1,810
Views
5
CrossRef citations to date
0
Altmetric
Articles

Rolling Kanban: a new visual tool to schedule family batch manufacturing processes with kanban

ORCID Icon, ORCID Icon & ORCID Icon
Pages 3998-4014 | Received 12 Oct 2018, Accepted 27 Jun 2019, Published online: 11 Jul 2019

References

  • Aggarwal, S. C. 1985. “MRP, JIT, OPT, FMS?” Harvard Business Review 63 (5): 8–16.
  • Boyer, M. 2004. “Il Rolling Kanban (In Italian).” In Quaderni di Management, Issue 5. Milan: E.G.V. Edizioni Srl.
  • Brito, M., A. L. Ramos, P. Carneiroc, and M. A. Gonçalvesd. 2017. “Combining SMED Methodology and Ergonomics for Reduction of Setup in a Turning Production Area.” Procedia Manufacturing 13: 1112–1119. doi:10.1016/j.promfg.2017.09.172.
  • Brucker, P. 2004. Scheduling Algorithms. 4th ed. Berlin: Springer Verlag.
  • Ciano, M. P., R. Pozzi, T. Rossi, and F. Strozzi. 2019. “How IJPR has Addressed ‘Lean’: A Literature Review Using Bibliometric Tools.” International Journal of Production Research. doi:10.1080/00207543.2019.1566667.
  • Cimorelli, S. 2013. Kanban for the Supply Chain – Fundamental Practices for Manufacturing Management. 2nd ed. New York: Productivity Press. doi:10.4324/9780429295669.
  • Claudio, D., and A. Krishnamurthy. 2009. “Kanban-based Pull Systems with Advance Demand Information.” International Journal of Production Research 47 (12): 3139–3160. doi:10.1080/00207540701739589.
  • Faccio, M. 2014. “The Impact of Production mix Variations and Models Varieties on the Parts-feeding Policy Selection in a JIT Assembly System.” The International Journal of Advanced Manufacturing Technology 72 (1–4): 543–560. doi:10.1007/s00170-014-5675-0.
  • Gross, J. M., and K. R. McInnis. 2003. Kanban Made Simple: Demystifying and Applying Toyota's Legendary Manufacturing Process. New York: AMACOM.
  • Grunwald, H., P. E. T. Striekwold, and P. J. Weeda. 1989. “A Framework for Qualitative Comparison of Production Control Concepts.” International Journal of Production Research 27 (2): 281–292. doi:10.1080/00207548908942547.
  • Hirano, H. 2009. JIT Implementation Manual – The Complete Guide to Just-in-time Manufacturing. Volume 3: Flow Manufacturing – Multi-process Operations and Kanban. Boca Raton, FL: CRC Press.
  • Jaegler, Y., A. Jaegler, P. Burlat, S. Lamouri, and D. Trentesaux. 2018. “The ConWip Production Control System: A Systematic Review and Classification.” International Journal of Production Research 56 (17): 5736–5757. doi:10.1080/00207543.2017.1380325.
  • Junior, M. L., and M. G. Filho. 2010. “Variations of the Kanban System: Literature Review and Classification.” International Journal of Production Economics 125: 13–21. doi:10.1016/j.ijpe.2010.01.009.
  • King, P. L., and J. S. King. 2013. The Product Wheel Handbook: Creating Balanced Flow in High-mix Process Operations. New York: CRC Press.
  • Koukoumialos, S., and G. Liberopoulos. 2005. “An Analytical Method for the Performance Evaluation of Echelon Kanban Control Systems.” OR Spectrum 27 (2–3): 339–368. doi:10.1007/s00291-004-0188-0.
  • Krishnaiyer, K., and F. F. Chen. 2017. “A Cloud-based Kanban Decision Support System for Resource Scheduling & Management.” Procedia Manufacturing 11: 1489–1494. doi:10.1016/j.promfg.2017.07.280.
  • Kušar, J., T. Berlec, F. Žefran, and M. Starbek. 2010. “Reduction of Machine Set-up Time.” Journal of Mechanical Engineering 56 (12): 833–845.
  • Lane, G. 2007. Made-to-order Lean: Excelling in a High-mix, Low-volume Environment. New York: Productivity Press.
  • Miclo, R., M. Lauras, F. Fontanili, J. Lamothe, and S. A. Melnyk. 2019. “Demand Driven MRP: Assessment of a new Approach to Materials Management.” International Journal of Production Research 57 (1): 166–181. doi:10.1080/00207543.2018.1464230.
  • Millstein, M. A., and J. S. Martinich. 2014. “Takt Time Grouping: Implementing Kanban-flow Manufacturing in an Unbalanced, High Variation Cycle-time Process with Moving Constraints.” International Journal of Production Research 52 (23): 6863–6877. doi:10.1080/00207543.2014.910621.
  • Monden, Y. 2012. TOYOTA Production System. An Integrated Approach to Just-in-time. 4th ed. Boca Raton, FL: CRC Press.
  • Monma, C. L., and C. N. Potts. 1989. “On the Complexity of Scheduling with Batch set-up Times.” Operations Research 37 (5): 798–804. doi:10.1287/opre.37.5.798.
  • Mukhopadhyay, S. K., and S. Shanker. 2005. “Kanban Implementation at a Tyre Manufacturing Plant: A Case Study.” Production Planning & Control 16 (5): 488–499. doi:10.1080/09537280500121778.
  • Ohno, T. 1982. “The Origin of Toyota Production System and Kanban System.” Proceedings of the International Conference on Productivity and Quality Improvement, Tokyo.
  • Pinedo, M. L. 2016. Scheduling: Theory, Algorithms, and Systems. 5th ed. New York: Springer.
  • Piplani, R., and A. W. H. Ang. 2018. “Performance Comparison of Multiple Product Kanban Control Systems.” International Journal of Production Research 56 (3): 1299–1312. doi:10.1080/00207543.2017.1332436.
  • Potts, C. N., and M. Y. Kovalyov. 2000. “Scheduling with Batching: A Review.” European Journal of Operational Research 120 (2): 228–249. doi:10.1016/S0377-2217(99)00153-8.
  • Romero-Silva, R., and E. Marsillac. 2018. “Trends and Topics in IJPR from 1961 to 2017: A Statistical History.” International Journal of Production Research. doi:10.1080/00207543.2018.1551638.
  • Ruifeng, C., and V. Subramaniam. 2012. “Increasing Production Rate in Kanban Controlled Assembly Lines Through Preventive Maintenance.” International Journal of Production Research 50 (4): 991–1008. doi:10.1080/00207543.2011.551844.
  • Sayem, A., M. A. Islam, and M. M. A. Khan. 2014. “Productivity Enhancement Through Reduction of Changeover Time by Implementing SMED Technique – in Furniture Industry.” International Journal of Industrial and Systems Engineering 17 (1): 15–33. doi:10.1504/IJISE.2014.060820.
  • Shingo, S. 1985. A Revolution in Manufacturing: The SMED System. Portland: Productivity Press.
  • Sipper, D., and R. L. Bulfin. 1997. Production: Planning, Control, and Integration. New York: McGraw-Hill.
  • Sivakumar, G. D., and P. Shahabudeen. 2009. “Algorithms for the Design of a Multi-stage Adaptive Kanban System.” International Journal of Production Research 47 (23): 6707–6738. doi:10.1080/00207540802302071.
  • Smalley, A. 2009. Creating Level Pull – A Lean Production-system Improvement Guide for Production-control, Operations, and Engineering Professionals. Cambridge: Lean Enterprise Institute.
  • Thürer, M., N. O. Fernandes, M. Stevenson, Q. Ting, and D. C. Li. 2019. “Centralised vs. Decentralised Control Decision in Card-based Control Systems: Comparing Kanban Systems and COBACABANA.” International Journal of Production Research 57 (2): 322–337. doi:10.1080/00207543.2018.1425018.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.