Tools and practices for tactical delivery date setting in engineer-to-order environments: a systematic literature review

ORCID Icon, ORCID Icon & ORCID Icon
Pages 2339-2371 | Received 14 Dec 2021, Accepted 12 Mar 2022, Published online: 05 Apr 2022

References

  • Adam, N. R., J. W. M. Bertrand, D. C. Morehead, and J. Surkis. 1993. “Due Date Assignment Procedures with Dynamically Updated Coefficients for Multi-Level Assembly job Shops.” European Journal of Operational Research 68 (2): 212–27.
  • Adrodegari, F., A. Bacchetti, R. Pinto, F. Pirola, and M. Zanardini. 2015. “Engineer-to-order (ETO) Production Planning and Control: An Empirical Framework for Machinery-Building Companies.” Production Planning and Control 26 (11): 910–32. doi:10.1080/09537287.2014.1001808.
  • Alenezi, A., S. A. Moses, and T. B. Trafalis. 2008. “Real-time Prediction of Order Flowtimes Using Support Vector Regression.” Computers and Operations Research 35 (11): 3489–503. doi:10.1016/j.cor.2007.01.026.
  • Alfieri, Arianna, Tullio Tolio, and Marcello Urgo. 2011. “A Project Scheduling Approach to Production Planning with Feeding Precedence Relations.” International Journal of Production Research 49 (4): 995–1020.
  • Alfieri, Arianna, Tullio Tolio, and Marcello Urgo. 2012. “A two-Stage Stochastic Programming Project Scheduling Approach to Production Planning.” International Journal of Advanced Manufacturing Technology 62 (1): 279–90.
  • Alfnes, Erlend, Jonathan Gosling, Mohamed Naim, and Heidi C. Dreyer. 2021. “Exploring Systemic Factors Creating Uncertainty in Complex Engineer-to-Order Supply Chains: Case Studies from Norwegian Shipbuilding First Tier Suppliers.” International Journal of Production Economics 108211, doi:10.1016/j.ijpe.2021.108211.
  • Amaro, Graça, Linda Hendry, and Brian Kingsman. 1999. “Competitive Advantage, Customisation and a new Taxonomy for non Make-to-Stock Companies.” International Journal of Operations & Production Management 19 (4): 349–371.
  • Ameri, Farhad, Dusan Sormaz, Foivos Psarommatis, and Dimitris Kiritsis. 2021. “Industrial Ontologies for Interoperability in Agile and Resilient Manufacturing.” International Journal of Production Research 60 (2): 420–441.
  • Anthony, Robert Newton. 1965. Planning and control systems: a framework for analysis: Division of Research, Graduate School of Business Administration, Harvard University.
  • Arredondo, F., and E. Martinez. 2010. “Learning and Adaptation of a Policy for Dynamic Order Acceptance in Make-to-Order Manufacturing.” Computers and Industrial Engineering 58 (1): 70–83. doi:10.1016/j.cie.2009.08.005.
  • Aslan, B., M. Stevenson, and L. C. Hendry. 2012. “Enterprise Resource Planning Systems: An Assessment of Applicability to Make-To-Order Companies.” Computers in Industry 63 (7): 692–705. doi:10.1016/j.compind.2012.05.003.
  • Aslan, B., M. Stevenson, and L. C. Hendry. 2015. “The Applicability and Impact of Enterprise Resource Planning (ERP) Systems: Results from a Mixed Method Study on Make-To-Order (MTO) Companies.” Computers in Industry 70: 127–43. doi:10.1016/j.compind.2014.10.003.
  • Azevedo, A. L., and J. P. Sousa. 2000. “Component-based Approach to Support Order Planning in a Distributed Manufacturing Enterprise.” Journal of Materials Processing Technology 107 (1-3): 431–8. doi:10.1016/S0924-0136(00)00680-4.
  • Baker, Kenneth R. 1984. “Sequencing Rules and due-Date Assignments in a job Shop.” Management Science 30 (9): 1093–104.
  • Bector, C. R., Y. P. Gupta, and M. C. Gupta. 1988. “Determination of an Optimal Common due Date and Optimal Sequence in a Single Machine job Shop.” International Journal of Production Research 26 (4): 613–28.
  • Bender, J., and J. Ovtcharova. 2021. “Prototyping Machine-Learning-Supported Lead Time Prediction Using AutoML.” Paper presented at the Procedia Computer Science.
  • Bertrand, J. W. M. 1983. “The Effect of Workload Dependent due-Dates on job Shop Performance.” Management Science 29 (7): 799–816.
  • Bertrand, J. W. M., and Dennis R Muntslag. 1993. “Production Control in Engineer-to-Order Firms.” International Journal of Production Economics 30: 3–22.
  • Bıçakcı, P. S., and İ Kara. 2019. “Order Acceptance and Scheduling Problem: A Proposed Formulation and the Comparison with the Literature.” Advances in Intelligent Systems and Computing 971: 310–316.
  • Bıçakcı, P. S., İ Kara, and M. Sağır. 2021. “Single-Machine Order Acceptance and Scheduling Problem Considering Setup Time and Release Date Relations.” Arabian Journal for Science and Engineering 46 (2): 1549–59. doi:10.1007/s13369-020-04759-1.
  • Bookbinder, James H, and Afzal Ibn Noor. 1985. “Setting job-Shop due-Dates with Service-Level Constraints.” Journal of the Operational Research Society 36 (11): 1017–26.
  • Brachmann, R., and R. Kolisch. 2021. “The Impact of Flexibility on Engineer-to-Order Production Planning.” International Journal of Production Economics 239, doi:10.1016/j.ijpe.2021.108183.
  • Buer, Sven-Vegard, Jan Ola Strandhagen, and Felix TS Chan. 2018. “The Link Between Industry 4.0 and Lean Manufacturing: Mapping Current Research and Establishing a Research Agenda.” International Journal of Production Research 56 (8): 2924–40.
  • Buer, Sven-Vegard, Jo Wessel Strandhagen, Jan Ola Strandhagen, and Erlend Alfnes. 2016. “Strategic fit of Planning Environments: Towards an Integrated Framework.” Paper presented at the International Conference on information systems, Logistics and supply chain.
  • Calosso, T., M. Cantamessa, D. Vu, and A. Villa. 2003. “Production Planning and Order Acceptance in Business to Business Electronic Commerce.” International Journal of Production Economics 85 (2): 233–49. doi:10.1016/S0925-5273(03)00112-9.
  • Cannas, Violetta Giada, and Jonathan Gosling. 2021. “A Decade of Engineering-to-Order (2010-2020): Progress and Emerging Themes.” International Journal of Production Economics 241: 108274.
  • Cannas, Violetta G, Jonathan Gosling, Margherita Pero, and Tommaso Rossi. 2019. “Engineering and Production Decoupling Configurations: An Empirical Study in the Machinery Industry.” International Journal of Production Economics 216: 173–89.
  • Cannas, Violetta G, Jonathan Gosling, Margherita Pero, and Tommaso Rossi. 2020. “Determinants for Order-Fulfilment Strategies in Engineer-to-Order Companies: Insights from the Machinery Industry.” International Journal of Production Economics 228: 107743.
  • Carvalho, A. N., F. Oliveira, and L. F. Scavarda. 2015. “Tactical Capacity Planning in a Real-World ETO Industry Case: An Action Research.” International Journal of Production Economics 167: 187–203. doi:10.1016/j.ijpe.2015.05.032.
  • Carvalho, A. N., F. Oliveira, and L. F. Scavarda. 2016. “Tactical Capacity Planning in a Real-World ETO Industry Case: A Robust Optimization Approach.” International Journal of Production Economics 180: 158–71. doi:10.1016/j.ijpe.2016.07.019.
  • Cesaret, B., C. O g˘uz, and F. Sibel Salman. 2012. “A Tabu Search Algorithm for Order Acceptance and Scheduling.” Computers and Operations Research 39 (6): 1197–205. doi:10.1016/j.cor.2010.09.018.
  • Chapman, S. N., J. R. T. Arnold, A. K. Gatewood, T. Arnold, and L. M. Clive. 2017. Introduction to Materials Management. Harlow: Pearson Education Limited.
  • Cheng, T. C. E. 1986. “Optimal due-Date Assignment in a job Shop.” International Journal of Production Research 24 (3): 503–15.
  • Cheng, T. C. E., and M. C. Gupta. 1989. “Survey of Scheduling Research Involving due Date Determination Decisions.” European Journal of Operational Research 38 (2): 156–66.
  • Corti, D., A. Pozzetti, and M. Zorzini. 2006. “A Capacity-Driven Approach to Establish Reliable due Dates in a MTO Environment.” International Journal of Production Economics 104 (2): 536–54. doi:10.1016/j.ijpe.2005.03.003.
  • Danese, Pamela, Margherita Molinaro, and Pietro Romano. 2018. “Managing Evolutionary Paths in Sales and Operations Planning: Key Dimensions and Sequences of Implementation.” International Journal of Production Research 56 (5): 2036–53.
  • De Boer, R., J. M. J. Schutten, and W. H. M. Zijm. 1997. “A Decision Support System for Ship Maintenance Capacity Planning.” CIRP Annals - Manufacturing Technology 46 (1): 391–X82. doi:10.1016/s0007-8506(07)60850-6.
  • de Man, Johannes Cornelis, and Jan Ola Strandhagen. 2018. “Spreadsheet Application Still Dominates Enterprise Resource Planning and Advanced Planning Systems.” IFAC-PapersOnLine 51 (11): 1224–9.
  • Easton, F. F., and D. R. Moodie. 1999. “Pricing and Lead Time Decisions for Make-to-Order Firms with Contingent Orders.” European Journal of Operational Research 116 (2): 305–18. doi:10.1016/s0377-2217(98)00101-5.
  • Ebadian, M., M. Rabbani, F. Jolai, S. A. Torabi, and R. Tavakkoli-Moghaddam. 2008. “A new Decision-Making Structure for the Order Entry Stage in Make-to-Order Environments.” International Journal of Production Economics 111 (2): 351–67. doi:10.1016/j.ijpe.2007.01.004.
  • Ebadian, M., M. Rabbani, S. A. Torabi, and F. Jolai. 2009. “Hierarchical Production Planning and Scheduling in Make-to-Order Environments: Reaching Short and Reliable Delivery Dates.” International Journal of Production Research 47 (20): 5761–89. doi:10.1080/00207540802010799.
  • Ebben, Mark JR, Erwin W Hans, and F. M. Olde Weghuis. 2005. “Workload Based Order Acceptance in job Shop Environments.” OR Spectrum 27 (1): 107–22.
  • Eilon, Samuel, and I. G. Chowdhury. 1976. “Due Dates in job Shop Scheduling.” International Journal of Production Research 14 (2): 223–37.
  • ElHafsi, M. 2000. “An Operational Decision Model for Lead-Time and Price Quotation in Congested Manufacturing Systems.” European Journal of Operational Research 126 (2): 355–70. doi:10.1016/s0377-2217(99)00294-5.
  • Germs, R., and N. D. Van Foreest. 2013. “Order Acceptance and Scheduling Policies for a Make-to-Order Environment with Family-Dependent Lead and Batch Setup Times.” International Journal of Production Research 51 (3): 940–51. doi:10.1080/00207543.2012.693638.
  • Ghiyasinasab, M., N. Lehoux, S. Ménard, and C. Cloutier. 2021. “Production Planning and Project Scheduling for Engineer-to-Order Systems- Case Study for Engineered Wood Production.” International Journal of Production Research 59 (4): 1068–87. doi:10.1080/00207543.2020.1717009.
  • Gordon, Valery, Jean-Marie Proth, and Chengbin Chu. 2002. “A Survey of the State-of-the-art of Common due Date Assignment and Scheduling Research.” European Journal of Operational Research 139 (1): 1–25.
  • Gosling, Jonathan, and Mohamed M Naim. 2009. “Engineer-to-order Supply Chain Management: A Literature Review and Research Agenda.” International Journal of Production Economics 122 (2): 741–54.
  • Gourdon, Karin, and Christian Steidl. 2019. “Global value chains and the shipbuilding industry.”.
  • Grabenstetter, D. H., and J. M. Usher. 2013. “Determining job Complexity in an Engineer to Order Environment for due Date Estimation Using a Proposed Framework.” International Journal of Production Research 51 (19): 5728–40.
  • Grabenstetter, D. H., and J. M. Usher. 2014. “Developing due Dates in an Engineer-to-Order Engineering Environment.” International Journal of Production Research 52 (21): 6349–61. doi:10.1080/00207543.2014.940072.
  • Grimson, J Andrew, and David F Pyke. 2007. “Sales and Operations Planning: An Exploratory Study and Framework.” The International Journal of Logistics Management 18 (3): 322–346.
  • Hans, Erwin W, Willy Herroelen, Roel Leus, and Gerhard Wullink. 2007. “A Hierarchical Approach to Multi-Project Planning Under Uncertainty.” Omega 35 (5): 563–77.
  • Hao, J., J. Yu, M. Wu, and X. Chen. 2013. “Customer-value-based Order Acceptance Policy in Make-to-Order Manufacturing.” Paper presented at the proceedings - 2013 International Conference on computational and information sciences, ICCIS 2013.
  • Heard, E. L. 1976. “Due-dates and Instantaneous Load in the one-Machine Shop.” Management Science 23 (4): 444–50.
  • Hegedus, M. G., and W. J. Hopp. 2001. “Due Date Setting with Supply Constraints in Systems Using MRP.” Computers and Industrial Engineering 39 (3-4): 293–305. doi:10.1016/S0360-8352(01)00007-9.
  • Hemmati, S., M. Ebadian, and A. Nahvi. 2012. “A new Decision Making Structure for Managing Arriving Orders in MTO Environments.” Expert Systems with Applications 39 (3): 2669–76. doi:10.1016/j.eswa.2011.08.122.
  • Hendry, L. C., and B. G. Kingsman. 1989. “Production Planning Systems and Their Applicability to Make-to-Order Companies.” European Journal of Operational Research 40 (1): 1–15. doi:10.1016/0377-2217(89)90266-X.
  • Hendry, L. C., and B. G. Kingsman. 1993. “Customer Enquiry Management: Part of a Hierarchical System to Control Lead Times in Make-to-Order Companies.” Journal of the Operational Research Society 44 (1): 61–70. doi:10.1057/jors.1993.7.
  • Hicks, C., and P. M. Braiden. 2000. “Computer-aided Production Management Issues in the Engineer-to-Order Production of Complex Capital Goods Explored Using a Simulation Approach.” International Journal of Production Research 38 (18): 4783–810. doi:10.1080/00207540010001019.
  • Hicks, C., T. McGovern, and C. F. Earl. 2000. “Supply Chain Management: A Strategic Issue in Engineer to Order Manufacturing.” International Journal of Production Economics 65 (2): 179–90. doi:10.1016/S0925-5273(99)00026-2.
  • Hicks, Chris, Tom McGovern, and Chris F Earl. 2001. “A Typology of UK Engineer-to-Order Companies.” International Journal of Logistics 4 (1): 43–56.
  • Hing, M Mainegra, Aart van Harten, and P. C. Schuur. 2007. “Reinforcement Learning Versus Heuristics for Order Acceptance on a Single Resource.” Journal of Heuristics 13 (2): 167–87.
  • Hopp, Wallace J, and Melanie L Roof Sturgis. 2000. “Quoting Manufacturing due Dates Subject to a Service Level Constraint.” Iie Transactions 32 (9): 771–84.
  • Hsu, S. Y., and D. Y. Sha. 2004. “Due Date Assignment Using Artificial Neural Networks Under Different Shop Floor Control Strategies.” International Journal of Production Research 42 (9): 1727–45.
  • Huang, Y. 2017. “Information Architecture for Effective Workload Control: An Insight from a Successful Implementation.” Production Planning and Control 28 (5): 351–66. doi:10.1080/09537287.2017.1288278.
  • Hvolby, Hans-Henrik, and Kenn Steger-Jensen. 2010. “Technical and Industrial Issues of Advanced Planning and Scheduling (APS) Systems.” Computers in Industry 61 (9): 845–51.
  • Iakymenko, Natalia, Anita Romsdal, Marco Semini, and Jan Ola Strandhagen. 2018. “Managing Engineering Changes in the Engineer-to-Order Environment: Challenges and Research Needs.” IFAC-PapersOnLine 51 (11): 144–51.
  • Ioannou, G., and S. Dimitriou. 2012. “Lead Time Estimation in MRP/ERP for Make-to-Order Manufacturing Systems.” International Journal of Production Economics 139 (2): 551–63. doi:10.1016/j.ijpe.2012.05.029.
  • Ivert, Linea Kjellsdotter, and Patrik Jonsson. 2011. “Problems in the Onward and Upward Phase of APS System Implementation: Why do They Occur?” International Journal of Physical Distribution & Logistics Management 41 (4): 343–363.
  • Jahangirian, Mohsen, Tillal Eldabi, Aisha Naseer, Lampros K Stergioulas, and Terry Young. 2010. “Simulation in Manufacturing and Business: A Review.” European Journal of Operational Research 203 (1): 1–13.
  • Kalantari, M., M. Rabbani, and M. Ebadian. 2011. “A Decision Support System for Order Acceptance/Rejection in Hybrid MTS/MTO Production Systems.” Applied Mathematical Modelling 35 (3): 1363–77. doi:10.1016/j.apm.2010.09.015.
  • Kalpic, Brane, and Peter Bernus. 2002. “Business Process Modelling in Industry—the Powerful Tool in Enterprise Management.” Computers in Industry 47 (3): 299–318.
  • Kapuscinski, R., and S. Tayur. 2007. “Reliable due-Date Setting in a Capacitated MTO System with two Customer Classes.” Operations Research 55 (1): 56–74. doi:10.1287/opre.1060.0339.
  • Kingsman, B. G. 2000. “Modelling Input-Output Workload Control for Dynamic Capacity Planning in Production Planning Systems.” International Journal of Production Economics 68 (1): 73–93. doi:10.1016/S0925-5273(00)00037-2.
  • Kingsman, B., L. Hendry, A. Mercer, and A. De Souza. 1996. “Responding to Customer Enquiries in Make-to-Order Companies Problems and Solutions.” International Journal of Production Economics 46-47: 219–31. doi:10.1016/0925-5273(95)00199-9.
  • Kingsman, B. G., and A. Mercer. 1997. “Strike Rate Matrices for Integrating Marketing and Production During the Tendering Process in Make-to-Order Subcontractors.” International Transactions in Operational Research 4 (4): 251–7. doi:10.1111/j.1475-3995.1997.tb00081.x.
  • Kingsman, B. G., I. P. Tatsiopoulos, and L. C. Hendry. 1989. “A Structural Methodology for Managing Manufacturing Lead Times in Make-to-Order Companies.” European Journal of Operational Research 40 (2): 196–209. doi:10.1016/0377-2217(89)90330-5.
  • Kingsman, B., L. Worden, L. Hendry, A. Mercer, and E. Wilson. 1993. “Integrating Marketing and Production Planning in Make-to-Order Companies.” International Journal of Production Economics 30-31 (C): 53–66. doi:10.1016/0925-5273(93)90081-U.
  • Konijnendijk, Paul A. 1994. “Coordinating Marketing and Manufacturing in ETO Companies.” International Journal of Production Economics 37 (1): 19–26.
  • Křemen, Petr, and Zdeněk Kouba. 2011. “Ontology-driven Information System Design.” IEEE Transactions on Systems, Man, and Cybernetics, Part C (Applications and Reviews) 42 (3): 334–44.
  • Kristensen, Jesper, and Patrik Jonsson. 2018. “Context-based Sales and Operations Planning (S&OP) Research.” International Journal of Physical Distribution & Logistics Management 48 (1): 19–46.
  • Li, X., and J. A. Ventura. 2020. “Exact Algorithms for a Joint Order Acceptance and Scheduling Problem.” International Journal of Production Economics 223), doi:10.1016/j.ijpe.2019.107516.
  • Liao, C. J., and H. T. Lin. 1998. “A Case Study in a Dual Resource Constrained job Shop.” International Journal of Production Research 36 (11): 3095–111. doi:10.1080/002075498192319.
  • Lin, S. W., and K. C. Ying. 2013. “Increasing the Total net Revenue for Single Machine Order Acceptance and Scheduling Problems Using an Artificial bee Colony Algorithm.” Journal of the Operational Research Society 64 (2): 293–311. doi:10.1057/jors.2012.47.
  • Lin, S. W., and K. C. Ying. 2015. “Order Acceptance and Scheduling to Maximize Total net Revenue in Permutation Flowshops with Weighted Tardiness.” Applied Soft Computing 30: 462–74. doi:10.1016/j.asoc.2015.01.069.
  • Manavizadeh, N., A. Hasani Goodarzi, M. Rabbani, and F. Jolai. 2013. “Order Acceptance/Rejection Policies in Determining the Sequence in Mixed Model Assembly Lines.” Applied Mathematical Modelling 37 (4): 2531–51. doi:10.1016/j.apm.2012.06.012.
  • Mello, Mario Henrique, Jonathan Gosling, Mohamed M Naim, Jan Ola Strandhagen, and Per Olaf Brett. 2017. “Improving Coordination in an Engineer-to-Order Supply Chain Using a Soft Systems Approach.” Production Planning & Control 28 (2): 89–107.
  • Mestry, Siddharth, Purushothaman Damodaran, and Chin-Sheng Chen. 2011. “A Branch and Price Solution Approach for Order Acceptance and Capacity Planning in Make-to-Order Operations.” European Journal of Operational Research 211 (3): 480–95.
  • Micale, R., C. M. La Fata, M. Enea, and G. La Scalia. 2021. “Regenerative Scheduling Problem in Engineer to Order Manufacturing: An Economic Assessment.” Journal of Intelligent Manufacturing, doi:10.1007/s10845-020-01728-1.
  • Moher, David, Alessandro Liberati, Jennifer Tetzlaff, Douglas G Altman, and Prisma Group. 2009. “Preferred Reporting Items for Systematic Reviews and Meta-Analyses: The PRISMA Statement.” PLoS Medicine 6 (7): e1000097.
  • Moses, Scott A. 1999. “Due Date Assignment Using Feedback Control with Reinforcement Learning.” Iie Transactions 31 (10): 989–99.
  • Moses, Scott, Hank Grant, L. Gruenwald, and S. Pulat. 2004. “Real-time due-Date Promising by Build-to-Order Environments.” International Journal of Production Research 42 (20): 4353–75.
  • Mourtzis, D., M. Doukas, K. Fragou, K. Efthymiou, and V. Matzorou. 2014. “Knowledge-Based Estimation of Manufacturing Lead Time for Complex Engineered-To-Order Products.” Paper presented at the Procedia CIRP.
  • Mourtzis, D., M. Doukas, and E. Vlachou. 2016. “A Mobile Application for Knowledge-Enriched Short-Term Scheduling of Complex Products.” Logistics Research 9 (1): 1–17. doi:10.1007/s12159-015-0130-7.
  • Mundt, C., and H. Lödding. 2020. Order Acceptance and Scheduling with a Throughput Diagram.” In IFIP Advances in Information and Communication Technology, 351-359.
  • Nam, S., H. Shen, C. Ryu, and J. G. Shin. 2018. “SCP-Matrix Based Shipyard APS Design: Application to Long-Term Production Plan.” International Journal of Naval Architecture and Ocean Engineering 10 (6): 741–61. doi:10.1016/j.ijnaoe.2017.10.003.
  • Nguyen, Su. 2016. “A Learning and Optimizing System for Order Acceptance and Scheduling.” International Journal of Advanced Manufacturing Technology 86 (5): 2021–36.
  • Nguyen, S., M. Zhang, and M. Johnston. 2014. Enhancing Branch-and-Bound Algorithms for Order Acceptance and Scheduling with Genetic Programming.” In Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics), 124-136.
  • Nguyen, S., M. Zhang, M. Johnston, and K. C. Tan. 2013. Learning reusable initial solutions for multi-objective order acceptance and scheduling problems with genetic programming.” In Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics), 157-168.
  • O g˘uz, Ceyda, F. Sibel Salman, and Zehra Bilgintürk Yalçın. 2010. “Order Acceptance and Scheduling Decisions in Make-to-Order Systems.” International Journal of Production Economics 125 (1): 200–11.
  • Olhager, J. 2003. “Strategic Positioning of the Order Penetration Point.” International Journal of Production Economics 85 (3): 319–29. doi:10.1016/S0925-5273(03)00119-1.
  • Özdamar, L., and T. Yazgaç. 1997. “Capacity Driven due Date Settings in Make-to-Order Production Systems.” International Journal of Production Economics 49 (1): 29–44. doi:10.1016/S0925-5273(96)00116-8.
  • Öztürk, A., S. Kayaligil, and N. E. Özdemirel. 2006. “Manufacturing Lead Time Estimation Using Data Mining.” European Journal of Operational Research 173 (2): 683–700. doi:10.1016/j.ejor.2005.03.015.
  • Park, J., S. Nguyen, M. Zhang, and M. Johnston. 2014. Enhancing heuristics for order acceptance and scheduling using genetic programming.” In Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics), 723-734.
  • Park, C., J. Song, J. G. Kim, and I. Kim. 1999. “Delivery Date Decision Support System for the Large Scale Make-to-Order Manufacturing Companies: A Korean Electric Motor Company Case.” Production Planning and Control 10 (6): 585–97. doi:10.1080/095372899232885.
  • Parsaei, S., M. A. Keramati, F. Zorriassatine, and M. R. Feylizadeh. 2012. “An Order Acceptance Using FAHP and TOPSIS Methods: A Case Study of Iranian Vehicle Belt Production Industry.” International Journal of Industrial Engineering Computations 3 (2): 211–24. doi:10.5267/j.ijiec.2011.08.002.
  • Pereira, Daniel Filipe, José Fernando Oliveira, and Maria Antónia Carravilla. 2020. “Tactical Sales and Operations Planning: A Holistic Framework and a Literature Review of Decision-Making Models.” International Journal of Production Economics 228: 107695.
  • Philipoom, Patrick R, Loren Paul Rees, and Lars Wiegmann. 1994. “Using Neural Networks to Determine Internally-Set Due-Date Assignments for Shop Scheduling.” Decision Sciences 25 (5-6): 825–851.
  • Piya, S., M. M. R. K. Khadem, and A. Shamsuzzoha. 2016. “Negotiation Based Decision Support System for Order Acceptance.” Journal of Manufacturing Technology Management 27 (3): 443–68. doi:10.1108/JMTM-04-2015-0023.
  • Rafiei, H., and M. Rabbani. 2012. “Capacity Coordination in Hybrid Make-to-Stock/Make-to-Order Production Environments.” International Journal of Production Research 50 (3): 773–89. doi:10.1080/00207543.2010.543174.
  • Ragatz, Gary L, and Vincent A Mabert. 1984a. “A Framework for the Study of due Date Management in job Shops.” International Journal of Production Research 22 (4): 685–95.
  • Ragatz, Gary L, and Vincent A Mabert. 1984b. “A Simulation Analysis of due Date Assignment Rules.” Journal of Operations Management 5 (1): 27–39.
  • Rahman, H. F., M. N. Janardhanan, and I. E. Nielsen. 2019. “Real-time Order Acceptance and Scheduling Problems in a Flow Shop Environment Using Hybrid Ga-PSO Algorithm.” IEEE Access 7: 112742–55. doi:10.1109/ACCESS.2019.2935375.
  • Rahman, Humyun Fuad, Ruhul Sarker, and Daryl Essam. 2015. “A Real-Time Order Acceptance and Scheduling Approach for Permutation Flow Shop Problems.” European Journal of Operational Research 247 (2): 488–503.
  • Rasti-Barzoki, M., and S. R. Hejazi. 2013. “Minimizing the Weighted Number of Tardy Jobs with due Date Assignment and Capacity-Constrained Deliveries for Multiple Customers in Supply Chains.” European Journal of Operational Research 228 (2): 345–57. doi:10.1016/j.ejor.2013.01.002.
  • Robinson, K. R., and S. A. Moses. 2006. “Effect of Granularity of Resource Availability on the Accuracy of due Date Assignment.” International Journal of Production Research 44 (24): 5391–414. doi:10.1080/00207540600665810.
  • Roman, D. B., and A. G. del Vallei. 1996. “Dynamic Assignation of due-Dates in an Assembly Shop Based in Simulation.” International Journal of Production Research 34 (6): 1539–54.
  • Ruben, Robert A, and Farzad Mahmoodi. 2000. “Lead Time Prediction in Unbalanced Production Systems.” International Journal of Production Research 38 (7): 1711–29.
  • Sawik, T. 2009. “Multi-objective due-Date Setting in a Make-to-Order Environment.” International Journal of Production Research 47 (22): 6205–31. doi:10.1080/00207540902810585.
  • Scheuermann, Andreas, and Joerg Leukel. 2014. “Supply Chain Management Ontology from an Ontology Engineering Perspective.” Computers in Industry 65 (6): 913–23.
  • Schneckenreither, M., S. Haeussler, and C. Gerhold. 2020. “Order Release Planning with Predictive Lead Times: A Machine Learning Approach.” International Journal of Production Research, doi:10.1080/00207543.2020.1859634.
  • Seidmann, Abraham, and Milton L Smith. 1981. “Due Date Assignment for Production Systems.” Management Science 27 (5): 571–81.
  • Semini, Marco, Dag E Gotteberg Haartveit, Erlend Alfnes, Emrah Arica, Per Olaf Brett, and Jan Ola Strandhagen. 2014. “Strategies for Customized Shipbuilding with Different Customer Order Decoupling Points.” Proceedings of the Institution of Mechanical Engineers, Part M: Journal of Engineering for the Maritime Environment 228 (4): 362–72.
  • Shurrab, Hafez, Patrik Jonsson, and Mats I Johansson. 2020. “A Tactical Demand-Supply Planning Framework to Manage Complexity in Engineer-to-Order Environments: Insights from an in-Depth Case Study.” Production Planning & Control 33 (5): 462–479.
  • Silva, Yuri Laio TV, Anand Subramanian, and Artur Alves Pessoa. 2018. “Exact and Heuristic Algorithms for Order Acceptance and Scheduling with Sequence-Dependent Setup Times.” Computers & Operations Research 90: 142–60.
  • Slotnick, Susan A. 2011. “Order Acceptance and Scheduling: A Taxonomy and Review.” European Journal of Operational Research 212 (1): 1–11.
  • Smith, C. H., E. D. Minor, and H. J. Wen. 1995. “Regression-based due Date Assignment Rules for Improved Assembly Shop Performance.” International Journal of Production Research 33 (9): 2375–85.
  • Stavrulaki, Euthemia, and Mark Davis. 2010. “Aligning Products with Supply Chain Processes and Strategy.” The International Journal of Logistics Management 21 (1): 127–151.
  • Stevenson, M. 2006. “Refining a Workload Control (WLC) Concept: A Case Study.” International Journal of Production Research 44 (4): 767–90. doi:10.1080/00207540500338070.
  • Stevenson, W. J. 2015. Operations Management. New York: McGraw-Hill Education.
  • Stevenson, Mark, Linda C Hendry, and Brian G Kingsman. 2005. “A Review of Production Planning and Control: The Applicability of key Concepts to the Make-to-Order Industry.” International Journal of Production Research 43 (5): 869–98.
  • Strandhagen, Jo Wessel, Sven-Vegard Buer, Marco Semini, Erlend Alfnes, and Jan Ola Strandhagen. 2020. “Sustainability Challenges and how Industry 4.0 Technologies Can Address Them: A Case Study of a Shipbuilding Supply Chain.” Production Planning & Control, 1–16.
  • Studer, Rudi, V. Richard Benjamins, and Dieter Fensel. 1998. “Knowledge Engineering: Principles and Methods.” Data & Knowledge Engineering 25 (1-2): 161–97.
  • Tatsiopoulos, I. P., and B. G. Kingsman. 1983. “Lead Time Management.” European Journal of Operational Research 14 (4): 351–8.
  • Thevenin, S., N. Zufferey, and M. Widmer. 2015. “Metaheuristics for a Scheduling Problem with Rejection and Tardiness Penalties.” Journal of Scheduling 18 (1): 89–105. doi:10.1007/s10951-014-0395-8.
  • Thomé, Antônio Márcio Tavares, Luiz Felipe Scavarda, and Annibal José Scavarda. 2016. “Conducting Systematic Literature Review in Operations Management.” Production Planning & Control 27 (5): 408–20.
  • Thürer, Matthias, George Huang, Mark Stevenson, Cristovao Silva, and Moacir Godinho Filho. 2012. “The Performance of Due Date Setting Rules in Assembly and Multi-Stage job Shops: An Assessment by Simulation.” International Journal of Production Research 50 (20): 5949–65.
  • Thürer, M., and M. Stevenson. 2016. “Card-based Delivery Date Promising in Pure Flow Shops with Order Release Control.” International Journal of Production Research 54 (22): 6798–811. doi:10.1080/00207543.2016.1177672.
  • Thürer, M., M. Stevenson, C. Silva, and M. Land. 2013. “Towards an Integrated Workload Control (WLC) Concept: The Performance of due Date Setting Rules in job Shops with Contingent Orders.” International Journal of Production Research 51 (15): 4502–16. doi:10.1080/00207543.2013.774485.
  • Thürer, M., M. Stevenson, C. Silva, M. J. Land, L. D. Fredendall, and S. A. Melnyk. 2014. “Lean Control for Make-to-Order Companies: Integrating Customer Enquiry Management and Order Release.” Production and Operations Management 23 (3): 463–76. doi:10.1111/poms.12058.
  • Tranfield, David, David Denyer, and Palminder Smart. 2003. “Towards a Methodology for Developing Evidence-Informed Management Knowledge by Means of Systematic Review.” British Journal of Management 14 (3): 207–22.
  • Usman, Zahid, Robert IM Young, Nitishal Chungoora, Claire Palmer, Keith Case, and Jennifer A Harding. 2013. “Towards a Formal Manufacturing Reference Ontology.” International Journal of Production Research 51 (22): 6553–72.
  • Van Foreest, N. D., J. Wijngaard, and T. Van Der Vaart. 2010. “Scheduling and Order Acceptance for the Customised Stochastic lot Scheduling Problem.” International Journal of Production Research 48 (12): 3561–78. doi:10.1080/00207540802448882.
  • Wagire, Aniruddha Anil, Rohit Joshi, Ajay Pal Singh Rathore, and Rakesh Jain. 2021. “Development of Maturity Model for Assessing the Implementation of Industry 4.0: Learning from Theory and Practice.” Production Planning & Control 32 (8): 603–22.
  • Wang, D., S. C. Fang, and T. J. Hodgson. 1998. “A Fuzzy due-Date Bargainer for the Make-to-Order Manufacturing Systems.” IEEE Transactions on Systems, Man and Cybernetics Part C: Applications and Reviews 28 (3): 492–7. doi:10.1109/5326.704596.
  • Wang, Z., Y. Qi, H. Cui, and J. Zhang. 2019. “A Hybrid Algorithm for Order Acceptance and Scheduling Problem in Make-to-Stock/Make-to-Order Industries.” Computers and Industrial Engineering 127: 841–52. doi:10.1016/j.cie.2018.11.021.
  • Wang, X., X. Xie, and T. C. E. Cheng. 2013. “A Modified Artificial bee Colony Algorithm for Order Acceptance in two-Machine Flow Shops.” International Journal of Production Economics 141 (1): 14–23. doi:10.1016/j.ijpe.2012.06.003.
  • Wang, L., Z. Zhang, and Y. Yin. 2019. Order Acceptance and Scheduling Considering Lot-Spitting in seru Production System.” Paper presented at the IEEE International Conference on Industrial Engineering and Engineering Management.
  • Watanapa, B., and A. Techanitisawad. 2005a. “A Genetic Algorithm for the Multi-Class Contingent Bidding Model.” OR Spectrum 27 (4): 525–49. doi:10.1007/s00291-004-0192-4.
  • Watanapa, Bunthit, and Anulark Techanitisawad. 2005b. “Simultaneous Price and due Date Settings for Multiple Customer Classes.” European Journal of Operational Research 166 (2): 351–68.
  • Watson, Richard T, and Jane Webster. 2020. “Analysing the Past to Prepare for the Future: Writing a Literature Review a Roadmap for Release 2.0.” Journal of Decision Systems 29 (3): 129–47.
  • Wattanapornprom, W., and T. K. Li. 2013. The Merging of MPS and Order Acceptance in a Semi-Order-Driven Industry: A Case Study of the Parasol Industry.” In 2013 IEEE International Conference on Industrial Engineering and Engineering Management, 996-1001. New York: IEEE.
  • Webster, Jane, and Richard T Watson. 2002. “Analyzing the Past to Prepare for the Future: Writing a Literature Review.” MIS Quarterly 26 (2): xiii–xxiii.
  • Weeks, James K. 1979. “A Simulation Study of Predictable due-Dates.” Management Science 25 (4): 363–73.
  • Wikner, Joakim, and Martin Rudberg. 2005. “Integrating Production and Engineering Perspectives on the Customer Order Decoupling Point.” International Journal of Operations & Production Management 25 (7): 623–641.
  • Willner, Olga, Daryl Powell, Markus Gerschberger, and Paul Schönsleben. 2016. “Exploring the Archetypes of Engineer-to-Order: An Empirical Analysis.” International Journal of Operations & Production Management 36 (3): 242–264.
  • Wu, G. H., C. Y. Cheng, H. I. Yang, and C. T. Chena. 2018. “An Improved Water Flow-Like Algorithm for Order Acceptance and Scheduling with Identical Parallel Machines.” Applied Soft Computing 71: 1072–84. doi:10.1016/j.asoc.2017.10.015.
  • Wu, H. H., and J. Y. Liu. 2008. “A Capacity Available-to-Promise Model for Drum-Buffer-Rope Systems.” International Journal of Production Research 46 (8): 2255–74. doi:10.1080/00207540601039783.
  • Wullink, Gerhard, A. J. R. M. Gademann, Erwin W Hans, and Aart van Harten. 2004. “Scenario-based Approach for Flexible Resource Loading Under Uncertainty.” International Journal of Production Research 42 (24): 5079–98.
  • Xiao, Yi-Yong, Ren-Qian Zhang, Qiu-Hong Zhao, and Ikou Kaku. 2012. “Permutation Flow Shop Scheduling with Order Acceptance and Weighted Tardiness.” Applied Mathematics and Computation 218 (15): 7911–26.
  • Yang, W., and R. Y. K. Fung. 2014. “An Available-to-Promise Decision Support System for a Multi-Site Make-to-Order Production System.” International Journal of Production Research 52 (14): 4253–66. doi:10.1080/00207543.2013.877612.
  • Zennaro, I., S. Finco, D. Battini, and A. Persona. 2019. “Big Size Highly Customised Product Manufacturing Systems: A Literature Review and Future Research Agenda.” International Journal of Production Research 57 (15-16): 5362–85. doi:10.1080/00207543.2019.1582819.
  • Zhang, R., and C. Wu. 2012. “A Double-Layered Optimisation Approach for the Integrated due Date Assignment and Scheduling Problem.” International Journal of Production Research 50 (1): 5–22. doi:10.1080/00207543.2011.571440.
  • Zheng, Ting, Marco Ardolino, Andrea Bacchetti, and Marco Perona. 2021. “The Applications of Industry 4.0 Technologies in Manufacturing Context: A Systematic Literature Review.” International Journal of Production Research 59 (6): 1922–54.
  • Zhong, Xueling, Jinwen Ou, and Guoqing Wang. 2014. “Order Acceptance and Scheduling with Machine Availability Constraints.” European Journal of Operational Research 232 (3): 435–41.
  • Zijm, W. H. M. 2000. “Towards Intelligent Manufacturing Planning and Control Systems.” OR Spektrum 22 (3): 313–45. doi:10.1007/s002919900032.
  • Zorzini, M., D. Corti, and A. Pozzetti. 2008. “Due Date (DD) Quotation and Capacity Planning in Make-to-Order Companies: Results from an Empirical Analysis.” International Journal of Production Economics 112 (2): 919–33. doi:10.1016/j.ijpe.2007.08.005.
  • Zorzini, M., L. Hendry, M. Stevenson, and A. Pozzetti. 2008. “Customer Enquiry Management and Product Customization: An Empirical Multi-Case Study Analysis in the Italian Capital Goods Sector.” International Journal of Operations and Production Management 28 (12): 1186–218. doi:10.1108/01443570810919369.
  • Zorzini, Marta, Mark Stevenson, and Linda C Hendry. 2012. “Customer Enquiry Management in Global Supply Chains: A Comparative Multi-Case Study Analysis.” European Management Journal 30 (2): 121–40.