References
- Aziz, N. A., D. A. Wahab, R. Ramil, and C. H. Azhari. 2016. “Modelling and Optimisation of Upgradability in the Design of Multiple Life Cycle Products: a Critical Review.” Journal of Cleaner Production 112 (1): 282–290. doi:10.1016/j.jclepro.2015.08.076.
- Braglia, M., D. Castellano, and M. Frosolini. 2014. “Safety Stock Management in Single Vendor-single Buyer Problem Under VMI with Consignment Stock Agreement.” International Journal of Production Economics 154: 16–31. doi:10.1016/j.ijpe.2014.04.007.
- Cárdenas-Barrón, L. E.. 2008. “Optimal Manufacturing Batch Size with Rework in a Single-stage Production System-A Simple Derivation.” Computers & Industrial Engineering 55 (4): 758–765. doi:10.1016/j.cie.2007.07.017.
- Cárdenas-Barrón, L. E.. 2009. “Economic Production Quantity with Rework Process At a Single-stage Manufacturing System with Planned Backorders.” Computers & Industrial Engineering 57 (3): 1105–1113. doi:10.1016/j.cie.2009.04.020.
- Cárdenas-Barrón, L. E.. 2011. “The Derivation of EOQ/EPQ Inventory Models with Two Backorders Costs Using Analytic Geometry and Algebra.” Applied Mathematical Modelling 35 (5): 2394–2407. doi:10.1016/j.apm.2010.11.053.
- Cheikhrouhou, N., B. Sarkar, B. Ganguly, and Y. H. Lee. 2018. “Optimization of Sample Size and Order Size in An Inventory Model with Quality Inspection and Return of Defective Items.” Annals of Operations Research 271 (2): 445–467. doi:10.1007/s10479-017-2511-6.
- Das Roy, M., and S. S. Sana. 2017. “Random Sales Price-sensitive Stochastic Demand: An Imperfect Production Model with Free Repair Warranty.” Journal of Advances in Management Research 14 (4): 408–424. doi:10.1108/JAMR-10-2016-0086.
- Das Roy, M., S. S. Sana, and K. Chaudhuri. 2011a. “An Economic Order Quantity Model of Imperfect Quality Items with Partial Backlogging.” International Journal of Systems Science 42 (8): 1409–1419. doi:10.1080/00207720903576498.
- Das Roy, M., S. S. Sana, and K. Chaudhuri. 2011b. “An EOQ Model for Imperfect Quality Products with Partial Backlogging – a Comparative Study.” International Journal of Services and Operations Management 9 (1): 83–110. doi:10.1504/IJSOM.2011.040323.
- Das Roy, M., S. S. Sana, and K. Chaudhuri. 2012. “An Integrated Producer-buyer Relationship in the Environment of EMQ and JIT Production Systems.” International Journal of Production Research 50 (19): 5597–5614. doi:10.1080/00207543.2011.650866.
- Das Roy, M., S. S. Sana, and K. Chaudhuri. 2014. “An Economic Production Lot Size Model for Defective Items with Stochastic Demand, Backlogging and Rework.” IMA Journal of Management Mathematics 25 (2): 159–183. doi:10.1093/imaman/dpt001.
- De, S. K., and S. S. Sana. 2015. “Backlogging EOQ Model for Promotional Effort and Selling Price Sensitive Demand- An Intuitionistic Fuzzy Approach.” Annals of Operations Research 233 (1): 57–76 doi:10.1007/s10479-013-1476-3
- Dey, B. K., B. Sarkar, M. Sarkar, and S. Pareek. 2019. “An Integrated Inventory Model Involving Discrete Setup Cost Reduction, Variable Safety Factor, Selling-price Dependent Demand, and Investment.” RAIRO-Operations Research 53 (1): 39–57. doi:10.1051/ro/2018009.
- Dhargalkar, K., K. Shinde, and Y. Arora. 2016. “A Universal New Product Development and Upgradation Framework.” Journal of Innovation and Entrepreneurship 5 (27): 1–16. doi:10.1186/s13731-016-0055-7.
- Durakbasa, N. M., J. M. Bauer, G. Bas, and L. Kräuter. 2016. “Novel Trends in the Development of Autonomation and Robotics in Metrology for Production in the Future.” IFAC-PapersOnLine 49 (29): 6–11. doi:10.1016/j.ifacol.2016.11.057.
- Giri, B. C., and T. Dohi. 2005. “Exact Formulation of Stochastic EMQ Model for An Unreliable Production System.” Journal of Operational Research Society 56 (5): 563-575. doi:10.1057/palgrave.jors.2601840.
- Goyal, S. K., and L. E. Cárdenas-Barrón. 2002. “Note on: Economic Production Quantity Model for Items with Imperfect Quality-a Practical Approach.” International Journal of Production Economics 77 (1): 85–87. doi:10.1016/S0925-5273(01)00203-1.
- Kang, C. W., M. Ullah, and B. Sarkar. 2017. “Impact of Random Defective Rate on Lot Size Focusing Work-in-process Inventory in Manufacturing System.” International Journal of Production Research 55 (6): 1748–1766. doi:10.1080/00207543.2016.1235295.
- Khan, M., M. Hussain, and L. E. Cárdenas-Barrón. 2017. “Learning and Screening Errors in An EPQ Inventory Model for Supply Chains with Stochastic Lead Time Demands.” International Journal of Production Research 55 (16): 4816–4832. doi:10.1080/00207543.2017.1310402.
- Khan, M., M. Y. Jaber, and M. Bonney. 2011. “An Economic Order Quantity (EOQ) for Items with Imperfect Quality and Inspection Errors.” International Journal of Production Economics 133 (1): 113–118. doi:10.1016/j.ijpe.2010.01.023.
- Khanra, S., B. Mandal, and B. Sarkar. 2013. “An Inventory Model with Time Dependent Demand and Shortages Under Trade Credit Policy.” Economic Modelling 35: 349–355. doi:10.1016/j.econmod.2013.07.031.
- Khanra, S., S. S. Sana, and K. Chudhuri. 2010. “An EOQ Model for Perishable Item with Stock and Price Dependent Demand Rate.” International Journal of Mathematics in Operational Research 2 (3): 320–335. doi:10.1504/IJMOR.2010.032721.
- Khouja, M., and A. Mehrez. 1994. “Economic Production Lot Size Model with Variable Production Rate and Imperfect Quality.” Journal of Operations Research Socity 4 (12): 1405–1417. doi:10.2307/2583934.
- Kumar, K., and T. Aouam. 2018. “Effect of Setup Time Reduction on Supply Chain Safety Stocks.” Journal of Manufacturing Systems 49: 1–15. doi:10.1016/j.jmsy.2018.08.001.
- Majumder, A., C. K. Jaggi, and B. Sarkar. 2018. “A Multi-retailer Supply Chain Model with Backorder and Variable Production Cost.” RAIRO-Operations Research 52 (3): 943–954. doi:10.1051/ro/2017013.
- Pal, B., S. S. Sana, and K. Chudhuri. 2012. “A Mathematical Model on EPQ for Stochastic Demand in An Imperfect Production System.” Journal of Manufacturing Systems 32 (1): 260–270. doi:10.1016/j.jmsy.2012.11.009.
- Pal, B., S. S. Sana, and K. Chudhuri. 2012. “Multi-item EOQ Model While Demand is Sales Price and Price Break Sensitive.” Applied Mathematics and Computation 29 (6): 2283–2288. doi:10.1016/j.econmod.2012.06.039.
- Pal, B., S. S. Sana, and K. Chudhuri. 2014. “Joint Pricing and Ordering Policy for Two Echelon Imperfect Production Inventory Model with Two Cycles.” International Journal of Production Economics 155: 229–238. doi:10.1016/j.ijpe.2013.11.027.
- Panda, S., N. M. Modak, S. S. Sana, and M. Basu. 2014. “Pricing and Replenishment Policies in Dual-channel Supply Chain Under Continuous Unit Cost Decrease.” Applied Mathematics and Computation 256: 913–929. doi:10.1016/j.amc.2015.01.081.
- Ramzan, M. B., S. M. Qureshi, S. I. Mari, M. S. Memon, M. Mittal, M. Imran, and M. W. Iqbal. 2019. “Effect of Time-Varying Factors on Optimal Combination of Quality Inspectors for Offline Inspection Station.” Mathematics 7 (1): 51. doi:10.3390/math7010051.
- Sana, S. S.. 2010a. “An Economic Production Lot Size Model in An Imperfect Production System.” European Journal of Operational Research 201 (1): 158–170. doi:10.1016/j.ejor.2009.02.027.
- Sana, S. S.. 2010b. “A Production-inventory Model in An Imperfect Production Process.” European Journal of Operational Research 200 (2): 451–464. doi:10.1016/j.ejor.2009.01.041.
- Sana, S. S.. 2010c. “Optimal Selling Price and Lotsize with Time Varying Deterioration and Partial Backlogging.” Applied Mathematics and Computation 217 (1): 185–194. doi:10.1016/j.amc.2010.05.040.
- Sana, S. S.. 2011. “Price-sensitive Demand for Perishable Items-an EOQ Model.” Applied Mathematics and Computation 217 (13): 6248–6259. doi:10.1016/j.amc.2010.12.113.
- Sana, S. S.. 2012. “Preventive Maintenance and Optimal Buffer Inventory for Products Sold with Warranty in An Imperfect Production System.” International Journal of Production Research 50 (23): 6763–6774. doi:10.1080/00207543.2011.623838.
- Sana, S. S., S. K. Goyal, and K. S. Chaudhuri. 2007. “An Imperfect Production Process in a Volume Flexible Inventory Model.” International Journal of Production Economics 105: 548–559. doi:10.1016/j.ijpe.2006.05.005.
- Sarkar, B.. 2016. “Supply Chain Coordination with Variable Backorder, Inspections, and Discount Policy for Fixed Lifetime Products.” Mathematical Problems in Engineering 6918737: 1–14. doi:10.1155/2016/6318737.
- Sarkar, B., L. E. Cárdenas-Barrón, M. Sarkar, and M. L. Singgih. 2014. “An Economic Production Quantity Model with Random Defective Rate, Rework Process and Backorders for a Single Stage Production System.” Journal of Manufacturing Systems 33 (3): 432–435. doi:10.1016/j.jmsy.2014.02.001.
- Sarkar, M., and B. D. Chung. 2019. “Flexible Work-in-process Production System in Supply Chain Management Under Quality Improvement.” International Journal of Production Research 1–18. Article in Press. doi:10.1080/00207543.2019.1634851.
- Sarkar, B., A. Majumder, M. Sarkar, N. Kim, and M. Ullah. 2018. “Effects of Variable Production Rate on Quality of Products in a Single-vendor Multi-buyer Supply Chain Management.” The International Journal of Advanced Manufacturing Technology 99 (1–4): 567–581. doi:10.1007/s00170-018-2527-3.
- Sarkar, B., S. S. Sana, and K. Chudhuri. 2010a. “Optimal Reliability, Production Lotsize and Safety Stock in An Imperfect Production System.” International Journal of Mathematics in Operational Research 3 (4): 467–490. doi:10.1504/IJMOR.2010.033441.
- Sarkar, B., S. S. Sana, and K. Chudhuri. 2010b. “Optimal Reliability, Production Lotsize and Safety Stock: An Economic Manufacturing Quantity Model.” International Journal of Management Science and Engineering Management 5 (3): 192–202. doi:10.1080/17509653.2010.10671108.
- Sarkar, B., S. S. Sana, and K. Chudhuri. 2011. “An Imperfect Production Process for Time Varying Demand with Inflation and Time Value of Money-an EMQ Model.” Expert Systems with Applications 38 (11): 13 543–13 548. doi:10.1016/j.eswa.2011.04.044.
- Sarkar, B., and S. Saren. 2016. “Product Inspection Policy for An Imperfect Production System with Inspection Errors and Warranty Cost.” European Journal of Operational Research 248 (1): 263–271. doi:10.1016/j.ejor.2015.06.021.
- Sarkar, B., M. Ullah, and N. Kim. 2017. “Environmental and Economic Assessment of Closed- Loop Supply Chain with Remanufacturing and Returnable Transport Items.” Computers & Industrial Engineering 111 (11): 148–163. doi:10.1016/j.cie.2017.07.003.
- Sett, B. K., S. Sarkar, and B. Sarkar. 2017. “Optimal Buffer Inventory and Inspection Errors in An Imperfect Production System with Preventive Maintenance.” International Journal of Advanced Manufacturing Technology 90 (1–4): 545–560. doi:10.1007/s00170-016-9359-9.
- Shin, D., M. Mittal, and B. Sarkar. 2018. “Effects of Human Errors and Trade-credit Financing in Two-echelon Supply Chain Models.” European Journal Industrial Engineering 12 (4): 465–503. doi:10.1504/EJIE.2018.093574.
- Tai, A. H.. 2015. “An EOQ Model for Imperfect Quality Items with Multiple Quality Characteristic Screening and Shortage Backordering.” European Journal of Industrial Engineering 9 (2): 261–276. doi:10.1504/EJIE.2015.068657.
- Taleizadeh, A. A., L. E. Cárdenas-Barrón, J. Biabani, and R. Nikousokhan. 2012. “Multi Products Single Machine EPQ Model with Immediate Rework Process.” International Journal of Industrial Engineering Computations 3 (2): 93–102. doi:10.5267/j.ijiec.2011.09.001.
- Taleizadeh, A. A., S. S. Kalantari, and L. E. Cárdenas-Barrón. 2016. “Pricing and Lot Sizing for An EPQ Inventory Model with Rework and Multiple Shipments.” TOP 24 (1): 143–155. doi:10.1007/s11750-015-0377-9.
- Taleizadeh, A. A., S. T. A. Niaki, and H. M. Wee. 2013. “Joint Single Vendor-single Buyer Supply Chain Problem with Stochastic Demand and Fuzzy Lead-time.” Knowledge-Based Systems 48: 1–9. doi:10.1016/j.knosys.2013.03.011.
- Taleizadeh, A. A., M. Noori-daryan, and R. T. Moghaddam. 2015. “Pricing and Ordering Decisions in a Supply Chain with Imperfect Quality Items and Inspection Under Buyback of Defective Items.” International Journal of Production Research 53 (15): 4553–4582. doi:10.1080/00207543.2014.997399.
- Tayyab, M., and B. Sarkar. 2016. “Optimal Batch Quantity in a Cleaner Multi-stage Lean Production System with Random Defective Rate.” Journal of Cleaner Production 139: 922–934. doi:10.1016/j.jclepro.2016.08.062.
- Vareda, J.. 2010. “Access Regulation and the Incumbent Investment in Quality-upgrades and in Cost-reduction.” Tele. Policy 34 (11): 697–710. doi:10.1016/j.telpol.2010.09.003.