References
- Alavian, P., Y. Eun, S. M. Meerkov, and L. Zhang. 2019. “Smart Production Systems: Automating Decision Making in Manufacturing Environment.” International Journal of Production Research. doi:10.1080/00207543.2019.1600765.
- AlDurgam, M., K. Adegbola, and C. H. Glock. 2017. “A Single-vendor Single-manufacturer Integrated Inventory Model with Stochastic Demand and Variable Production Rate.” International Journal of Production Economics 191: 335–350. doi: 10.1016/j.ijpe.2017.05.017.
- Cárdenas-Barrón, L. E., J. L. González-Velarde, and G. Treviño-Garza. 2015. “A New Approach to Solve the Multi-product Multi-period Inventory Lot Sizing with Supplier Selection Problem.” Computers & Operations Research 64: 225–232. doi: 10.1016/j.cor.2015.06.008.
- Castellano, D., M. Gallo, L. C. Santillo, and D. Song. 2017. “A Periodic Review Policy with Quality Improvement, Setup Cost Reduction, Backorder Price Discount, and Controllable Lead Time.” Production & Manufacturing Research 5 (1): 328–350. doi: 10.1080/21693277.2017.1382397.
- Chang, H.-J., R.-H. Su, C.-T. Yang, and M.-W. Weng. 2012. “An Economic Manufacturing Quantity Model for a Two-stage Assembly System with Imperfect Processes and Variable Production Rate.” Computers & Industrial Engineering 63: 285–293. doi:10.1016/j.cie.2012.02.011.
- Chu, P., K. L. Yang, and P. S. Chen. 2005. “Improved Inventory Models with Service Level and Lead Time.” Computers & Operations Research 32 (2): 285–296. doi:10.1016/j.cor.2003.07.001.
- Connolly, F., and C. Sheahan. 2002. “Development of an Automated Process Planning and Production Activity Control System for the Manufacturing of Engineered Work Surfaces.” International Journal of Production Research 40 (15): 3725–3736. doi:10.1080/00207540210157150.
- Dey, B. K., B. Sarkar, M. Sarkar, and S. Pareek. 2018. “An Integrated Inventory Model Involving Discrete Setup Cost Reduction, Variable Safety Factor, Selling-price Dependent Demand, and Investment.” RAIRO – Operations Research. doi:10.1051/ro/2018009.
- Glock, C. H. 2009. “A Comment: Integrated Single Vendor-Single Buyer Model with Stochastic Demand and Variable Lead Time.” International Journal of Production Economics 122 (2): 790–792. doi:10.1016/j.ijpe.2009.06.032.
- Glock, C. H. 2010. “Batch Sizing with Controllable Production Rates.” International Journal of Production Research 48 (20): 5925–5942. doi:10.1080/00207540903170906.
- Glock, C. H. 2011. “Batch Sizing with Controllable Production Rates in a Multi-stage Production System.” International Journal of Production Research 49 (20): 6017–6039. doi: 10.1080/00207543.2010.528058
- Heydari, J., P. Zaabi-Ahmadi, and T. M. Choi. 2018. “Coordinating Supply Chains with Stochastic Demand by Crashing Lead Times.” Computers and Operations Research 100: 394–403. doi:10.1016/j.cor.2016.10.009.
- Huang, C. K., T. L. Cheng, T. C. Kao, and S. K. Goyal. 2011. “An Integrated Inventory Model Involving Manufacturing Setup Cost Reduction in Compound Poisson Process.” International Journal of Production Research 49 (4): 1219–1228. doi:10.1080/00207541003610270.
- Jamshidi, R., S. M. T. F. Ghomi, and B. Karimi. 2015. “Flexible Supply Chain Optimization with Controllable Lead Time and Shipping Option.” Applied Soft Computing 30: 26–35. doi:10.1080/00207540802398053.
- Jha, J. K., and K. Shanker. 2009. “A Single-vendor Single-buyer Production-inventory Model with Controllable Lead Time and Service Level Constraint for Decaying Items.” International Journal of Production Research 47 (24): 6875–6898. doi: 10.1080/00207540802398053
- Kang, C. W., M. Ullah, B. Sarkar, I. Hussain, and R. Akhtar. 2017. “Impact of Random Defective Rate on Lot Size Focusing Work-in-Process Inventory in Manufacturing System.” International Journal of Production Research 55 (6): 1748–1766. doi:10.1080/00207543.2016.1235295.
- Khouja, M., and A. Mehrez. 1994. “Economic Production Lot Size Model with Variable Production Rate and Imperfect Quality.” Journal of the Operational Research Society 45 (12): 1405–1417. doi:10.1057/jors.1994.217.
- Kim, T., and C. H. Glock. 2018. “Production Planning for a Two-stage Production System with Multiple Parallel Machines and Variable Production Rates.” International Journal of Production Economics 196: 284–292. doi:10.1016/j.ijpe.2017.11.018.
- Kim, M. S., and B. Sarkar. 2017. “Multi-stage Cleaner Production Process with Quality Improvement and Lead Time Dependent Ordering Cost.” Journal of Cleaner Production 144: 572–590. doi:10.1016/j.jclepro.2016.11.052.
- Kim, S. J., and B. Sarkar. 2017. “Supply Chain Model with Stochastic Lead Time, Trade-credit Financing, and Transportation Discounts.” Mathematical Problems in Engineering 2017. doi:10.1155/2017/6465912.
- Li, Y., Q. Lin, and F. Ye. 2014. “Pricing and Promised Delivery Lead Time Decisions with a Risk-averse Agent.” International Journal of Production Research 52 (12): 3518–3537. doi:10.1080/00207543.2013.871592.
- Li, G., M. Reimann, and W. Zhang. 2018. “When Remanufacturing Meets Product Quality Improvement: The Impact of Production Cost.” European Journal of Operational Research 271: 913–925. doi:10.1016/j.ejor.2018.05.060.
- Majumder, A., R. Guchhait, and B. Sarkar. 2017. “Manufacturing Quality Improvement and Setup Cost Reduction in an Integrated Vendor–Buyer Supply Chain Model.” European Journal of Industrial Engineering 11 (5): 588–612. doi:10.1504/EJIE.2017.087678.
- Majumder, A., C. K. Jaggi, and B. Sarkar. 2018. “A Multi-retailer Supply Chain Model with Backorder and Variable Production Cost.” RAIRO – Operations Research 52 (3): 943–954. doi:10.1051/ro/2017013.
- Malik, A. I., and B. Sarkar. 2018. “Optimizing a Multi-product Continuous-review Inventory Model with Uncertain Demand, Quality Improvement, Setup Cost Reduction, and Variation Control in Lead Time.” IEEE Access 6: 36176–36187. doi:10.1109/ACCESS.2018.2849694.
- Moon, I., and S. Choi. 1998. “A Note on Lead Time and Distributional Assumptions in Continuous Review Inventory Models.” Computers & Operations Research 25 (11): 1007–1012. doi:10.1016/S0305-0548(97)00103-2.
- Moon, I., E. Shin, and B. Sarkar. 2014. “Min-max Distribution Free Continuous-review Model with a Service Level Constraint and Variable Lead Time.” Applied Mathematics and Computation 229: 310–315. doi: 10.1016/j.amc.2013.12.034.
- Ouyang, L. Y., C. K. Chen, and H. C. Chang. 2002. “Quality Improvement, Setup Cost and Lead-time Reductions in Lot Size Reorder Point Models with an Imperfect Production Process.” Computers & Operations Research 29 (12): 1701–1717. doi:10.1016/S0305-0548(01)00051-X.
- Ouyang, L. Y., N. C. Yeh, and K. S. Wu. 1996. “Mixture Inventory Model with Backorders and Lost Sales for Variable Lead Time.” Journal of the Operational Research Society 47 (6): 829–832. doi: 10.1057/jors.1996.102.
- Porteus, E. L. 1986. “Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction.” Operations Research 34 (1): 137–144. doi:10.1287/opre.34.1.137.
- Sarkar, B. 2019. “Mathematical and Analytical Approach for the Management of Defective Items in a Multi-stage Production System.” Journal of Cleaner Production 218: 896–919. doi:10.1016/j.jclepro.2019.01.078.
- Sarkar, B., B. Ganguly, M. Sarkar, and S. Pareek. 2016. “Effect of Variable Transportation and Carbon Emission in a Three-echelon Supply Chain Model.” Transportation Research Part E: Logistics and Transportation Review 91: 112–128. doi:10.1016/j.tre.2016.03.018.
- Sarkar, B., R. Guchhait, M. Sarkar, S. Pareek, and N. Kim. 2019. “Impact of Safety Factors and Setup Time Reduction in a Two-echelon Supply Chain Management.” Robotics and Computer-Integrated Manufacturing 55: 250–258. doi:10.1016/j.rcim.2018.05.001.
- Sarkar, B., and I. Moon. 2014. “Improved Quality, Setup Cost Reduction, and Variable Backorder Costs in an Imperfect Production Process.” International Journal of Production Economics 155: 204–213. doi:10.1016/j.ijpe.2013.11.014.
- Sarkar, B., S. S. Sana, and K. S. Chaudhuri. 2011. “An Imperfect Production Process for Time Varying Demand with Inflation and Time Value of Money-an EMQ Model.” Expert Systems with Applications 38 (11): 13543–13548. doi:10.1016/j.eswa.2011.04.044.
- Sarkar, B., S. Saren, D. Sinha, and S. Hur. 2015. “Effect of Unequal Lot Sizes, Variable Setup Cost, and Carbon Emission Cost in a Supply Chain Model.” Mathematical Problems in Engineering 2015: 469486, 13 pages. doi:10.1155/2015/469486.
- Sarkar, B., C. Zhang, A. Majumder, M. Sarkar, and Y. W. Seo. 2018. “A Distribution Free Newsvendor Model with Consignment Policy and Retailer's Royalty Reduction.” International Journal of Production Research 56 (15): 5025–5044. doi:10.1080/00207543.2017.1399220.
- Tajbakhsh, M. M. 2010. “On the Distribution Free Continuous-review Inventory Model with a Service Level Constraint.” Computers & Industrial Engineering 59 (4): 1022–1024. doi: 10.1016/j.cie.2010.08.022
- Tayyab, M., and B. Sarkar. 2016. “Optimal Batch Quantity in a Cleaner Multi-stage Lean Production System with Random Defective Rate.” Journal of Cleaner Production 139: 922–934. doi:10.1016/j.jclepro.2016.08.062.
- Wu, J. W., W. C. Lee, and H. Y. Tsai. 2004. “A Note on Defective Units in an Inventory Model with Sub-lot Sampling Inspection for Variable Lead Time Demand with the Mixture of Free Distributions.” International Transactions in Operational Research 11 (3): 341–359. doi:10.1111/j.1475-3995.2004.00462.x.
- Yi, H., and B. R. Sarker. 2013. “An Optimal Consignment Stock Production and Replenishment Policy with Controllable Lead Time.” International Journal of Production Research 51 (21): 6316–6335. doi:10.1080/00207543.2013.795668.