843
Views
7
CrossRef citations to date
0
Altmetric
Research Articles

A mixed-model assembly line sequencing problem with parallel stations and walking workers: a case study in the automotive industry

ORCID Icon, ORCID Icon, ORCID Icon, ORCID Icon & ORCID Icon
Pages 993-1012 | Received 22 Apr 2021, Accepted 20 Dec 2021, Published online: 16 Jan 2022

References

  • Al-Zuheri, A., L. Luong, and K. Xing. 2013. “Impact of Walking Worker Assembly Line Configuration on Ergonomics Performance.” Australian Journal of Multi-Disciplinary Engineering 9 (2): 165–175.
  • Baena, F., A. Guarin, J. Mora, J. Sauza, and S. Retat. 2017. “Learning Factory: The Path to Industry 4.0.” Procedia Manufacturing 9: 73–80.
  • Becker, C., and A. Scholl. 2006. “A Survey on Problems and Methods in Generalized Assembly Line Balancing.” European Journal of Operational Research 168 (3): 694–715.
  • Boenzi, F., S. Digiesi, F. Facchini, and G. Mummolo. 2016. “Ergonomic Improvement Through job Rotations in Repetitive Manual Tasks in Case of Limited Specialization and Differentiated Ergonomic Requirements.” IFAC-PapersOnLine 49 (12): 1667–1672.
  • Boysen, N., and S. Bock. 2011. “Scheduling Just-in-Time Part Supply for Mixed-Model Assembly Lines.” European Journal of Operational Research 211 (1): 15–25.
  • Boysen, N., M. Fliedner, and A. Scholl. 2009. “Sequencing Mixed-Model Assembly Lines: Survey, Classification and Model Critique.” European Journal of Operational Research 192 (2): 349–373.
  • Boysen, N., A. Scholl, and N. Wopperer. 2012. “Resequencing of Mixed-Model Assembly Lines: Survey and Research Agenda.” European Journal of Operational Research 216 (3): 594–604.
  • Calzavara, M., M. Faccio, A. Persona, and I. Zennaro. 2021. “Walking Worker vs Fixed Worker Assembly Considering the Impact of Components Exposure on Assembly Time and Energy Expenditure.” International Journal of Advanced Manufacturing Technology 112 (9–10): 2971–2988.
  • Cunbo, Z., J. Liu, and H. Xiong. 2018. “Digital Twin-Based Smart Production Management and Control Framework for the Complex Product Assembly Shop-Floor.” The International Journal of Advanced Manufacturing Technology 96 (1–4): 1149–1163.
  • Deepak, A., R. Srivatsan, and V. Samsingh. 2017. “A Case Study on Implementation of Walking Worker Assembly Line to Improve Productivity and Utilisation of Resources in a Heavy Duty Manufacturing Industry.” FME Transactions 45 (4): 496–502.
  • Defersha, F. M., and F. Mohebalizadehgashti. 2018. “Simultaneous Balancing, Sequencing, and Workstation Planning for a Mixed Model Manual Assembly Line Using Hybrid Genetic Algorithm.” Computers & Industrial Engineering 119: 370–387.
  • Eaton, J., S. Yang, and M. Gongora. 2017. “Ant Colony Optimization for Simulated Dynamic Multi-Objective Railway Junction Rescheduling.” IEEE Transactions on Intelligent Transportation Systems 18 (11): 2980–2992.
  • Ebrahimi, M., A. Baboli, and E. Rother. 2018. “A Roadmap for Evolution of Existing Production System Toward the Factory of the Future: A Case Study in Automotive Industry.” 2018 IEEE International Conference on Technology Management, Operations and Decisions (ICTMOD).
  • Fathi, M., V. Rodríguez, D. B. Fontes, and M. J. Alvarez. 2016. “A Modified Particle Swarm Optimisation Algorithm to Solve the Part Feeding Problem at Assembly Lines.” International Journal of Production Research 54 (3): 878–893.
  • Fattahi, P., N. B. Rad, F. Daneshamooz, and S. Ahmadi. 2020. “A new Hybrid Particle Swarm Optimization and Parallel Variable Neighborhood Search Algorithm for Flexible Job Shop Scheduling with Assembly Process.” Assembly Automation 40 (3): 419–432.
  • Fattahi, P., N. B. Tavakoli, M. Fathollah, A. Roshani, and M. Salehi. 2012. “Sequencing Mixed-Model Assembly Lines by Considering Feeding Lines.” The International Journal of Advanced Manufacturing Technology 61 (5): 677–690.
  • Franz, C., A. Koberstein, and L. Suhl. 2015. “Dynamic Resequencing at Mixed-Model Assembly Lines.” International Journal of Production Research 53 (11): 3433–3447.
  • Gilchrist, A. 2016. Industry 4.0: The Industrial Internet of Things. Berkeley, CA: Springer.
  • Gunay, E. E., and U. Kula. 2017. “A Stochastic Programming Model for Resequencing Buffer Content Optimisation in Mixed-Model Assembly Lines.” International Journal of Production Research 55 (10): 2897–2912.
  • Hansen, P., N. Mladenović, R. Todosijević, and S. Hanafi. 2017. “Variable Neighborhood Search: Basics and Variants.” EURO Journal on Computational Optimization 5 (3): 423–454.
  • Huang, G. Q., Y. F. Zhang, and P. Y. Jiang. 2007. “RFID-based Wireless Manufacturing for Walking-Worker Assembly Islands with Fixed-Position Layouts.” Robotics and Computer-Integrated Manufacturing 23 (4): 469–477.
  • Jamrus, T., H.-K. Wang, and C.-F. Chien. 2020. “Dynamic Coordinated Scheduling for Supply Chain Under Uncertain Production Time to Empower Smart Production for Industry 3.5.” Computers & Industrial Engineering 142: 106375.
  • Kritzinger, W., M. Karner, G. Traar, J. Henjes, and W. Sihn. 2018. “Digital Twin in Manufacturing: A Categorical Literature Review and Classification.” IFAC-PapersOnLine 51 (11): 1016–1022.
  • Liao, Y., F. Deschamps, E. d, F. R. Loures, and L. F. P. Ramos. 2017. “Past, Present and Future of Industry 4.0 – a Systematic Literature Review and Research Agenda Proposal.” International Journal of Production Research 55 (12): 3609–3629.
  • Mahmoodjanloo, M., R. Tavakkoli-Moghaddam, A. Baboli, and A. Bozorgi-Amiri. 2020. “Flexible Job Shop Scheduling Problem with Reconfigurable Machine Tools: An Improved Differential Evolution Algorithm.” Applied Soft Computing 94: 106416.
  • Mahmoodjanloo, M., R. Tavakkoli-Moghaddama, A. Baboli, and A. Bozorgi-Amiri. 2021. “Distributed Job-Shop Rescheduling Problem Considering Reconfigurability of Machines: A Self-Adaptive Hybrid Equilibrium Optimiser.” International Journal of Production Research, 1–22. DOI:10.1080/00207543.2021.1946193
  • Mjirda, A., R. Todosijević, S. Hanafi, P. Hansen, and N. Mladenović. 2017. “Sequential Variable Neighborhood Descent Variants: An Empirical Study on the Traveling Salesman Problem.” International Transactions in Operational Research 24 (3): 615–633.
  • Mladenović, N., and P. Hansen. 1997. “Variable Neighborhood Search.” Computers & Operations Research 24 (11): 1097–1100.
  • Moetz, A., P. Stylos-Duesmann, and B. Otto. 2019. “Schedule Instability in Automotive Production Networks: The Development of a Network-Oriented Resequencing Method.” IFAC-PapersOnLine 52 (13): 2810–2815.
  • Mohseni-Darabi, S., M. Mahmoodjanloo, and A. Baboli. 2021. “Sequencing Problem in a Paced Mixed-Model Assembly Line with Multiple Flexible Operators.” 2021 IEEE 8th International Conference on Industrial Engineering and Applications (ICIEA), IEEE.
  • Naderi, B., M. Zandieh, A. K. G. Balagh, and V. Roshanaei. 2009. “An Improved Simulated Annealing for Hybrid Flowshops with Sequence-Dependent Setup and Transportation Times to Minimize Total Completion Time and Total Tardiness.” Expert Systems with Applications 36 (6): 9625–9633.
  • Peruzzini, M., F. Grandi, and M. Pellicciari. 2017. “Benchmarking of Tools for User Experience Analysis in Industry 4.0.” Procedia Manufacturing 11: 806–813.
  • Rossit, D. A., F. Tohmé, and M. Frutos. 2019. “Industry 4.0: Smart Scheduling.” International Journal of Production Research 57 (12): 3802–3813.
  • Tsai, L.-H. 1995. “Mixed-model Sequencing to Minimize Utility Work and the Risk of Conveyor Stoppage.” Management Science 41 (3): 485–495.
  • Wang, Q., G. W. Owen, and A. R. Mileham. 2005. “Comparison Between Fixed-and Walking-Worker Assembly Lines.” Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 219 (11): 845–848.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.