References
- Agarwal, G., S. Barari, and M. K. Tiwari. 2012. “A PSO-based Optimum Consumer Incentive Policy for WEEE Incorporating Reliability of Components.” International Journal of Production Research 50 (16): 4372–4380. doi:10.1080/00207543.2011.590538.
- Ahiska, S. S., F. Gocer, and R. E. King. 2017. “Heuristic Inventory Policies for a Hybrid Manufacturing/Remanufacturing System with Product Substitution.” Computers and Industrial Engineering 114: 206–222. doi:10.1016/j.cie.2017.10.014.
- Aydin, R., C. K. Kwong, and P. Ji. 2015. “A Novel Methodology for Simultaneous Consideration of Remanufactured and New Products in Product Line Design.” International Journal of Production Economics 169: 127–140. doi:10.1016/j.ijpe.2015.07.022.
- Bakal, I. S., and E. Akcali. 2006. “Effects of Random Yield in Remanufacturing with Price-sensitive Supply and Demand.” Production and Operations Management 15 (3): 407–420. doi:10.1111/j.1937-5956.2006.tb00254.x.
- Baptista, S., M. I. Gomes, and A. P. Barbosa-povoa. 2012. “A Two-stage Stochastic Model for the Design and Planning of a Multi-product Closed Loop Supply Chains.” In European Symposium on Computer Aided Process Engineering. Vol. 22., edited by I. D. L. Bogle and M. Fairweather, 1–5. London: Elsevier.
- Benedito, E., and A. Corominas. 2010. “Optimal Manufacturing and Remanufacturing Capacities of Systems with Reverse Logistics and Deterministic Uniform Demand.” Journal of Industrial Engineering and Management 3 (1): 33–53. doi:10.3926/jiem.2010.v3n1.p33-53.
- Benjaafar, S., G. Jean-Philippe, and S. Tepe. 2010. “Optimal Control of a Production-inventory System with Customer Impatience.” Operations Research Letters 38: 267–272. doi:10.1016/j.orl.2010.03.008.
- Birge, J. R., and F. Louveaux. 2011. Introduction to Stochastic Programming. Springer Science+Business Media New York. doi:10.1007/978-1-4614-0237-4.
- Bradley, J. R., and P. W. Glynn. 2002. “Managing Capacity and Inventory Jointly in Manufacturing Systems.” Management Science 48 (2): 273–288. doi:10.1287/mnsc.48.2.273.254.
- Bulmuş, S. C., S. X. Zhu, and R. Teunter. 2013. “Capacity and Production Decisions under a Remanufacturing Strategy.” International Journal of Production Economics 145 (1): 359–370. doi:10.1016/j.ijpe.2013.04.052.
- Bulmus, S. C., S. X. Zhu, and R. Teunter. 2014. “Competition for Cores in Remanufacturing.” European Journal of Operational Research 233 (1): 105–113. doi:10.1016/j.ejor.2013.08.025.
- Cai, X., M. Lai, X. Li, Y. Li, and X. Wu. 2014. “Optimal Acquisition and Production Policy in a Hybrid Manufacturing/ Remanufacturing System with Core Acquisition at Different Quality Levels.” European Journal of Operational Research 233 (2): 374–382. doi:10.1016/j.ejor.2013.07.017.
- Campana, G., R. J. Howlett, R. Setchi, and B. Cimatti. 2017. “Sustainable Design and Manufacturing 2017.” Smart Innovation, Systems and Technologies 68. doi:10.1007/978-3-319-57078-5_30.
- Chang, X., Y. Li, Y. Zhao, W. Liu, and J. Wu. 2017. “Effects of Carbon Permits Allocation Methods on Remanufacturing Production Decisions.” Journal of Cleaner Production 152: 281–294. doi:10.1016/j.jclepro.2017.02.175.
- Chen, M., and P. Abrishami. 2014. “A Mathematical Model for Production Planning in Hybrid Manufacturing- Remanufacturing Systems.” The International Journal of Advanced Manufacturing Technology 71 (5–8): 1187–1196. doi:10.1007/s00170-013-5538-0.
- Denizel, M., M. Ferguson, and G. G. C. Souza. 2010. “Multiperiod Remanufacturing Planning with Uncertain Quality of Inputs.” IEEE Transactions on Engineering Management 57 (3): 394–404. doi:10.1109/TEM.2009.2024506.
- Diallo, C., U. Venkatadri, A. Khatab, and S. Bhakthavatchalam. 2017. “State of the Art Review of Quality, Reliability and Maintenance Issues in Closed-loop Supply Chains with Remanufacturing.” International Journal of Production Research 55 (5): 1277–1296. doi:10.1080/00207543.2016.1200152.
- Drake, M. J., D. W. Pentico, and R. P. Sroufe. 2012. “The Remanufacturing Newsvendor Problem.” In Handbook of Newsvendor Problems, edited by Tsan-Ming Choi, 249–262. Springer Science+Business Media New York. doi:10.1007/978-1-4614-3600-3.
- El-Sayed, M., N. Afia, and A. El-Kharbotly. 2010. “A Stochastic Model for Forward-reverse Logistics Network Design under Risk.” Computers and Industrial Engineering 58 (3): 423–431. doi:10.1016/j.cie.2008.09.040.
- Fang, C., X. Liu, P. M. Pardalos, J. Long, J. Pei, and C. Zuo. 2017. “A Stochastic Production Planning Problem in Hybrid Manufacturing and Remanufacturing Systems with Resource Capacity Planning.” Journal of Global Optimization 68 (4): 851–878. doi:10.1007/s10898-017-0500-6.
- Flapper, S. D., J. P. Gayon, and L. L. Lim. 2014. “On the Optimal Control of Manufacturing and Remanufacturing Activities with a Single Shared Server.” European Journal of Operational Research 234: 86–98. doi:10.1016/j.ejor.2013.10.049.
- García-Alvarado, M., M. Paquet, A. Chaabane, and L. Amodeo. 2017. “Inventory Management under Joint Product Recovery and Cap-and-Trade Constraints.” Journal of Cleaner Production 167: 1499–1517. doi:10.1016/j.jclepro.2016.10.074.
- Garza-Reyes, J. A., A. S. Valls, S. P. Nadeem, A. Anosike, and V. Kumar. 2018. “A Circularity Measurement Toolkit for Manufacturing SMEs.” International Journal of Production Research, 7543. doi:10.1080/00207543.2018.1559961.
- Gayon, J., S. Vercraene, and S. D. P. Flapper. 2017. “Optimal Control of a Production-inventory System with Product Returns and Two Disposal Options.” European Journal of Operational Research, 1–10. doi: 10.1016/j.ejor.2017.03.018.
- Geissdoerfer, M., P. Savaget, N. M. P. Bocken, and J. E. Hultink. 2017. “The Circular Economy - A New Sustainability Paradigm?” Journal of Cleaner Production 143: 757–768. doi:10.1016/j.jclepro.2016.12.048.
- Gicquel, C., S. Kedad-sidhoum, and D. Quadri. 2016. “Remanufacturing Planning under Uncertainty: A Two-stage Stochastic Programming Approach.” International Conference on In- Formations Systems, Logistics and Supply Chain. https://hal.archives-ouvertes.fr/hal-01294592.
- Gong, X., and X. Chao. 2013. “Optimal Control Policy for Capacitated Inventory Systems with Remanufacturing.” Operations Research 61 (3): 603–611. doi:10.1287/opre.2013.1168.
- Guide Jr., V. D. R., R. H. Teunter, and L. N. Van Wassenhove. 2003. “Matching Demand and Supply to Maximize Profits from Remanufacturing.” Manufacturing and Service Operations Management 5 (4): 303–316. doi:10.1287/msom.5.4.303.24883.
- Güler, M. G., T. Bilgiç, and R. Güllü. 2014. “Joint Inventory and Pricing Decisions When Customers Are Delay Sensitive.” International Journal of Production Economics 157 (1): 302–312. doi:10.1016/j.ijpe.2014.04.028.
- Gupta, N., G. Dutta, and R. Fourer. 2014. “A Multi-period Two Stage Stochastic Programming Based Decision Support System for Strategic Planning in Process Industries: A Case of an Integrated Iron and Steel Company.” IIMA Working Papers WP2014-04-04): 1–38.
- Hazen, B. T., D. A. Mollenkopf, and Y. Wang. 2016. “Remanufacturing for the Circular Economy: An Examination of Consumer Switching Behavior.” Business Strategy and the Environment, 451–464. doi:10.1002/bse.1929.
- Hu, Z., and G. Hu. 2016. “A Two-stage Stochastic Programming Model for Lot-sizing and Scheduling under Uncertainty.” International Journal of Production Economics 180: 198–207. doi:10.1016/j.ijpe.2016.07.027.
- Huang, Y., and Z. Wang. 2019. “Pricing and Production Decisions in a Closed-loop Supply Chain Considering Strategic Consumers and Technology Licensing.” International Journal of Production Research 57 (9): 2847–2866. doi:10.1080/00207543.2018.1530470.
- Jaca, C., V. Prieto-Sandova, E. Psomas, and M. Ormazaba. 2018. “What should consumer organizations do to drive environmental sustainability.” Journal of Cleaner Production 181: 201–208. doi:10.1016/j.jclepro.2018.01.182.
- Jammernegg, W., and G. Reiner. 2007. “Performance Improvement of Supply Chain Processes by Coordinated Inventory and Capacity Management.” International Journal of Production Economics 108 (1–2): 183–190. doi:10.1016/j.ijpe.2006.12.047.
- Jensen, J. P., S. M. Prendeville, N. M. P. Bocken, and D. Peck. 2019. “Creating Sustainable Value through Remanufacturing: Three Industry Cases.” Journal of Cleaner Production 218: 304–314. doi:10.1016/j.jclepro.2019.01.301.
- Kall, P., and S. W. Wallace. 1994. Stochastic Programming. John Wiley & Sons. doi:10.1037/023990.
- Kalverkamp, M., and T. Raabe. 2018. “Automotive Remanufacturing in the Circular Economy in Europe: Marketing System Challenges.” Journal of Macromarketing 38 (1): 112–130. doi:10.1177/0276146717739066.
- Kaya, O. 2010. “Incentive and Production Decisions for Remanufacturing Operations.” European Journal of Operational Research 201 (2): 442–453. doi:10.1016/j.ejor.2009.03.007.
- Kenné, J. P., P. Dejax, and A. Gharbi. 2012. “Production Planning of a Hybrid Manufacturingremanufacturing System under Uncertainty within a Closed-loop Supply Chain.” International Journal of Production Economics 135 (1): 81–93. doi:10.1016/j.ijpe.2010.10.026.
- Khan, M. A., S. Mittal, S. West, and T. Wuest. 2018. “Review on Upgradability – A Product Lifetime Extension Strategy in the Context of Product Service Systems.” Journal of Cleaner Production 204: 1154–1168. doi:10.1016/j.jclepro.2018.08.329.
- Kumar, A., R. B. Chinnam, and A. Murat. 2017. “Hazard Rate Models for Core Return Modeling in Auto Parts Remanufacturing.” International Journal of Production Economics 183: 354–361. doi:10.1016/j.ijpe.2016.07.002.
- Kurilova-Palisaitiene, J., E. Sundin, and B. Poksinska. 2018. “Remanufacturing Challenges and Possible Lean Improvements.” Journal of Cleaner Production 172: 3225–3236. doi:10.1016/j.jclepro.2017.11.023.
- Lu, Q., M. Goh, M. Garg, and R. D. Souza. 2014. “Remanufacturing in Asia: Location Choice and Outsourcing.” The International Journal of Logistics Management 25: 20–34. doi:10.1108/IJLM-10-2012-0125.
- Lund, Robert T. 1984. “Remanufacturing : The Experience of the United States and Implications for Developing Countries.” World Bank Technical Paper 31.
- Ma, L., X. Su, C. Wang, K. Lin, and M. Lin. 2017. “Consumers’ Intention to Purchase Remanufactured Electronic Products: An Empirical Study in China.” In 14th International Conference on Services Systems and Services Management, ICSSSM 2017 - Proceedings, no. 71471118: 4–9. doi:10.1109/ICSSSM.2017.7996179.
- Macedo, P. B., D. Alem, M. Santos, M. L. Junior, and A. Moreno. 2016. “Hybrid Manufacturing and Remanufacturing Lot-sizing Problem with Stochastic Demand, Return, and Setup Costs.” The International Journal of Advanced Manufacturing Technology 82: 1241–1257. doi:10.1007/s00170-015-7445-z.
- Mardan, E., M. S. Amalnik, and M. Rabbani. 2015. “An Integrated Emergency Ordering and Production Planning Optimization Model with Demand and Yield Uncertainty.” International Journal of Production Research 53 (20): 6023–6039. doi:10.1080/00207543.2015.1008109.
- Miao, Z., H. Mao, K. Fu, and Y. Wang. 2018. “Remanufacturing with Trade-ins under Carbon Regulations.” Computers and Operations Research 89: 253–268. doi:10.1016/j.cor.2016.03.014.
- Mitra, S. 2016. “Models to Explore Remanufacturing as a Competitive Strategy under Duopoly.” Omega 59: 215–227. doi:10.1016/j.omega.2015.06.009.
- Mukhopadhyay, S. K., and H. Ma. 2009. “Joint Procurement and Production Decisions in Remanufacturing under Quality and Demand Uncertainty.” International Journal of Production Economics 120: 5–17. doi:10.1016/j.ijpe.2008.07.032.
- Mula, J., R. Poler, J. P. Garcia-Sabater, and F. C. Lario. 2006. “Models for Production Planning under Uncertainty: A Review.” International Journal of Production Economics 103: 271–285. doi:10.1016/j.ijpe.2005.09.001.
- Muranko, Z., D. Andrews, I. Chaer, and E. J. Newton. 2019. “Circular Economy and Behaviour Change: Using Persuasive Communication to Encourage Pro-circular Behaviours towards the Purchase of Remanufactured Refrigeration Equipment.” Journal of Cleaner Production 222: 499–510. doi:10.1016/j.jclepro.2019.02.219.
- Muranko, Ż., D. Andrews, I. Chaer, E. J. Newton, and P. Proudman. 2019. “Encouraging Remanufacturing in the Retail Refrigeration Industry.” Energy Procedia 161: 283–291. doi:10.1016/j.egypro.2019.02.093.
- Polotski, V., J. Kenne, and A. Gharbi. 2017. “Production and Setup Policy Optimization for Hybrid Manufacturing – Remanufacturing Systems.” International Journal of Production Economics 183: 322–333.
- Polotski, V., J. P. Kenné, and A. Gharbi. 2019. “Production Control of Hybrid Manufacturing–Remanufacturing Systems under Demand and Return Variations.” International Journal of Production Research 57 (1): 100–123. doi:10.1080/00207543.2018.1461272.
- Prahinski, C., and C. Kocabasoglu. 2006. “Empirical Research Opportunities in Reverse Supply Chains.” Omega 34: 519–532. doi:10.1016/j.omega.2005.01.003.
- Reddy, K. N., A. Kumar, and E. E. F. Ballantyne. 2018. “A Three-phase Heuristic Approach for Reverse Logistics Network Design Incorporating Carbon Footprint.” International Journal of Production Research, 1–25. doi:10.1080/00207543.2018.1526422.
- Richey, R. G., P. J. Daugherty, S. E. Genchev, and C. W. Autry. 2004. “Reverse Logistics: The Impact of Timing and Resources.” Journal of Business Logistics 25 (2): 229–250. doi:10.1002/j.2158-1592.2004.tb00188.x.
- Rogers, D. S., and R. Tibben-Lembke. 2001. “An Examination of Reverse Logistics Practices.” Journal of Business Logistics 22 (2): 129–148. doi:10.1002/j.2158-1592.2001.tb00007.x.
- Shi, J., G. Zhang, and J. Sha. 2011. “Optimal Production Planning for a Multi-product Closed Loop System with Uncertain Demand and Return.” Computers and Operations Research 38 (3): 641–650. doi:10.1016/j.cor.2010.08.008.
- Subramanian, R., M. E. Ferguson, and L. B. Toktay. 2013. “Remanufacturing and the Component Commonality Decision.” Production and Operations Management 22 (1): 36–53. doi:10.1111/j.1937-5956.2012.01350.x.
- Summerfield, N. S., and M. Dror. 2012. “Stochastic Programming for Decentralized Newsvendor with Transshipment.” International Journal of Production Economics 137 (2): 292–303. doi:10.1016/j.ijpe.2012.02.014.
- Sun, H., W. Chen, B. Liu, and X. Chen. 2018. “Economic Lot Scheduling Problem in a Remanufacturing System with Returns at Different Quality Grades.” Journal of Cleaner Production 170: 559–569. doi:10.1016/j.jclepro.2017.09.184.
- Teunter, R. H., Z. P. Bayindir, and W. van den Heuvel. 2006. “Dynamic Lot Sizing with Product Returns and Remanufacturing.” International Journal of Production Research 44 (20): 4377–4400. doi:10.1080/00207540600693564.
- Thierry, M., M. Salomon, J. Van Nunen, and L. Van Wassenhove. 1995. “Strategic Issues in Product Recovery Management.” California Management Review 37 (2): 114–136. doi:10.2307/41165792.
- Tiemessen, H. G. H., M. Fleischmann, and G. J. van Houtum. 2017. “Dynamic Control in Multi-item Production/Inventory Systems.” OR Spectrum 39: 165–191. doi:10.1007/s00291-016-0448-9.
- Tighazoui, A., S. Turki, C. Sauvey, and N. Sauer. 2019. “Optimal Design of a Manufacturing-remanufacturing-transport System within a Reverse Logistics Chain.” The International Journal of Advanced Manufacturing Technology 101: 1773–1791. doi:10.1007/s00170-018-2945-2.
- Ülkü, M. A., and J. Hsuan. 2017. “Towards Sustainable Consumption and Production: Competitive Pricing of Modular Products for Green Consumers.” Journal of Cleaner Production 142: 4230–4242. doi:10.1016/j.jclepro.2016.11.050.
- van der Laan, E., M. Salomon, R. Dekker, and L. Van Wassenhove. 1999. “Inventory Control in Hybrid Systems with Remanufacturing.” Management Science 45 (5): 733–747. doi:10.1287/mnsc.45.5.733.
- van Loon, P., and L. N. Van Wassenhove. 2018. “Assessing the Economic and Environmental Impact of Remanufacturing: A Decision Support Tool for OEM Suppliers.” International Journal of Production Research 56 (4): 1662–1674. doi:10.1080/00207543.2017.1367107.
- Van Mieghem, J. A. 2003. “Capacity Management, Investment, and Hedging: Review and Recent Developments.” Manufacturing & Service Operations Management 5 (4): 269–302. doi:10.1287/msom.5.4.269.24882.
- Van Mieghem, J. A., and N. Rudi. 2002. “Newsvendor Networks: Inventory Management and Capacity Investment with Discretionary Activities.” Manufacturing & Service Operations Management 4 (4): 313–335. doi:10.1287/msom.4.4.313.5728.
- Vercraene, S., and J. P. Gayon. 2013. “Optimal Control of a Production-inventory System with Productreturns.” International Journal of Production Economics 142: 302–310. doi:10.1016/j.ijpe.2012.11.012.
- Wang, Q., J. Li, H. Yan, and S. X. Zhu. 2014. “Optimal Remanufacturing Strategies in Name-Your-Own-Price Auctions with Limited Capacity.” International Journal of Production Economics 181: 113–129. doi:10.1016/j.ijpe.2016.01.008.
- Wang, W., Y. Wang, D. Mo, and M. M. Tseng. 2017. “Managing Component Reuse in Remanufacturing Under Product Diffusion Dynamics.” International Journal of Production Economics 183: 551–560. doi:10.1016/j.ijpe.2016.06.010.
- Wang, X., Y. Zhu, H. Sun, and F. Jia. 2018. “Production Decisions of New and Remanufactured Products: Implications for Low Carbon Emission Economy.” Journal of Cleaner Production 171: 1225–1243. doi:10.1016/j.jclepro.2017.10.053.
- Xerox. 2018. Corporate Social Responsibility Report.
- Zhou, L., M. M. Naim, O. Tang, and D. R. Towill. 2006. “Dynamic Performance of a Hybrid Inventory System with a Kanban Policy in Remanufacturing Process.” Omega 34: 585–598. doi:10.1016/j.omega.2005.01.007.
- Zhou, S. X., and Y. Yu. 2011. “Optimal Product Acquisition, Pricing, and Inventory Management for Systems with Remanufacturing.” Operations Research 59: 514–521. doi:10.1287/opre.1100.0898.