528
Views
1
CrossRef citations to date
0
Altmetric
Research Article

Global risk assessment for development processes: from framework to simulation

ORCID Icon, ORCID Icon & ORCID Icon
Pages 7214-7238 | Received 04 May 2021, Accepted 17 Dec 2021, Published online: 14 Feb 2022

References

  • Abdo, H., and J.-M. Flaus. 2016. “Uncertainty Quantification in Dynamic System Risk Assessment: A New Approach with Randomness and Fuzzy Theory.” International Journal of Production Research 54 (19): 5862–5885. doi:10.1080/00207543.2016.1184348.
  • Alawamleh, M., and K. Popplewell. 2011. “Interpretive Structural Modelling of Risk Sources in a Virtual Organisation.” International Journal of Production Research 49 (20): 6041–6063.
  • Axelrod, R. 1976. Structure of Decision: The Cognitive Maps of Political Elites. Princeton, NJ: Princeton University Press.
  • Barbati, M., G. Bruno, and A. Genovese. 2012. “Applications of Agent-Based Models for Optimization Problems: A Literature Review.” Expert Systems with Applications 39 (5): 6020–6028. doi:10.1016/j.eswa.2011.12.015.
  • Bassetto, S., A. Siadat, and M. Tollenaere. 2011. “The Management of Process Control Deployment Using Interactions in Risks Analyses.” Journal of Loss Prevention in the Process Industries 24 (4): 458–465. doi:10.1016/j.jlp.2011.04.004.
  • Bedford, T., and R. M. Cooke. 2001. Probabilistic Risk Analysis: Foundations and Methods. New York: Cambridge University Press.
  • Belhe, U., and A. Kusiak. 1996. “Modeling Relationships Among Design Activities.” Journal of Mechanical Design 118 (4): 454–460. doi:10.1115/1.2826912.
  • Ben Said, A., M. K. Shahzad, E. Zamai, S. Hubac, and M. Tollenaere. 2016. “Experts’ Knowledge Renewal and Maintenance Actions Effectiveness in High-Mix Low-Volume Industries, Using Bayesian Approach.” Cognition, Technology & Work 18 (1): 193–213. doi:10.1007/s10111-015-0354-y.
  • Black, G. W., K. N. McKay, and S. E. Varghese. 2008. “‘Anticipatory Batch Insertion’ to Mitigate Perceived Processing Risk.” International Journal of Production Research 46 (4): 853–871. doi:10.1080/00207540600932053.
  • Bosch-Mauchand, M., A. Siadat, N. Perry, and A. Bernard. 2012. “VCS: Value Chains Simulator, a Tool for Value Analysis of Manufacturing Enterprise Processes (a Value-Based Decision Support Tool).” Journal of Intelligent Manufacturing 23 (4): 1389–1402. doi:10.1007/s10845-010-0452-x.
  • Browning, T. R., J. J. Deyst, S. D. Eppinger, and D. E. Whitney. 2002. “Adding Value in Product Development by Creating Information and Reducing Risk.” IEEE Transactions on Engineering Management 49 (4): 443–458. doi:10.1109/TEM.2002.806710.
  • Browning, T. R., and S. D. Eppinger. 2002. “Modeling Impacts of Process Architecture on Cost and Schedule Risk in Product Development.” IEEE Transactions on Engineering Management 49 (4): 428–442. doi:10.1109/TEM.2002.806709.
  • Bruch, J., and M. Bellgran. 2013. “Characteristics Affecting Management of Design Information in the Production System Design Process.” International Journal of Production Research 51 (11): 3241–3251. doi:10.1080/00207543.2012.755273.
  • Cabanes, B., S. Hubac, P. Le Masson, and B. Weil. 2021. “Improving Reliability Engineering in Product Development Based on Design Theory: The Case of FMEA in the Semiconductor Industry.” Research in Engineering Design, 1–21. doi:10.1007/s00163-021-00360-1.
  • Carvalho, J. P. 2013. “On the Semantics and the Use of Fuzzy Cognitive Maps and Dynamic Cognitive Maps in Social Sciences.” Fuzzy Sets and Systems 214: 6–19. doi:10.1016/j.fss.2011.12.009.
  • Carvalho, M. M. D., and R. Rabechini Junior. 2015. “Impact of Risk Management on Project Performance: The Importance of Soft Skills.” International Journal of Production Research 53 (2): 321–340. doi:10.1080/00207543.2014.919423.
  • Cheng, C.-Y., S.-F. Li, S.-J. Chu, C.-Y. Yeh, and R. J. Simmons. 2013. “Application of Fault Tree Analysis to Assess Inventory Risk: A Practical Case from Aerospace Manufacturing.” International Journal of Production Research 51 (21): 6499–6514. doi:10.1080/00207543.2013.825744.
  • Chiarini, A. 2017. “Risk-Based Thinking According to ISO 9001:2015 Standard and the Risk Sources European Manufacturing SMEs Intend to Manage.” The TQM Journal 29 (2): 310–323. doi:10.1108/TQM-04-2016-0038.
  • Clark, N. 2006. The Airbus Saga: Crossed Wires and a Multibillion-Euro Delay – Business – International Herald Tribune. The New York Times. https://www.nytimes.com/2006/12/11/business/worldbusiness/11iht-airbus.3860198.html.
  • Cooper, L. P. 2003. “A Research Agenda to Reduce Risk in New Product Development Through Knowledge Management: A Practitioner Perspective.” Journal of Engineering and Technology Management 20 (1–2): 117–140. doi:10.1016/S0923-4748(03)00007-9.
  • da Cunha Barbosa, G. E., and G. F. M. de Souza. 2017. “A Risk-Based Framework with Design Structure Matrix to Select Alternatives of Product Modernisation.” Journal of Engineering Design 28 (1): 23–46. doi:10.1080/09544828.2016.1258458.
  • Danilovic, M., and T. R. Browning. 2007. “Managing Complex Product Development Projects with Design Structure Matrices and Domain Mapping Matrices.” International Journal of Project Management 25 (3): 300–314. doi:10.1016/j.ijproman.2006.11.003.
  • Dezfuli, H., A. Benjamin, C. Everett, G. Maggio, M. Stamatelatos, R. Youngblood, … R. Williams. 2011. NASA Risk Management Handbook. Version 1.0.
  • Dickerson, J. A., and B. Kosko. 1998. “Virtual Worlds as Fuzzy Dynamical System.” In Technology for Multimedia, edited by B. Sheu and M. Ismail, 567–603. New York: IEEE Press.
  • Egilmez, G., and G. Süer. 2014. “The Impact of Risk on the Integrated Cellular Design and Control.” International Journal of Production Research 52 (5): 1455–1478. doi:10.1080/00207543.2013.844375.
  • Engelhardt, R. A., T. Eifler, J. Mathias, H. Kloberdanz, H. Birkhofer, and A. Bohn. 2011. “Linkage of Methods Within the UMEA Methodology – An Approach to Analyse Uncertainties in the Product Development Process.” In DS 68-10: Proceedings of the 18th International Conference on Engineering Design (ICED 11), Impacting Society through Engineering Design, Vol. 10: Design Methods and Tools pt. 2, Lyngby/Copenhagen, Denmark, 433–442.
  • Fang, C., and F. Marle. 2012. “A Simulation-Based Risk Network Model for Decision Support in Project Risk Management.” Decision Support Systems 52 (3): 635–644. doi:10.1016/j.dss.2011.10.021.
  • Farid, M., and W. P. Neumann. 2020. “Modelling the Effects of Employee Injury Risks on Injury, Productivity and Production Quality Using System Dynamics.” International Journal of Production Research 58 (20): 6115–6129. doi:10.1080/00207543.2019.1667040.
  • Finkel, A. 1990. Confronting Uncertainty in Risk Management. A Guide for Decision-Makers. Washington, DC: Center for Risk Management. Resources for the Future.
  • Franceschini, F., and M. Galetto. 2001. “A New Approach for Evaluation of Risk Priorities of Failure Modes in FMEA.” International Journal of Production Research 39 (13): 2991–3002. doi:10.1080/00207540110056162.
  • Gorecki, S., J. Ribault, G. Zacharewicz, Y. Ducq, and N. Perry. 2019. “Risk Management and Distributed Simulation in Papyrus Tool for Decision Making in Industrial Context.” Computers & Industrial Engineering 137: 106039. doi:10.1016/j.cie.2019.106039.
  • Goswami, M., and M. K. Tiwari. 2014. “A Predictive Risk Evaluation Framework for Modular Product Concept Selection in new Product Design Environment.” Journal of Engineering Design 25 (1–3): 150–171. doi:10.1080/09544828.2014.921806.
  • Haskins, C. 2006. Systems Engineering Handbook: A Guide for System Life Cycle Processes and Activities. Hoboken, NJ: INCOSE.
  • Helbing, D. 2010. “Systemic Risks in Society and Economics.” IRGC–The Emergence of Risks: Contributing Factors, 1–25.
  • Helbing, D. 2013. “Globally Networked Risks and How to Respond.” Nature 497 (7447): 51–59. doi:10.1038/nature12047.
  • ISO 31000: Risk management – Principles and guidelines. 2009.
  • ISO 31010: Risk management – Risk assessment techniques. 2019.
  • Jamshidi, A., D. Ait-kadi, A. Ruiz, and M. L. Rebaiaia. 2018. “Dynamic Risk Assessment of Complex Systems Using FCM.” International Journal of Production Research 56 (3): 1070–1088. doi:10.1080/00207543.2017.1370148.
  • Jetter, A. J., and K. Kok. 2014. “Fuzzy Cognitive Maps for Futures Studies – A Methodological Assessment of Concepts and Methods.” Futures 61: 45–57. doi:10.1016/j.futures.2014.05.002.
  • Kasperson, R. E., O. Renn, P. Slovic, H. S. Brown, J. Emel, R. Goble, and S. Ratick. 1988. “The Social Amplification of Risk: A Conceptual Framework.” Risk Analysis 8 (2): 177–187. doi:10.1111/j.1539-6924.1988.tb01168.x.
  • Kayis, B., G. Arndt, M. Zhou, S. Savci, Y. B. Khoo, and A. Rispler. 2006. “Risk Quantification for New Product Design and Development in a Concurrent Engineering Environment.” CIRP Annals 55 (1): 147–150. doi:10.1016/S0007-8506(07)60386-2.
  • Kendrick, T. 2003. Identifying and Managing Project Risk: Essential Tools for Failure-Proofing Your Project. New York: AMACOM.
  • Kimiagari, S., and S. Keivanpour. 2019. “An Interactive Risk Visualisation Tool for Large-Scale and Complex Engineering and Construction Projects Under Uncertainty and Interdependence.” International Journal of Production Research 57 (21): 6827–6855. doi:10.1080/00207543.2018.1503426.
  • Klir, G. J., and T. A. Folger. 1988. Fuzzy Sets: Uncertainty and Information. Englewood Cliffs: Prentice Hall.
  • Kosko, B. 1986. “Fuzzy Cognitive Maps.” International Journal of Man-Machine Studies 24 (1): 65–75.
  • Kovalev, S., I. Chalamon, and S. E. Collignon. 2021. “Minimizing Maximum Job Dependent Ergonomic Risk.” International Journal of Production Research 59 (1): 95–101. doi:10.1080/00207543.2019.1694720.
  • Krishnan, K. K., I. Jithavech, and H. Liao. 2009. “Mitigation of Risk in Facility Layout Design for Single and Multi-Period Problems.” International Journal of Production Research 47 (21): 5911–5940. doi:10.1080/00207540802175337.
  • Kumar Dadsena, K., S. P. Sarmah, and V. N. A. Naikan. 2019. “Risk Evaluation and Mitigation of Sustainable Road Freight Transport Operation: A Case of Trucking Industry.” International Journal of Production Research 57 (19): 6223–6245. doi:10.1080/00207543.2019.1578429.
  • Kunreuther, H., and P. Slovic. 1996. “Science, Values, and Risk.” The Annals of the American Academy of Political and Social Science 545 (1): 116–125. doi:10.1177/0002716296545001012.
  • Kurtoglu, T., and I. Y. Tumer. 2008. “A Graph-Based Fault Identification and Propagation Framework for Functional Design of Complex Systems.” Journal of Mechanical Design 130 (5): 051401. doi:10.1115/1.2885181.
  • Lalonde, C., and O. Boiral. 2012. “Managing Risks Through ISO 31000: A Critical Analysis.” Risk Management 14 (4): 272–300. doi:10.1057/rm.2012.9.
  • Larson, N., and A. Kusiak. 1996. “Managing Design Processes: A Risk Assessment Approach. IEEE Transactions on Systems.” Man, and Cybernetics – Part A: Systems and Humans 26 (6): 749. doi:10.1109/3468.541335.
  • Lazov, I. 2019. “Risk-Based Analysis of Manufacturing Systems.” International Journal of Production Research 57 (22): 7089–7103. doi:10.1080/00207543.2019.1577564.
  • Lazzerini, B., and L. Mkrtchyan. 2011. “Analyzing Risk Impact Factors Using Extended Fuzzy Cognitive Maps.” IEEE Systems Journal 5 (2): 288–297. doi:10.1109/JSYST.2011.2134730.
  • Lee, C. K. M., Y. Lv, and Z. Hong. 2013. “Risk Modelling and Assessment for Distributed Manufacturing System.” International Journal of Production Research 51 (9): 2652–2666. doi:10.1080/00207543.2012.738943.
  • Lough, K. G., R. Stone, and I. Y. Tumer. 2009. “The Risk in Early Design Method.” Journal of Engineering Design 20 (2): 155–173. doi:10.1080/09544820701684271.
  • Marle, F., L.-A. Vidal, and J.-C. Bocquet. 2013. “Interactions-Based Risk Clustering Methodologies and Algorithms for Complex Project Management.” International Journal of Production Economics 142 (2): 225–234. doi:10.1016/j.ijpe.2010.11.022.
  • Marmier, F., I. Filipas Deniaud, and D. Gourc. 2014. “Strategic Decision-Making in NPD Projects According to Risk: Application to Satellites Design Projects.” Computers in Industry 65 (8): 1107. doi:10.1016/j.compind.2014.06.001.
  • Mauborgne, P., S. Deniaud, E. Levrat, E. Bonjour, J.-P. Micaëlli, and D. Loise. 2016. “Operational and System Hazard Analysis in a Safe Systems Requirement Engineering Process – Application to Automotive Industry.” Safety Science 87: 256–268. doi:10.1016/j.ssci.2016.04.011.
  • Mehrjoo, M., and Z. J. Pasek. 2016. “Risk Assessment for the Supply Chain of Fast Fashion Apparel Industry: A System Dynamics Framework.” International Journal of Production Research 54 (1): 28–48.
  • Mizgier, K. J. 2017. “Global Sensitivity Analysis and Aggregation of Risk in Multi-Product Supply Chain Networks.” International Journal of Production Research 55 (1): 130–144. doi:10.1080/00207543.2016.1198504.
  • Morgan, M. G., M. Henrion, and M. Small. 1990. Uncertainty: A Guide to Dealing with Uncertainty in Quantitative Risk and Policy Analysis. New York: Cambridge University Press.
  • Morse, E., J.-Y. Dantan, N. Anwer, R. Söderberg, G. Moroni, A. Qureshi, X. Jiang, and L. Mathieu. 2018. “Tolerancing: Managing Uncertainty from Conceptual Design to Final Product.” CIRP Annals 67 (2): 695–717. doi:10.1016/j.cirp.2018.05.009.
  • Oberkampf, W., S. DeLand, B. Rutherford, K. Diegert, and K. Alvin. 1999. “A New Methodology for the Estimation of Total Uncertainty in Computational Simulation.” In 40th Structures, Structural Dynamics, and Materials Conference and Exhibit. American Institute of Aeronautics and Astronautics. doi:10.2514/6.1999-1612.
  • Oliva, G. M., P. Weber, E. Levrat, and B. Iung. 2010. “Use of Probabilistic Relational Model (PRM) for Dependability Analysis of Complex Systems.” IFAC Proceedings 43 (8): 501–506. doi:10.3182/20100712-3-FR-2020.00082.
  • Otto, K. N., and E. K. Antonsson. 1993. “Tuning Parameters in Engineering Design.” Journal of Mechanical Design 115 (1): 14–19. doi:10.1115/1.2919311.
  • Papageorgiou, E. I. 2012. “Learning Algorithms for Fuzzy Cognitive Maps – A Review Study.” IEEE Transactions on Systems, Man, and Cybernetics Part C (Applications and Reviews) 42 (2): 150–163. doi:10.1109/TSMCC.2011.2138694.
  • Perlman, Y. 2013. “The Effect of Risk Aversion on Product Family Design Under Uncertain Consumer Segments.” International Journal of Production Research 51 (2): 504–514. doi:10.1080/00207543.2011.653013.
  • Project Management Institute. 2013. A Guide to the Project Management Body of Knowledge (PMBOK Guide). Newtown Square, PA: Project Management Institute.
  • Rathore, R., J. J. Thakkar, and J. K. Jha. 2021. “Impact of Risks in Foodgrains Transportation System: A System Dynamics Approach.” International Journal of Production Research 59 (6): 1814–1833. doi:10.1080/00207543.2020.1725683.
  • Renn, O. 1998. “The Role of Risk Perception for Risk Management.” Reliability Engineering & System Safety 59 (1): 49–62. doi:10.1016/S0951-8320(97)00119-1.
  • Rezaee, Jahangoshai, M. Yousefi, S. Valipour, M. & Dehdar, M. M. 2018. “Risk Analysis of Sequential Processes in Food Industry Integrating Multi-Stage Fuzzy Cognitive Map and Process Failure Mode and Effects Analysis.” Computers & Industrial Engineering 123: 325–337. doi:10.1016/j.cie.2018.07.012.
  • Risk, DoD. 2017. Issue, and Opportunity Management Guide for Defense Acquisition Programs. Washington, DC: Office of the Deputy Assistant Secretary of Defense for Systems Engineering.
  • Savci, S., and B. Kayis. 2006. “Knowledge Elicitation for Risk Mapping in Concurrent Engineering Projects.” International Journal of Production Research 44 (9): 1739–1755. doi:10.1080/00207540500445321.
  • Scheibe, K. P., and J. Blackhurst. 2018. “Supply Chain Disruption Propagation: A Systemic Risk and Normal Accident Theory Perspective.” International Journal of Production Research 56 (1–2): 43–59. doi:10.1080/00207543.2017.1355123.
  • Schindel, W. D. 2010. “Failure Analysis: Insights from Model-Based Systems Engineering.” INCOSE International Symposium 20 (1): 1227–1239. doi:10.1002/j.2334-5837.2010.tb01136.x.
  • Shah, L. A., A. Etienne, A. Siadat, and F. Vernadat. 2016. “Decision-Making in the Manufacturing Environment Using a Value-Risk Graph.” Journal of Intelligent Manufacturing 27 (3): 617–630. doi:10.1007/s10845-014-0895-6.
  • Shah, L. A., A. Etienne, A. Siadat, and F. Vernadat. 2017. “Process-Oriented Risk Assessment Methodology for Manufacturing Process Evaluation.” International Journal of Production Research 55 (15): 4516–4529. doi:10.1080/00207543.2016.1268728.
  • Shina, S. G. 1991. “Concurrent Engineering: New Rules for World-Class Companies.” IEEE Spectrum 28 (7): 22–26. doi:10.1109/6.83462.
  • Silvestri, A., F. De Felice, and A. Petrillo. 2012. “Multi-Criteria Risk Analysis to Improve Safety in Manufacturing Systems.” International Journal of Production Research 50 (17): 4806–4821. doi:10.1080/00207543.2012.657968.
  • Slovic, P. 2001. “The Risk Game.” Journal of Hazardous Materials 86 (1-3): 17–24. doi:10.1016/S0304-3894(01)00248-5.
  • Sun, Tzu. 2004. The Art of War. Translated by Lionel Giles, Project Gutenberg. http://www.gutenberg.org/.
  • Tabuchi, H. 2016. As Takata Costs Soar in Airbag Recall, Files Show Early Worries on Financial Toll. The New York Times. April 13.
  • Thunnissen, D. P. 2003. “Uncertainty Classification for the Design and Development of Complex Systems.” In 3rd Annual Predictive Methods Conference, 1–16. CA: Newport Beach.
  • Truong Quang, H., and Y. Hara. 2018. “Risks and Performance in Supply Chain: The Push Effect.” International Journal of Production Research 56 (4): 1369–1388. doi:10.1080/00207543.2017.1363429.
  • Turner, J. R, ed. 2007. Gower Handbook of Project Management. Aldershot, UK: Gower Publishing Limited.
  • Ullman, D. G. 2010. The Mechanical Design Process. New York: McGraw-Hill Higher Education.
  • Ulrich, K., and Eppinger S. 2011. Product Design and Development. New York: McGraw-Hill Higher Education.
  • Vernadat, F., L. Shah, A. Etienne, and A. Siadat. 2013. “VR-PMS: A New Approach for Performance Measurement and Management of Industrial Systems.” International Journal of Production Research 51 (23–24): 7420–7438. doi:10.1080/00207543.2012.752593.
  • Walter, M., M. Storch, and S. Wartzack. 2014. “On Uncertainties in Simulations in Engineering Design: A Statistical Tolerance Analysis Application.” Simulation 90 (5): 547–559. doi:10.1177/0037549714529834.
  • Wang, Y.-M. 2012. “A Fuzzy-Normalisation-Based Group Decision-Making Approach for Prioritising Engineering Design Requirements in QFD Under Uncertainty.” International Journal of Production Research 50 (23): 6963–6977. doi:10.1080/00207543.2011.639398.
  • Ward, S., and C. Chapman. 2003. “Transforming Project Risk Management into Project Uncertainty Management.” International Journal of Project Management 21 (2): 97–105. doi:10.1016/S0263-7863(01)00080-1.
  • Williams, T. M. 1994. “Managing Risk in Development and Initial Production.” International Journal of Production Research 32 (7): 1591–1597. doi:10.1080/00207549408957024.
  • Wu, Q., D. Gouyon, P. Hubert, and É Levrat. 2017. “Towards Model-Based Systems Engineering (MBSE) Patterns to Efficiently Reuse Know-How.” Insight 20 (4): 31–33. doi:10.1002/inst.12178.
  • Yan, H.-B., T. Ma, and Y. Li. 2013. “A Novel Fuzzy Linguistic Model for Prioritising Engineering Design Requirements in Quality Function Deployment Under Uncertainties.” International Journal of Production Research 51 (21): 6336–6355. doi:10.1080/00207543.2013.796423.
  • Yeh, T.-M., and L.-Y. Chen. 2014. “Fuzzy-Based Risk Priority Number in FMEA for Semiconductor Wafer Processes.” International Journal of Production Research 52 (2): 539–549. doi:10.1080/00207543.2013.837984.
  • Yu, G., A. Liu, and H. Sun. 2020. “Risk-Averse Flexible Policy on Ambulance Allocation in Humanitarian Operations Under Uncertainty.” International Journal of Production Research, 1–23. doi:10.1080/00207543.2020.1735663.
  • Zheng, H., W. Liu, and C. Xiao. 2018. “An Activity-Based Defect Management Framework for Product Development.” Computers & Industrial Engineering 118: 202–209. doi:10.1016/j.cie.2018.02.027.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.