884
Views
10
CrossRef citations to date
0
Altmetric
Research Articles

A new neighbourhood structure for job shop scheduling problems

, , &
Pages 2147-2161 | Received 09 Dec 2021, Accepted 15 Mar 2022, Published online: 30 Apr 2022

References

  • Abedi, M., R. Chiong, N. Noman, and R. Zhang. 2020. “A Multi-Population, Multi-Objective Memetic Algorithm for Energy-Efficient Job-Shop Scheduling with Deteriorating Machines.” Expert Systems with Applications 157: 113348.
  • Adams, J., E. Balas, and D. Zawack. 1988. “The Shifting Bottleneck Procedure for Job Shop Scheduling.” Management Science 34 (3): 391–401.
  • Ahmadian, M. M., A. Salehipour, and T. C. E. Cheng. 2020. “A Meta-Heuristic to Solve the Just-in-Time Job-Shop Scheduling Problem.” European Journal of Operational Research 288 (1): 14–29.
  • Applegate, D., and W. Cook. 1991. “A Computational Study of the Job-Shop Scheduling Problem.” ORSA Journal on Computing 3 (2): 149–156.
  • Balas, E. 1969. “Machine Sequencing Via Disjunctive Graphs: An Implicit Enumeration Algorithm.” Operations Research 17 (6): 941–957.
  • Balas, E., and A. Vazacopoulos. 1998. “Guided Local Search with Shifting Bottleneck for Job Shop Scheduling.” Management Science 44 (2): 262–275.
  • Caldeira, R. H., and A. Gnanavelbabu. 2019. “Solving the Flexible Job Shop Scheduling Problem Using an Improved Jaya Algorithm.” Computers & Industrial Engineering 137: 106064.
  • Cheng, T. C. E., B. Peng, and Z. Lü. 2016. “A Hybrid Evolutionary Algorithm to Solve the Job Shop Scheduling Problem.” Annals of Operations Research 242 (2): 223–237.
  • Dao, T. K., T. S. Pan, and J. S. Pan. 2018. “Parallel Bat Algorithm for Optimizing Makespan in Job Shop Scheduling Problems.” Journal of Intelligent Manufacturing 29 (2): 451–462.
  • Fisher, H., and G. L. Thompson. 1963. “Probabilistic Learning Combinations of Local Job-Shop Scheduling Rules.” In Industrial Scheduling, 225–251. Englewood Cliffs, NJ: Prentice-Hall.
  • Gong, G., R. Chiong, Q. Deng, and X. Gong. 2020a. “A Hybrid Artificial Bee Colony Algorithm for Flexible Job Shop Scheduling with Worker Flexibility.” International Journal of Production Research 58 (14): 4406–4420.
  • Gong, G., R. Chiong, Q. Deng, W. Han, L. Zhang, W. Lin, and K. Li. 2020b. “Energy-Efficient Flexible Flow Shop Scheduling with Worker Flexibility.” Expert Systems with Applications 141: 112902.
  • Kellerer, H., K. Rustogi, and V. A. Strusevich. 2020. “A Fast FPTAS for Single Machine Scheduling Problem of Minimizing Total Weighted Earliness and Tardiness About a Large Common Due Date.” Omega 90: 101992.
  • Kurdi, M. 2017. “An Improved Island Model Memetic Algorithm with a New Cooperation Phase for Multi-Objective Job Shop Scheduling Problem.” Computers & Industrial Engineering 111: 183–201.
  • Lawrence, S. 1984. Resource Constrained Project Scheduling: An Experimental Investigation of Heuristic Scheduling Techniques. Pittsburgh, PA: Graduate School of Industrial Administration, Carnegie-Mellon University.
  • Lenstra, J. K., A. R. Kan, and P. Brucker. 1977. “Complexity of Machine Scheduling Problems.” Annals of Discrete Mathematics 1: 343–362.
  • Li, J. Q., Q. K. Pan, and J. Chen. 2012. “A Hybrid Pareto-Based Local Search Algorithm for Multi-Objective Flexible Job Shop Scheduling Problems.” International Journal of Production Research 50 (4): 1063–1078.
  • Nagata, Y., and I. Ono. 2018. “A Guided Local Search with Iterative Ejections of Bottleneck Operations for the Job Shop Scheduling Problem.” Computers & Operations Research 90: 60–71.
  • Nowicki, E., and C. Smutnicki. 1996. “A Fast Taboo Search Algorithm for the Job Shop Problem.” Management Science 42 (6): 797–813.
  • Nowicki, E., and C. Smutnicki. 2002. Some New Tools to Solve the Job Shop Problem. Technical Report 60/2002. Wroclaw, Poland: Institute of Engineering Cybernetics, Technical University of Wroclaw.
  • Nowicki, E., and C. Smutnicki. 2005. “An Advanced Tabu Search Algorithm for the Job Shop Problem.” Journal of Scheduling 8 (2): 145–159.
  • Peng, B., Z. Lü, and T. E. C. Cheng. 2015. “A Tabu Search/Path Relinking Algorithm to Solve the Job Shop Scheduling Problem.” Computers & Operations Research 53: 154–164.
  • Qin, H., P. Fan, H. Tang, P. Huang, B. Fang, and S. Pan. 2019. “An Effective Hybrid Discrete Grey Wolf Optimizer for the Casting Production Scheduling Problem with Multi-Objective and Multi-Constraint.” Computers & Industrial Engineering 128: 458–476.
  • Storer, R. H., S. D. Wu, and R. Vaccari. 1992. “New Search Spaces for Sequencing Problems with Application to Job Shop Scheduling.” Management Science 38 (10): 1495–1509.
  • Taillard, E. 1993. “Benchmarks for Basic Scheduling Problems.” European Journal of Operational Research 64 (2): 278–285.
  • Taillard, E. D. 1994. “Parallel Taboo Search Techniques for the Job Shop Scheduling Problem.” ORSA Journal on Computing 6 (2): 108–117.
  • Tang, H., R. Chen, Y. Li, Z. Peng, S. Guo, and Y. Du. 2019. “Flexible Job-Shop Scheduling with Tolerated Time Interval and Limited Starting Time Interval Based on Hybrid Discrete PSO-SA: An Application from a Casting Workshop.” Applied Soft Computing 78: 176–194.
  • Ten Eikelder, H. M. M., B. J. M. Aarts, M. G. A. Verhoeven, and E. H. L. Aarts. 1999. “Sequential and Paralled Local Search Algorithms for Job Shop Scheduling.” In Meta-Heuristic: Advances and Trends in Local Search Paradigms for Optimization, edited by S. Voss, S. Martello, I. H. Osman, and C. Roucairol, 359–371. Massachusetts: Kluwer Academic Publishers.
  • Zhang, C., P. Li, Z. Guan, and Y. Rao. 2007. “A Tabu Search Algorithm with a New Neighborhood Structure for the Job Shop Scheduling Problem.” Computers & Operations Research 34 (11): 3229–3242.
  • Zhao, F., X. He, and L. Wang. 2020. “A Two-Stage Cooperative Evolutionary Algorithm with Problem-Specific Knowledge for Energy-Efficient Scheduling of No-Wait Flow-Shop Problem.” IEEE Transactions on Cybernetics 51 (11): 5291–5303.
  • Zhao, F., R. Ma, and L. Wang. 2021. “A Self-Learning Discrete Jaya Algorithm for Multiobjective Energy-Efficient Distributed No-Idle Flow-Shop Scheduling Problem in Heterogeneous Factory System.” IEEE Transactions on Cybernetics. doi:10.1109/TCYB.2021.3086181.
  • Zheng, X., S. Zhou, R. Xu, and H. Chen. 2020. “Energy-Efficient Scheduling for Multi-Objective Two-Stage Flow Shop Using a Hybrid Ant Colony Optimisation Algorithm.” International Journal of Production Research 58 (13): 4103–4120.
  • Zhou, S., L. Xing, X. Zheng, N. Du, L. Wang, and Q. Zhang. 2019. “A Self-Adaptive Differential Evolution Algorithm for Scheduling a Single Batch-Processing Machine with Arbitrary Job Sizes and Release Times.” IEEE Transactions on Cybernetics 51 (3): 1430–1442.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.