Effectiveness of nervousness reduction policies when capacity is constrained

&
Pages 4121-4137 | Received 14 Mar 2019, Accepted 08 Jul 2019, Published online: 25 Jul 2019

References

  • Baker, K. R. 1977. “An Experimental Study of the Effectiveness of Rolling Schedules in Production Planning.” Decision Sciences 8: 19–27.
  • Blackburn, J. D., D. H. Kropp, and R. A. Millen. 1985. “MRP System Nervousness: Causes and Cures.” Engineering Costs and Production Economics 9: 141–146.
  • Blackburn, J. D., D. H. Kropp, and R. A. Millen. 1986. “A Comparison of Strategies to Dampen Nervousness in MRP Systems.” Management Science 32 (4): 413–429.
  • Blackburn, J. D., and R. A. Millen. 1980. “Heuristic Lot-sizing Performance in a Rolling-schedule Environment.” Decision Sciences 11 (4): 691–701.
  • Blackburn, J. D., and R. A. Millen. 1982. “The Impact of a Rolling Schedule in a Multi-Level MRP System.” Journal of Operations Management 2 (2): 125–135.
  • Campbell, K. L. 1971. “Scheduling is Not the Problem.” Production and Inventory Management 12 (3): 53–57.
  • Campbell, G. M. 1992. “Master Production Scheduling Under Rolling Planning Horizons with Fixed Order Intervals.” Decision Sciences 23 (2): 312–331.
  • Carlson, R. C., S. L. Beckman, and D. H. Kropp. 1982. “The Effectiveness of Extending the Horizon in Rolling Production Scheduling.” Decision Sciences 13 (1): 129–146.
  • Chu, C.-H., and J. C. Hayya. 1988. “Buffering Decisions Under MRP Environment: A Review.” Omega 16 (4): 325–331.
  • Chung, C.-H., and L. J. Krajewski. 1986. “Replanning Frequencies for Master Production Schedules.” Decision Sciences 17 (2): 263–273.
  • Collier, D. 1980. “The Interaction of Single-Stage Lot-Size Models in a Material Requirements Planning System.” Production and Inventory Management 21 (4): 11–17.
  • DeBodt, M. A., and L. N. Wassenhowe. 1983. “Cost Increases Due to Demand Uncertainty in MRP Lot-Sizing.” Decision Sciences 14 (3): 345–362.
  • Hayes, R. H., and K. B. Clark. 1985. “Explaining Observed Productivity Differentials Between Plants: Implications for Operations Research.” Interfaces 15 (6): 3–14.
  • Herrera, C., S. Belmokhtar-Berraf, A. Thomas, and V. Paradad. 2016. “A Reactive Decision-Making Approach to Reduce Instability in a Master Production Schedule.” International Journal of Production Research 54 (8): 2394–2404.
  • Ho, C.-J. 2002. “Evaluating Dampening Effects of Alternative lot-Sizing Rules to Reduce MRP System Nervousness.” International Journal of Production Research 40 (11): 2633–2652.
  • Ho, C.-J. 2005. “Examining Dampening Effects for Alternative Dampening Procedures to Cope with System Nervousness.” International Journal of Production Research 43 (19): 4009–4033.
  • Ho, C.-J., and P. L. Carter. 1996. “An Investigation of Alternative Dampening Procedures to Cope with MRP System Nervousness.” International Journal of Production Research 34 (1): 137–156.
  • Ho, C.-J., and T. C. Ireland. 1998. “Correlating MRP System Nervousness with Forecast Errors.” International Journal of Production Research 36 (8): 2285–2299.
  • Inman, R. R., and D. J. A. Gonsalvez. 1997. “The Causes of Schedule Instability in an Automotive Supply Chain.” Production & Inventory Management Journal 38 (2): 26–31.
  • Kadipasaoglu, S. N., and V. Sridharan. 1995. “Alternative Approaches for Reducing Schedule Instability in Multistage Manufacturing Under Demand Uncertainty.” Journal of Operations Management 13 (3): 193–211.
  • Kern, G. M., and J. C. Wei. 1996. “Master Production Rescheduling Policy in Capacity Constrained Just-In-Time Make-To-Stock Environments.” Decision Sciences 27 (2): 365–387.
  • Krajewski, L., and J. C. Wei. 2001. “The Value of Production Schedule Integration in Supply Chains.” Decision Sciences 32 (4): 601–634.
  • Krajewski, L., J. C. Wei, and L.-L. Tang. 2005. “Responding to Schedule Changes in Build-to-Order Supply Chains.” Journal of Operations Management 23 (1905): 452–469.
  • Kropp, D. H., and R. C. Carlson. 1984. “A Lot-Sizing Algorithm for Reducing Nervousness in MRP Systems.” Management Science 30 (2): 240–244.
  • Kropp, D. H., R. C. Carlson, and J. V. Jucker. 1979. “Use of Dynamic Lot-Sizing to Avoid Nervousness in Material Requirements Planning Systems.” Production and Inventory Management 20 (3): 40–58.
  • Kropp, D. H., R. C. Carlson, and J. V. Jucker. 1983. “Heuristic Lot-Sizing Approaches for Dealing with MRP System Nervousness.” Decision Sciences 14 (2): 156–169.
  • Law, K. M. Y. 2011. “Airline Catering Service Operation, Schedule Nervousness and Collective Efficacy on Performance: Hong Kong Evidence.” The Service Industries Journal 31 (6): 959–973.
  • Law, K. M. Y., and A. Gunasekaran. 2010. “A Comparative Study of Schedule Nervousness among High-Tech Manufacturers Across the Straits.” International Journal of Production Research 48 (20): 6015–6036.
  • Lin, N., and L. Krajewski. 1992. “A Model for Master Production Scheduling in Uncertain Environments.” Decision Sciences 23 (4): 839–861.
  • Lin, N., L. Krajewski, G. Keong-Leong, and W. C. Benton. 1994. “The Effects of Environmental Factors on the Design of Master Production Scheduling Systems.” Journal of Operations Management 11: 367–384.
  • Mather, H. 1977. “Reschedule the Reschedules You Just Rescheduled–Way of Life for MRP?” Production and Inventory Management 18 (1): 60–79.
  • Metters, R. D. 1993. “A Method for Achieving Better Customer Service, Lower Costs and Less Instability in Master Production Schedules.” Production & Inventory Management Journal 34 (4): 61–65.
  • Metters, R. D., and V. Vargas. 1999. “A Comparison of Production Scheduling Policies on Costs, Service Levels, and Schedule Changes.” Production and Operations Management 8 (1): 76–91.
  • Nedaei, H., and H. Mahlooji. 2014. “Joint Multi-Objective Master Production Scheduling and Rolling Horizon Policy Analysis in Make-to-Order Supply Chains.” International Journal of Production Research 52 (9): 2767–2787.
  • Newman, W. E., and V. Sridharan. 1992. “Manufacturing Planning and Control: Is There One Definitive Answer?” Production and Inventory Management 33 (1): 50–53.
  • Prentis, E. L., and B. M. Khumawala. 1989. “MRP Lot-Sizing with Variable Production/Purchasing Costs: Formulation and Solution.” International Journal of Production Research 27 (6): 965–984.
  • Pujawan, N. 2004. “Schedule Nervousness in a Manufacturing System: a Case Study.” Production Planning and Control 15 (5): 515–524.
  • Pujawan, N., and A. U. Smart. 2012. “Factors Affecting Schedule Instability in Manufacturing Companies.” International Journal of Production Research 50 (8): 2252–2266.
  • Robinson, E. P., F. Sahin, and L.-L. Gao. 2008. “Master Production Schedule Time Interval Strategies in Make-to-Order Supply Chains.” International Journal of Production Research 46 (7): 1933–1954.
  • Sahin, F., A. Narayanan, and E. P. Robinson. 2013. “Rolling Horizon Planning in Supply Chains: Review, Implications and Directions for Future Research.” International Journal of Production Research 51 (18): 5413–5436.
  • Sahin, F., E. P. Robinson, and L. Gao. 2008. “Master Production Scheduling Policy and Rolling Schedules in a Two-Stage Make-to-Order Supply Chain.” International Journal of Production Economics 115 (2): 528–541.
  • Sridharan, V., and W. L. Berry. 1990a. “Master Production Scheduling Make-To-Stock Products: A Framework for Analysis.” International Journal of Production Research 28 (3): 541–558.
  • Sridharan, V., and W. L. Berry. 1990b. “Freezing the Master Production Schedule Under Demand Uncertainty.” Decision Sciences 21 (1): 97–120.
  • Sridharan, V., W. L. Berry, and V. Udayabanu. 1987. “Freezing the Master Production Schedule Under Rolling Planning Horizons.” Management Science 33 (9): 1137–1149.
  • Sridharan, V., W. L. Berry, and V. Udayabanu. 1988. “Measuring Master Production Schedule Instability Under Rolling Planning Horizons.” Decision Sciences 19 (1): 147–166.
  • Sridharan, V., and R. L. LaForge. 1989. “The Impact of Safety Stock on Schedule Instability, Cost, and Service.” Journal of Operations Management 8 (4): 327–347.
  • Sridharan, V., and R. L. LaForge. 1990a. “On Using Buffer Stock to Combat Schedule Instability.” International Journal of Operations and Production Management 10 (7): 37–46.
  • Sridharan, V., and R. L. LaForge. 1990b. “An Analysis of Alternative Policies to Achieve Schedule Stability.” Journal of Manufacturing and Operations Management 3 (1): 53–73.
  • Sridharan, V., and R. L. LaForge. 1994a. “A Model to Estimate Service Levels When a Portion of the Master Production Schedule is Frozen.” Computers & Operations Research 21 (5): 477–486.
  • Sridharan, V., and R. L. LaForge. 1994b. “Freezing the Master Production Schedule:Implications for Fill Rate.” Decision Sciences 25 (3): 461–469.
  • Stadtler, H. 2000. “Improved Rolling Schedules for the Dynamic Single-Level Lot-Sizing Problem.” Management Science 46 (2): 318–326.
  • Steele, D. C. 1975. “The Nervous MRP System: How to do Battle.” Production and Inventory Management 16 (4): 83–89.
  • van Donselaar, K., J. van den Nieuwenhof, and J. Visschers. 2000. “The Impact of Material Coordination Concepts on Planning Stability in Supply Chains.” International Journal of Production Economics 68 (2): 169–176.
  • Venkataraman, R. 1996. “Frequency of Replanning in a Rolling Horizon Master Production Schedule for a Process Industry Environment: A Case Study.” Production and Operations Management 5 (3): 255–265.
  • Veral, E. A., and R. L. LaForge. 1985. “The Performance of a Simple Incremental Rule in a Multi-Level Inventory Environment.” Decision Sciences 16 (1): 57–72.
  • Wemmerlöv, U. 1989. “The Behavior of Lot-Sizing Procedures in the Presence of Forecast Errors.” Journal of Operations Management 8 (1): 37–47.
  • Wemmerlöv, U., and D. C. Whybark. 1984. “Lot-Sizing Under Uncertainty in a Rolling Schedule Environment.” International Journal of Production Research 22 (3): 467–484.
  • Xie, J., T. S. Lee, and X. Zhao. 2004. “Impact of Forecasting Error on the Performance of Capacitated Multi-Item Production Systems.” Computers & Industrial Engineering 46: 205–219.
  • Xie, J., X. Zhao, and T. Lee. 2003. “Freezing the Master Production Schedule Under Single Resource Constraint and Demand Uncertainty.” International Journal of Production Economics 83 (1): 65–84.
  • Yang, K. K., and F. R. Jacobs. 1999. “Replanning the Master Production Schedule for a Capacity Constrained Job Shop.” Decision Sciences 30 (3): 719–748.
  • Yano, C. A., and R. C. Carlson. 1985. “An Analysis of Scheduling Policies in Multiechelon Production Systems.” IIE Transactions 17 (4): 370–377.
  • Zhao, X., L. Fujun, and T. S. Lee. 2001. “Evaluation of Safety Stock Methods in Multilevel Material Requirements Planning (MRP) Systems.” Production Planning & Control 12 (8): 794–803.
  • Zhao, X., J. C. Goodale, and T. S. Lee. 1995. “Lot-sizing Rules and Freezing the Master Production Schedule in Material Requirements Planning Systems Under Demand Uncertainty.” International Journal of Production Research 33 (8): 2241–2276.
  • Zhao, X., and K. Lam. 1997. “Lot-sizing Rules and Freezing the Master Production Schedule in Material Requirements Planning Systems.” International Journal of Production Economics 53: 281–305.
  • Zhao, X., and T. S. Lee. 1993. “Freezing the Master Production Schedule for Material Requirements Planning Systems Under Demand Uncertainty.” Journal of Operations Management 11 (2): 185–205.
  • Zhao, X., and T. S. Lee. 1996. “Freezing the Master Production Schedule in Multilevel Material Requirements Planning System Under Deterministic Demand.” Production Planning & Control 7: 144–161.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.