627
Views
16
CrossRef citations to date
0
Altmetric
Articles

Auction-based cooperation mechanism for cell part scheduling with transportation capacity constraint

, & ORCID Icon
Pages 3831-3846 | Received 09 Mar 2018, Accepted 09 Aug 2018, Published online: 08 Sep 2018

References

  • Adhau, S., M. L. Mittal, and A. Mittal. 2012. “A Multi-Agent System for Distributed Multi-Project Scheduling: An Auction-Based Negotiation Approach.” Engineering Applications of Artificial Intelligence 25 (8): 1738–1751. doi: 10.1016/j.engappai.2011.12.003
  • Attanasio, A., G. Ghiani, L. Grandinetti, and F. Guerriero. 2006. “Auction Algorithms for Decentralized Parallel Machine Scheduling.” Parallel Computing 32 (9): 701–709. doi: 10.1016/j.parco.2006.03.002
  • Baidas, M. W., and A. B. MacKenzie. 2012. “An Auction Mechanism for Power Allocation in Multi-Source Multi-Relay Cooperative Wireless Networks.” IEEE Transactions on Wireless Communications 11 (9): 3250–3260. doi: 10.1109/TWC.2012.071612.111722
  • Baker, A. D. 1988. “Complete Manufacturing Control Using a Contract Net: A Simulation Study.” International Conference on Computer Integrated Manufacturing, TROY, NY, 100-109.
  • Chung, D., C. Park, S. Kang, and J. Park. 1996. “Developing a Shop Floor Scheduling and Control Software for an FMS.” Computers and Industrial Engineering 30 (3): 557–568. doi: 10.1016/0360-8352(96)00016-2
  • Dewan, P., and S. Joshi. 2002. “Auction-based Distributed Scheduling in a Dynamic Job Shop Environment.” International Journal of Production Research 40 (5): 1173–1191. doi: 10.1080/00207540110098445
  • Elmi, A., M. Solimanpur, and S. Topaloglu. 2011. “A Simulated Annealing Algorithm for the Job Shop Cell Scheduling Problem with Intercellular Moves and Reentrant Parts.” Computers and Industrial Engineering 61 (1): 171–178. doi: 10.1016/j.cie.2011.03.007
  • Elmi, Atabak, and Seyda Topaloglu. 2017a. “Cyclic Job Shop Robotic Cell Scheduling Problem: Ant Colony Optimization.” Computers and Industrial Engineering 111: 417–432. doi: 10.1016/j.cie.2017.08.005
  • Elmi, Atabak, and Seyda Topaloglu. 2017b. "Multi-degree Cyclic Flow Shop Robotic Cell Scheduling Problem with Multiple Robots." International Journal of Computer Integrated Manufacturing 30 (8): 805–821. doi: 10.1080/0951192X.2016.1210231
  • Hurink, J., and S. Knust. 2005. “Tabu Search Algorithms for Job-Shop Problems with a Single Transport Robot.” European Journal of Operational Research 162 (1): 99–111. doi: 10.1016/j.ejor.2003.10.034
  • Kandel, E., B. Rindi, and L. Bosetti. 2012. “The Effect of a Closing Call Auction on Market Quality and Trading Strategies.” Journal of Financial Intermediation 21 (1): 23–49. doi: 10.1016/j.jfi.2011.03.002
  • Laarhoven, P. J. M. V., and J. K. Lenstra. 1992. “Job Shop Scheduling by Simulated Annealing.” Operations Research 40 (1): 113–125. doi: 10.1287/opre.40.1.113
  • Lacomme, P., M. Larabi, and N. Tchernev. 2013. “Job-shop Based Framework for Simultaneous Scheduling of Machines and Automated Guided Vehicles.” International Journal of Production Economics 143 (1): 24–34. doi: 10.1016/j.ijpe.2010.07.012
  • Lawrence, S. 1984. Supplement to Resource Constrained Project Scheduling: An Experimental Investigation of Heuristic Scheduling Techniques. Pittsburgh, PA: Carnegie Mellon University, GSIA.
  • Lin, G., and J. Solberg. 1992. “Integrated Shop Floor Control Using Autonomous Agents.” IEEE Transactions 24 (3): 57–71. doi: 10.1080/07408179208964224
  • Lin, S. W., K. C. Ying, C. C. Lu, and J. N. D. Gupta. 2011. “Applying Multi-Start Simulated Annealing to Schedule a Flowline Manufacturing Cell with Sequence Dependent Family Setup Times.” International Journal of Production Economics 130 (2): 246–254. doi: 10.1016/j.ijpe.2011.01.004
  • Rosen, C., and R. Madlener. 2013. “An Auction Design for Local Reserve Energy Markets.” Decision Support Systems 56: 168–179. doi: 10.1016/j.dss.2013.05.022
  • Shaw, M. J. 1988. “A Distributed Knowledge-Based Approach to Flexible Automation: The Contract Net Framework.” International Journal of Flexible Manufacturing Systems 1 (1): 85–104. doi: 10.1007/BF00713160
  • Shen, W. M., L. H. Wang, and Q. Hao. 2006. “Agent-based Distributed Manufacturing Process Planning and Scheduling: A State-of-the-Art Survey.” IEEE Transactions on Systems, Man and Cybernetics, Part C (Applications and Reviews) 36 (4): 563–577. doi: 10.1109/TSMCC.2006.874022
  • Shin, M., and M. Jung. 2005. “Bid Generation and Evaluation for MANPro-Based Real Time Scheduling.” International Journal of Production Research 43 (18): 3821–3836. doi: 10.1080/00207540500142936
  • Siwamogsatham, T., and C. Saygin. 2004. “Auction-based Distributed Scheduling and Control Scheme for Flexible Manufacturing Systems.” International Journal of Production Research 42 (3): 547–572. doi: 10.1080/00207540310001613683
  • Solimanpur, M., P. Vrat, and R. Shankar. 2004. “A Heuristic to Minimize Make-Span of Cell Scheduling Problem.” International Journal of Production Economics 88 (3): 231–241. doi: 10.1016/S0925-5273(03)00196-8
  • Tang, J. F., X. Wang, I. Kaku, and K. L. Yung. 2010. “Optimization of Parts Scheduling in Multiple Cells Considering Intercell Move Using Scatter Search Approach.” Journal of Intelligent Manufacturing 21 (4): 525–537. doi: 10.1007/s10845-008-0236-8
  • Tang, J. F., C. K. Zeng, and Z. D. Pan. 2016. “Auction-based Cooperation Mechanism to Parts Scheduling for Flexible Job Shop with Inter-Cells.” Applied Soft Computing 49: 590–602. doi: 10.1016/j.asoc.2016.08.046
  • Tian, Y. N., D. N. Li, P. Y. Zhou, and L. H. Wang. 2016. “Coordinated Scheduling of Intercell Production and Inter-Cell Transportation in the Equipment Manufacturing Industry.” Engineering Optimization 48 (12): 2046–2063. doi: 10.1080/0305215X.2016.1150470
  • Veeramani, D., and K.-J. Wang. 2006. “Bid Construction Scheme for Job Flow Time Reduction in Auction-Based Fully-Distributed Manufacturing Systems.” The International Journal of Advanced Manufacturing Technology 28 (5–6): 541–550. doi: 10.1007/s00170-004-2378-y
  • Wu, Z. B., and M. X. Weng. 2005. “Multi-Agent Scheduling Method with Earliness and Tardiness Objectives in Flexible Job Shops.” IEEE Transactions on Systems, Man, and Cybernetics, Part B: Cybernetics 35 (2): 293–301. doi: 10.1109/TSMCB.2004.842412
  • Yan, Hong-Sen, and Wen-Chao Li. 2017. “A Multi-Objective Scheduling Algorithm with Self-Evolutionary Feature for Job-Shop-Like Knowledgeable Manufacturing Cell.” Journal of Intelligent Manufacturing 28 (2): 337–351. doi: 10.1007/s10845-014-0981-9
  • Zeng, C. K., J. F. Tang, and C. J. Yan. 2014. “Scheduling of No Buffer Job Shop Cells with Blocking Constraints and Automated Guided Vehicles.” Applied Soft Computing 24: 1033–1046. doi: 10.1016/j.asoc.2014.08.028
  • Zeng, C. K., J. F. Tang, and C. J. Yan. 2015. “Job-Shop Cell-Scheduling Problem with Inter-Cell Moves and Automated Guided Vehicles.” Journal of Intelligent Manufacturing 26 (5): 845–859. doi: 10.1007/s10845-014-0875-x
  • Zhang, C. Y., P. G. Li, Z. L. Guan, and Y. Q. Rao. 2007. “A Tabu Search Algorithm with a New Neighborhood Structure for the Job Shop Scheduling Problem.” Computers & Operations Research 34 (11): 3229–3242. doi: 10.1016/j.cor.2005.12.002

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.