6,153
Views
12
CrossRef citations to date
0
Altmetric
Articles

Status of engineering change management in the engineer-to-order production environment: insights from a multiple case study

, , ORCID Icon, & ORCID Icon
Pages 4506-4528 | Received 15 Feb 2019, Accepted 17 Apr 2020, Published online: 12 May 2020

References

  • Baldwin, C. Y., and K. B. Clark. 1997. “Managing in an Age of Modularity.” Harvard Business Review 149: 84–93.
  • Barratt, M., T. Y. Choi, and M. C. Li. 2011. “Qualitative Case Studies in Operations Management: Trends, Research Outcomes, and Future Research Implications.” Journal of Operations Management 29 (4): 329–342.
  • Barzizza, R., M. Caridi, and R. Cigolini. 2001. “Engineering Change: A Theoretical Assessment and a Case Study.” Production Planning & Control 12 (7): 717–726.
  • Battaïa, O., A. Dolgui, S. S. Heragu, S. M. Meerkov, and M. K. Tiwari. 2018. “Design for Manufacturing and Assembly/Disassembly: Joint Design of Products and Production Systems.” International Journal of Production Research 56 (24): 7171–7189.
  • Boothroyd, G. 1994. “Product Design for Manufacture and Assembly.” Computer-Aided Design 26 (7): 505–520.
  • Braaksma, A. J. J., W. Klingenberg, and J. Veldman. 2013. “Failure Mode and Effect Analysis in Asset Maintenance: A Multiple Case Study in the Process Industry.” International Journal of Production Research 51 (4): 1055–1071.
  • Bryman, A., and E. Bell. 2003. Business Research Methods. Oxford: Oxford University Press.
  • Chen, C. S., Y. K. Tsui, R. J. Dzeng, and W. C. Wang. 2015. “Application of Project-Based Change Management in Construction: A Case Study.” Journal of Civil Engineering and Management 21 (1): 107–118.
  • Clarkson, P. J., C. Simons, and C. Eckert. 2004. “Predicting Change Propagation in Complex Design.” Journal of Mechanical Design 126 (5): 788–797.
  • da Cunha Barbosa, G. E., and G. F. M. de Souza. 2017. “A Risk-Based Framework with Design Structure Matrix to Select Alternatives of Product Modernisation.” Journal of Engineering Design 28 (1): 23–46.
  • Das, S., and A. Kanchanapiboon. 2011. “A Multi-Criteria Model for Evaluating Design for Manufacturability.” International Journal of Production Research 49 (4): 1197–1217.
  • Dekkers, R., C. M. Chang, and J. Kreutzfeldt. 2013. “The Interface Between “Product Design and Engineering” and Manufacturing: A Review of the Literature and Empirical Evidence.” International Journal of Production Economics 144 (1): 316–333.
  • Dieter, G. E. 2000. Engineering Design: A Materials and Processing Approach. New York: Hill Publishers.
  • Do, N. 2015. “Integration of Engineering Change Objects in Product Data Management Databases to Support Engineering Change Analysis.” Computers in Industry 73: 69–81.
  • Eckert, C., J. Clarkson, O. de Weck, and R. Keller. 2009. “Engineering Change: Drivers, Sources, and Approaches in Industry.” Paper presented at the Proceedings of ICED 09, the 17th International Conference on Engineering Design, Vol. 4, Product and Systems Design, Palo Alto, CA, USA.
  • Eger, T., C. Eckert, and P. J. Clarkson. 2005. “The Role of Design Freeze in Product Development.” Paper presented at the DS 35: Proceedings ICED 05, the 15th International Conference on Engineering Design, Melbourne, Australia.
  • Eisenhardt, K. M. 1989. “Building Theories From Case Study Research.” Academy of Management Review 14 (4): 532–550.
  • Ethiraj, S. K., and D. Levinthal. 2004. “Modularity and Innovation in Complex Systems.” Management Science 50 (2): 159–173.
  • Fricke, E., B. Gebhard, H. Negele, and E. Igenbergs. 2000. “Coping with Changes: Causes, Findings, and Strategies.” Systems Engineering 3 (4): 169–179.
  • Fricke, E., and A. P. Schulz. 2005. “Design for Changeability (Dfc): Principles to Enable Changes in Systems Throughout Their Entire Lifecycle.” Systems Engineering 8: 4.
  • Galizia, Francesco Gabriele, Hoda ElMaraghy, Marco Bortolini, and Cristina Mora. 2020. “Product Platforms Design, Selection and Customisation in High-Variety Manufacturing.” International Journal of Production Research 58 (3): 893–911.
  • Gann, D. M., and A. J. Salter. 2000. “Innovation in Project-Based, Service-Enhanced Firms: The Construction of Complex Products and Systems.” Research Policy 29 (7–8): 955–972.
  • Ghiyasinasab, Marzieh, Nadia Lehoux, Sylvain Ménard, and Caroline Cloutier. 2020. “Production Planning and Project Scheduling for Engineer-to-Order Systems-Case Study for Engineered Wood Production.” International Journal of Production Research 1–20. doi:10.1080/00207543.2020.1717009.
  • Gosling, Jonathan, Bill Hewlett, and Mohamed M Naim. 2017. “Extending Customer Order Penetration Concepts to Engineering Designs.” International Journal of Operations & Production Management 37 (4): 402–422.
  • Gosling, J., and M. M. Naim. 2009. “Engineer-to-Order Supply Chain Management: A Literature Review and Research Agenda.” International Journal of Production Economics 122 (2): 741–754.
  • Hamraz, B., N. Caldwell, and P. Clarkson. 2013. “A Holistic Categorization Framework for Literature on Engineering Change Management.” Systems Engineering 16 (4): 473–505.
  • Hamraz, B., N. Caldwell, T. Ridgman, and J. Clarkson. 2015. “Fbs Linkage Ontology and Technique to Support Engineering Change Management.” Research in Engineering Design 26 (1): 3–35.
  • Han, S., P. E. D. Love, and F. Pena-Mora. 2013. “A System Dynamics Model for Assessing the Impacts of Design Errors in Construction Projects.” Mathematical and Computer Modelling 57 (9-10): 2044–2053.
  • Hobday, M. 2000. “The Project-Based Organisation: An Ideal Form for Managing Complex Products and Systems?” Research Policy 29 (7-8): 871–893.
  • Huang, G. Q., and K. L. Mak. 1999. “Current Practices of Engineering Change Management in Uk Manufacturing Industries.” International Journal of Operations and Production Management 19 (1): 21–37.
  • Huang, G. Q., W. Y. Yee, and K. L. Mak. 2003. “Current Practice of Engineering Change Management in Hong Kong Manufacturing Industries.” Journal of Materials Processing Technology 139 (1): 481–487.
  • Iakymenko, N., A. Romsdal, M. Semini, and J. O. Strandhagen. 2018. “Engineering Change Management in the Engineer-to-Order Production Environment: Insights From Two Case Studies.” In IFIP International Conference on Advances in Production Management Systems, edited by Ilkyeong Moon, Gyu M. Lee, Jinwoo Park, Dimitris Kiritsis, and Gregor von Cieminski, 131–138. Cham: Springer.
  • Jarratt, T., J. Clarkson, and C. Eckert. 2005. Design Process Improvement. Design process improvement, 262–285. London: Springer.
  • Jarratt, T., C. Eckert, N. Caldwell, and P. Clarkson. 2011. “Engineering Change: An Overview and Perspective on the Literature.” Research in Engineering Design 22 (2): 103–124.
  • Johnsen, Sara Markworth, and Lars Hvam. 2019. “Understanding the Impact of Non-Standard Customisations in an Engineer-to-Order Context: A Case Study.” International Journal of Production Research 57 (21): 6780–6794.
  • Lau, A. K. W., R. C. M. Yam, and E. P. Y. Tang. 2010. “Supply Chain Integration and Product Modularity: An Empirical Study of Product Performance for Selected Hong Kong Manufacturing Industries.” International Journal of Operations & Production Management 30 (1): 20–56.
  • Matthews, B., and L. Ross. 2010. Research Methods: A Practical Guide for the Social Sciences. Harlow, England: Pearson Education Limited.
  • McGovern, T., C. Hicks, and C. F. Earl. 1999. “Modelling Supply Chain Management Processes in Engineer-to-Order Companies.” International Journal of Logistics: Research and Applications 2 (2): 147–159.
  • Miles, M. B., A. M. Huberman, and J. Saldana. 2014. Qualitative Data Analysis. A Methods Sourcebook. Thousand Oaks, California, USA: Sage Publications Inc.
  • Morris, A., M. Halpern, R. Setchi, and P. Prickett. 2016. “Assessing the Challenges of Managing Product Design Change Through-Life.” Journal of Engineering Design 27 (1-3): 25–49.
  • Muntslag, Dennis R. 1994. “Profit and Risk Evaluation in Customer Driven Engineering and Manufacturing.” International Journal of Production Economics 36 (1): 97–107.
  • Nadia, B., G. Gregory, and T. Vince. 2006. “Engineering Change Request Management in a New Product Development Process.” European Journal of Innovation Management 9 (1): 5–19.
  • Olhager, J. 2003. “Strategic Positioning of the Order Penetration Point.” International Journal of Production Economics 85 (3): 319–329.
  • Rauniar, R., W. Doll, G. Rawski, and P. Hong. 2008. “Shared Knowledge and Product Design Glitches in Integrated Product Development.” International Journal of Production Economics 114 (2): 723–736.
  • Reddi, K. R., and Y. B. Moon. 2013. “Modelling Engineering Change Management in a New Product Development Supply Chain.” International Journal of Production Research 51 (17): 5271–5291.
  • Reid, Iain, David Bamford, and Hossam Ismail. 2019. “Reconciling Engineer-to-Order Uncertainty by Supporting Front-End Decision-Making.” International Journal of Production Research 57 (21): 6856–6874.
  • Riley, D. R., B. E. Diller, and D. Kerr. 2005. “Effects of Delivery Systems on Change Order Size and Frequency in Mechanical Construction.” Journal of Construction Engineering and Management 131 (9): 953–962.
  • Ross, A. M., D. H. Rhodes, and D. E. Hastings. 2008. “Defining Changeability: Reconciling Flexibility, Adaptability, Scalability, Modifiability, and Robustness for Maintaining System Lifecycle Value.” Systems Engineering 11 (3): 246–262.
  • Rouibah, K., and K. R. Caskey. 2003. “Change Management in Concurrent Engineering From a Parameter Perspective.” Computers in Industry 50 (1): 15–34.
  • Sanchez, R. 1999. “Modular Architectures in the Marketing Process.” Journal of Marketing 63 (4 Suppl. 1): 92–111.
  • Semini, M., D. E. G. Haartveit, E. Alfnes, E. Arica, P. O. Brett, and J. O. Strandhagen. 2014. “Strategies for Customized Shipbuilding with Different Customer Order Decoupling Points.” Proceedings of the Institution of Mechanical Engineers, Part M: Journal of Engineering for the Maritime Environment 228 (4): 362–372.
  • Simpson, Timothy W, Jonathan R Maier, and Farrokh Mistree. 2001. “Product Platform Design: Method and Application.” Research in Engineering Design 13 (1): 2–22.
  • Sivanathan, A., J. M. Ritchie, and T. Lim. 2017. “A Novel Design Engineering Review System with Searchable Content: Knowledge Engineering Via Real-Time Multimodal Recording.” Journal of Engineering Design 28 (10–12): 681–708. doi:10.1080/09544828.2017.1393655.
  • Sjögren, P., B. Fagerström, M. Kurdve, and M. Callavik. 2018. “Managing Emergent Changes: Ad Hoc Teams’ Praxis and Practices.” International Journal of Managing Projects in Business 11 (4): 1086–1104.
  • Stevens, C. A., and K. Wright. 1991. “Managing Change with Configuration Management.” Global Business and Organizational Excellence 10 (4): 509–518.
  • Storbjerg, S. H., T. D. Brunoe, and K. Nielsen. 2016. “Towards an Engineering Change Management Maturity Grid.” Journal of Engineering Design 27 (4-6): 361–389.
  • Swink, M., S. Talluri, and T. Pandejpong. 2006. “Faster, Better, Cheaper: A Study of Npd Project Efficiency and Performance Tradeoffs.” Journal of Operations Management 24 (5): 542–562.
  • Tavčar, J., I. Demšar, and J. Duhovnik. 2018. “Engineering Change Management Maturity Assessment Model with Lean Criteria for Automotive Supply Chain.” Journal of Engineering Design 29 (4-5): 235–257.
  • Vickery, S. K., X. Koufteros, C. Dröge, and R. Calantone. 2016. “Product Modularity, Process Modularity, and New Product Introduction Performance: Does Complexity Matter?” Production and Operations Management 25 (4): 751–770.
  • Voss, C., N. Tsikriktsis, and M. Frohlich. 2002. “Case Research in Operations Management.” International Journal of Operations and Production Management 22 (2): 195–219.
  • Wang, H. S., and Z. H. Che. 2008. “A Multi-Phase Model for Product Part Change Problems.” International Journal of Production Research 46 (10): 2797–2825.
  • Wasmer, A., G. Staub, and R. W. Vroom. 2011. “An Industry Approach to Shared, Cross-Organisational Engineering Change Handling-the Road Towards Standards for Product Data Processing.” Computer-Aided Design 43 (5): 533–545.
  • Whyte, J., A. Stasis, and C. Lindkvist. 2016. “Managing Change in the Delivery of Complex Projects: Configuration Management, Asset Information and ‘Big Data’.” International Journal of Project Management 34 (2): 339–351. doi:10.1016/j.ijproman.2015.02.006.
  • Wickel, M., N. Chucholowski, F. Behncke, and U. Lindemann. 2015. “Comparison of Seven Company-Specific Engineering Change Processes.” In Modelling and Management of Engineering Processes, edited by M. Schabacker, K. Gericke, N. Szélig, and S. Vajna, 125–136. Berlin, Heidelberg: Springer.
  • Wikner, Joakim, and Martin Rudberg. 2005. “Integrating Production and Engineering Perspectives on the Customer Order Decoupling Point.” International Journal of Operations and Production Management 25 (7): 623–641.
  • Willner, O., D. Powell, M. Gerschberger, and P. Schönsleben. 2016. “Exploring the Archetypes of Engineer-to-Order: An Empirical Analysis.” International Journal of Operations and Production Management 36 (3): 242–264.
  • Wu, W. H., L. C. Fang, W. Y. Wang, M. C. Yu, and H. Y. Kao. 2014. “An Advanced Cmii-Based Engineering Change Management Framework: The Integration of Plm and Erp Perspectives.” International Journal of Production Research 52 (20): 6092–6109.
  • Wu, Zhiqiao, C. K. Kwong, C. K. M. Lee, and Jiafu Tang. 2016. “Joint Decision of Product Configuration and Remanufacturing for Product Family Design.” International Journal of Production Research 54 (15): 4689–4702.
  • Xie, S. Q., Y. L. Tu, R. Y. K. Fung, and Z. D. Zhou. 2003. “Rapid One-of-a-Kind Product Development Via the Internet: A Literature Review of the State-of-the-Art and a Proposed Platform.” International Journal of Production Research 41 (18): 4257–4298.
  • Yang, Li-Ren. 2013. “Key Practices, Manufacturing Capability and Attainment of Manufacturing Goals: The Perspective of Project/Engineer-to-Order Manufacturing.” International Journal of Project Management 31 (1): 109–125.
  • Yin, R. K. 2014. Case Study Research: Design and Methods. Thousand Oaks, Calofornia, USA: Sage Publications.
  • Zennaro, I., S. Finco, D. Battini, and A. Persona. 2019. “Big Size Highly Customised Product Manufacturing Systems: A Literature Review and Future Research Agenda.” International Journal of Production Research 57 (15-16): 1–24.
  • Zheng, P., C. H. Chen, and S. Shang. 2019. “Towards an Automatic Engineering Change Management in Smart Product-Service Systems – a Dsm-Based Learning Approach.” Advanced Engineering Informatics 39: 203–213. doi:10.1016/j.aei.2019.01.002.
  • Zorzini, M, L Hendry, M Stevenson, and A Pozzetti. 2008. “Customer enquiry management and product customization: An empirical multi-case study analysis in the Italian capital goods sector.” International Journal of Operations and Production Management 28 (12): 1186–1218.