M. Teng, and J. Liu. 2018. “Coordinating Supplier Selection and Project Scheduling in Resource-constrained Construction Supply Chains.” International Journal of Production Research, 15 pages. doi:10.1080/00207543.2018.1436782.
  • de Matta, R. 2017. “Scheduling a Manufacturing Process with Restrictions on Resource Availability.” International Journal of Production Research, 18 pages. doi:10.1080/00207543.2017.1384583.
  • Foumani, M., A. Moeini, M. Haythorpe, and K. Smith-Miles. 2018. “A Cross-entropy Method for Optimising Robotic Automated Storage and Retrieval Systems.” International Journal of Production Research, 23 pages. doi:10.1080/00207543.2017.1456692.
  • Ivanov, D., A. Dolgui, and B. Sokolov. 2017. “Scheduling of Recovery Actions in the Supply Chain with Resilience Analysis Considerations.” International Journal of Production Research, 18 pages. doi:10.1080/00207543.2017.1401747.
  • Lai, T. C., Y. N. Sotskov, N. G. Egorova, and F. Werner. 2017. “The Optimality Box in Uncertain Data for Minimising the Sum of the Weighted Job Completion Times.” International Journal of Production Research, 27 pages. doi:10.1080/00207543.2017,1398426.
  • Liu, C., X. Xiang, L. Zheng, and J. Ma. 2017. “An Integrated Model for Multi-resource Constrained Scheduling Problem Considering Multi-product and Resource-sharing.” International Journal of Production Research, 21 pages. doi:10.1080/00207543.2017.1363428.
  • Meng, R., Y. Rao, Y. Zheng, and D. Qi. 2017. “Modelling and Solving Algorithm for Two-stage Scheduling of Construction Component Manufacturing with Machining and Welding Process.” International Journal of Production Research, 13 pages. doi:10.1080/00207543.2017.1349949.
  • Nasiri, M. M., A. Rahbari, F. Werner, and R. Karimi. 2018. “Incorporating Supplier Selection and Order Allocation into the Vehicle Routing and Multi-cross-dock Scheduling Problem.” International Journal of Production Research, 26 pages. doi:10.1080/00207543.2018.1471241.
  • Prasad, D., and S. C. Jayswal. 2017. “Reconfigurability Consideration and Scheduling of Products in a Manufacturing Industry.” International Journal of Production Research, 20 pages. doi:10.1080/00207543.2017.1334979.
  • Qu, L., S. He, M. B. C. Khoo, and P. Castagliola. 2017. “A CUSUM Chart for Detecting the Intensity Ratio of Negative Events.” International Journal of Production Research, 15 pages. doi:10.1080/00207543.2017.1398423.
  • Valledor, P., A. Gomez, P. Priore, and J. Puente. 2018. “Solving Multi-objective Rescheduling Problems in Dynamic Permutation Flow Shop Environments with Disruptions.” International Journal of Production Research, 15 pages. doi:10.1080/00207543.2018.1468095.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.