268
Views
1
CrossRef citations to date
0
Altmetric
Articles

The scheduler’s balancing act of sensing and reacting: a behavioural perspective on scheduling

, ORCID Icon, &
Pages 3944-3955 | Received 16 Nov 2018, Accepted 22 Jun 2019, Published online: 04 Jul 2019

References

  • Batt, R. J., and C. Terwiesch. 2012. Doctors Under Load: An Empirical Study of State-dependent Service Times in Emergency Care. The Wharton School, The University of Pennsylvania, Philadelphia, PA. https://faculty.wharton.upenn.edu/wp-content/uploads/2012/11/DULnew_v6.pdf.
  • Berglund, M., J. Guinery, and J. Karltun. 2010. “The Unsung Contribution of Production Planners and Schedulers at Production and Sales Interfaces.” In Behavioral Operations in Planning and Scheduling, 47–81. Berlin: Springer.
  • Crawford, S., B. L. MacCarthy, J. R. Wilson, and C. Vernon. 1999. “Investigating the Work of Industrial Schedulers through Field Study.” Cognition, Technology & Work 1 (2): 63–77. doi: 10.1007/s101110050033
  • Croson, R., K. Schultz, E. Siemsen, and M. L. Yeo. 2013. “Behavioral Operations: The State of the Field.” Journal of Operations Management 31 (1–2): 1–5. doi: 10.1016/j.jom.2012.12.001
  • Czarniawska-Joerges, B. 2007. Shadowing: And Other Techniques for Doing Fieldwork in Modern Societies. Herndon, VA: Copenhagen Business School Press DK.
  • Czerwinski, M., E. Horvitz, and S. Wilhite. 2004. “A Diary Study of Task Switching and Interruptions.” Proceedings of the SIGCHI conference on Human Factors in Computing Systems, April, 175–182. ACM.
  • De Snoo, C., and W. van Wezel. 2010. “The Interconnectivity of Planning and Shop Floor: Case Description and Relocation Analysis.” In Behavioral Operations in Planning and Scheduling, edited by J. C. Fransoo, T. Wäfler, and J. Wilson, 31–43. Berlin: Springer.
  • De Snoo, C., W. Van Wezel, and R. J. Jorna. 2011. “ An Empirical Investigation of Scheduling Performance Criteria.” Journal of Operations Management 29: 2101–2122. doi: 10.1016/j.jom.2010.12.006
  • Eisenhardt, K. M., and M. E. Graebner. 2007. “Theory Building from Cases: Opportunities and Challenges.” Academy of Management Journal 50 (1): 25–32. doi: 10.5465/amj.2007.24160888
  • Gasser, R., K. Fischer, and T. Wäfler. 2010. “Decision Making in Planning and Scheduling: A Field Study of Planning Behaviour in Manufacturing.” In Behavioral Operations in Planning and Scheduling, edited by J. Fransoo, T. Waefler, and J. Wilson, 11–30. Berlin: Springer.
  • Gonzales, V., and G. Marks. 2004. “Constant, Constant, Multitasking Craziness.” In Proceedings CHI 2004, 113–120. New York: ACM Press.
  • Gralla, E., J. Goentzel, and C. Fine. 2016. “Problem Formulation and Solution Mechanisms: A Behavioral Study of Humanitarian Transportation Planning.” Production & Operations Management 25: 22–35. doi: 10.1111/poms.12496
  • Hopp, W. J., S. M. R. Iravani, and L. Fang. 2009. “White Collar Workforce Management: An Operations-Oriented Survey.” Production & Operations Management 18 (1): 1–32. doi: 10.1111/j.1937-5956.2009.01002.x
  • Hopp, W. J., S. M. Iravani, and G. Y. Yuen. 2007. “Operations Systems with Discretionary Task Completion.” Management Science 53 (1): 61–77. doi: 10.1287/mnsc.1060.0598
  • Jackson, T., R. Dawson, and D. Wilson. 2001. “The Cost of e-mail Interruption.” Journal of Systems and Information Technology 5 (1): 81–92. doi: 10.1108/13287260180000760
  • Jackson, S., J. R. Wilson, and B. L. MacCarthy. 2004. “New Model of Scheduling in Manufacturing: Tasks, Roles, and Monitoring.” Human Factors 46 (3): 533–550. doi: 10.1518/hfes.46.3.533.50393
  • Jett, Q. R., and J. M. George. 2003. “Source Work Interrupted: A Closer Look at the Role of Interruptions in Organizational Life.” The Academy of Management Review 28 (3): 494–507. doi: 10.5465/amr.2003.10196791
  • Kok, T. 2015. Cross-Chain Collaboration in the Fast Moving Consumer Goods Supply Chain. https://www.dinalog.nl/cross-chain-collaboration-in-the-fast-moving-consumer-goods-supply-chain/.
  • Larco, J., J. Fransoo, and V. Wiers. 2015. “Human Factors of a 4C.” In Cross-Chain Collaboration in the Fast Moving Consumer Goods Supply Chain, edited by T. de Kok, A. G. Dalen, J. van, and van J. Hillegersberg, 97–110. Eindhoven: Technische Universiteit Eindhoven. https://www.dinalog.nl/cross-chain-collaboration-in-the-fast-moving-consumer-goods-supply-chain/.
  • Larco-Martinelli, J. A., J. C. Fransoo, and V. C. S. Wiers. 2018. “Scheduling the Scheduling Task: A Time Management Perspective on Scheduling.” Cognition, Technology & Work 20 (1): 1–10. doi: 10.1007/s10111-017-0443-1
  • Law, Averill M. 2015. Simulation Modeling and Analysis. 5th ed. New York: McGraw-Hill Education.
  • Lee, H. L. 2004. “The Triple-A Supply Chain.” Harvard Business Review 82 (10): 102–112.
  • MacCarthy, B. L., and J. R. Wilson, eds. 2003. Human Performance in Planning and Scheduling. London: CRC Press.
  • Mark, G., V. Gonzales, and J. Harris. 2005. “No Task Left Behind? Examining the Nature of Fragmented Work.” In Proceedings CHI 2005, 321–330. New York: ACM Press.
  • McKay, K. N., and V. C. S. Wiers. 2003. “Planning, Scheduling and Dispatching Tasks in Production Control.” Cognition Technology Work 5: 82–93. doi: 10.1007/s10111-002-0117-4
  • Monsell, S. P. 2003. “Task Switching TRENDS in Cognitive.” Sciences 7 (3): 134–140.
  • Pinedo, M. 1995. Scheduling: Theory, Algorithms, and Systems. Englewood Cliffs, NJ: Prentice Hall.
  • Pinedo, M. 2005. Planning and Scheduling in Manufacturing and Services. New York: Springer.
  • Renaud, K., J. Ramsay, and M. Hair. 2006. “‘You’ve Got Email!’ … Shall I Deal with it Now? Electronic Mail from the Recipient’s Perspective.” International Journal of Human-Computer Interaction 21 (3): 313–332. doi: 10.1207/s15327590ijhc2103_3
  • Romero-Silva, Rodrigo., Javier Santos, and Margarita Hurtado. 2015. “A Framework for Studying Practical Production Scheduling.” Production Planning & Control 26 (6): 438–450. doi: 10.1080/09537287.2014.919413
  • Rossetti, M. D. 2015. Simulation Modeling and Arena. Hoboken, NJ: John Wiley & Sons.
  • Sanderson, P. M. 1991. “Towards the Model Human Scheduler.” International Journal of Human Factors Manufacturing 1 (3): 195–219. doi: 10.1002/hfm.4530010302
  • Subramaniam, V., A. S. Raheja, and K. Rama Bhupal Reddy. 2005. “Reactive Repair Tool for Job Shop Schedules.” International Journal of Production Research 43 (1): 1–23. doi: 10.1080/0020754042000270412
  • Suddaby, R. 2006. “From the Editors: What Grounded Theory is Not.” Academy of Management Journal 49 (4): 633–642. doi: 10.5465/amj.2006.22083020
  • Tan, T. F., and S. Netessine. 2014. “When Does the Devil Make Work? An Empirical Study of the Impact of Workload on Worker Productivity.” Management Science 60 (6): 1574–1593. doi: 10.1287/mnsc.2014.1950
  • Van Donselaar, K. H., V. Gaur, T. Van Woensel, R. A. Broekmeulen, and J. C. Fransoo. 2010. “Ordering Behavior in Retail Stores and Implications for Automated Replenishment.” Management Science 56 (5): 766–784. doi: 10.1287/mnsc.1090.1141
  • Voss, C., N. Tsikriktsis, and M. Frohlich. 2002. “Case Research in Operations Management.” International Journal of Operations & Production Management 22 (2): 195–219. doi: 10.1108/01443570210414329
  • Webster, S., and M. Azizoglu. 2001. “Dynamic Programming Algorithms for Scheduling Parallel Machines with Family Setup Times.” Computers & Operations Research 28 (2): 127–137. doi: 10.1016/S0305-0548(99)00094-5
  • Wiers, V. C., and A. T. G. de Kok. 2017. Designing, Selecting, Implementing and Using APS Systems. Cham: Springer.
  • Wiers, V. C. S., and T. W. Van Der Schaaf. 1997. “A Framework for Decision Support in Production Scheduling Tasks.” Production Planning and Control 8 (6): 533–544. doi: 10.1080/095372897234876

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.