References
- Alves M. J., and C. H. Antunes. 2018. “A Semivectorial Bilevel Programming Approach to Optimize Electricity Dynamic Time-of-Use Retail Pricing.” Computers and Operations Research 2: 1–29.
- Amaldass, N., C. Lucas, and N. Mladenovic. 2017. “A Heuristic Hybrid Framework for Vector Job Scheduling.” Yugoslav Journal of Operations Research 27: 31–45.
- Bernardo, A., F. José, and A. Maria. 2008. “Production Planning and Scheduling in the Glass Container Industry: A VNS Approach.” International Journal of Production Economics 114 (1): 363–375.
- Bert, D. R., and L. Roel. 2008. “R&D Project Scheduling When activities May Fail.” IIE Transactions 40 (4): 367–384.
- Boussaïd, I., J. Lepagnot, and P. Siarry. 2013. “A Survey on Optimization Metaheuristics.” Information Sciences 237: 82–117.
- Certa, A., M. Enea, G. Galanteand, and C. M. L. Fata. 2009. “Multi-Objective Human Resources Allocation in R&D Projects Planning.” International Journal of Production Research 47 (13): 3503–3523.
- Chen, Jian., G. Q. Huang, and J. Q. Wang. 2019. “Synchronized Scheduling of Production and Outbound Shipping Using Bilevel-Based Simulated Annealing Algorithm.” Computers & Industrial Engineering 137: 106050.
- Chen, L.-H., and C.-H. Hung. 2010. “An Integrated Fuzzy Approach for the Selection of Outsourcing Manufacturing Partners in Pharmaceutical R&D.” International Journal of Production Research 48 (24): 7483–7506.
- Djenic, A., N. Radojicic, M. Maric, and M. Mladenovic. 2014. “Parallel VNS for Bus Terminal Location Problem.” Applied Soft Computing 42: 448–458.
- Dupin, R., A. Michiorri, and G. Kariniotakis. 2019. “Optimal Dynamic Line Rating Forecasts Selection Based on Ampacity Probabilistic Forecasting and Network Operators’ Risk Aversion.” IEEE Transactions on Power Systems 34 (4): 2836–2845.
- Fahim, A., and A. R. Hedar. 2017. “Filter-Based Genetic Algorithm for Mixed Variable Programming.” Numerical Algebra: Control and Optimisation 1 (1): 99–116.
- George, Q. H., and L. Haili. 2009. “A Bilevel Programming Approach to Assembly Job Shop Scheduling.” International Conference on Computers & Industrial Engineering.
- Glover, F., D. Hanafi, O. Guemri, and I. Crevits. 2018. “A Simple Multi-Wave Algorithm for the Uncapacitated Facility Location Problem.” Frontiers of Engineering Management 5 (4): 451–465.
- Guilherme A. B. M., and C. L. Rafael. 2017. “R&D Projects Selection in Telecommunications Under Uncertainty and Resource Restrictions Using Scheduling.” IEEE International Conference on Communications.
- Guo, Z. X., D. Q. Zhang, S. Leung, and L. Y. Shi. 2016. “A Bi-Level Evolutionary Optimization Approach for Integrated Production and Transportation Scheduling.” Applied Soft Computing 42: 215–228.
- Hanafi, S., J. Lazic, N. Mladenovic, C. Wilbaut, and I. Crevits. 2015. “New Variable Neighbourhood Search Based 0-1 MIP Heuristics.” Journal of Operations Research 25: 343–360.
- Hartmann, S., and D. Briskorn. 2010. “A Survey of Variants and Extensions of the Resource-Constrained Project Scheduling Problem.” European Journal of operational research 207 (1): 1–14.
- Hartmann, S., and D. Briskorn. 2022. “An Updated Survey of Variants and Extensions of the Resource-Constrained Project Scheduling Problem.” European Journal of Operational Research 297 (1): 1–14.
- Issa, S., and Y. Tu. 2020. “A Survey in the Resource-Constrained Project and Multi-Project Scheduling Problems.” Journal of Project Management 5 (2): 117–138.
- Jarboui, B., M. Eddaly, and P. Siarry. 2011. “A Hybrid Genetic Algorithm for Solving No-Wait Flowshop Scheduling Problems.” The International Journal of Advanced Manufacturing Technology 54 (9): 1129–43.
- Jensen, T. V., J. Kazempour, and P. Pinson. 2018. “Cost-Optimal ATCs in Zonal Electricity Markets.” IEEE Transactions on Power Systems 33 (4): 3624–3633.
- Joseph, A., and O. Y. Ozaltin. 2018. “Feature selection for classification models via bilevel optimization.” Computers and Operations Research 5 (5): 1–32.
- Kovacevic, D., N. Mladenovic, B. Petrovic, and P. Milosevic. 2014. “DE-VNS: Self-Adaptive Differential Evolution With Crossover Neighborhood Search for Continuous Global Optimization.” Computers & Operations Research 52: 157–169.
- Lenstra, J., A. Rinnooy, and P. Brucker. 1977. “Complexity of Machine Scheduling Problems.” Journal of Scheduling 1: 343–362.
- Li, S. 2014. “Optimal Control of Production-Maintenance System With Deteriorating Items, Emission Tax and Pollution R&D Investment.” International Journal of Production Research 52 (6): 1787–1807.
- Li, Y., A. He, C. Wang, and L. Shang. 2019. RAN-PSO: Random Apollonian Network embedded Partical Swarm Optimization Method. IEEE Symposium Series on Computational Intelligence, 1786–1792.
- Liu, Q. H., X. Y. Li, and L. Gao. 2021. “A Novel MILP Model Based on the Topology of a Network Graph for Process Planning in an Intelligent Manufacturing System.” ” Engineering 7 (6): 807–817.
- Mahmoudzadeh, S., D. Powers, A. Yazdani, K. Sammut, and A. Atyabi. 2018. “Efficient AUV Path Planning in Time-Variant Underwater Environment Using Differential Evolution Algorithm.” Journal of Marine Science and Application 17 (4): 585–591.
- Mladenović, N., and P. Hansen. 1997. “Variable Neighborhood Search.” Computers and Operations Research 24 (11): 1097–1100.
- Mladenovic, N., R. Todosijevic, and D. Urosevic. 2016. “Less Is More: Basic Variable Neighborhood Search for Minimum Differential Dispersion Problem.” Information Sciences 326: 160–171.
- Moradi, H., and S. Shadrokh. 2019. “A Robust Scheduling for the Multi-Mode Project Scheduling Problem with a Given Due Date Under Uncertainty of Activity Duration.” International Journal of Production Research 57 (10): 3138–3167.
- Niu, Y., J. Wang, and N. Yin. 2015. “Scheduling Problems with Effects of Deterioration and Truncated Job-Dependent Learning.” Journal of Applied Mathematic and Computing 47: 315–325.
- Pei, J., Z. Darzic, M. Drazic, N. Mladenovic, and P. Pardalos. 2019. “Continuous Variable Neighborhood Search (C-VNS) for Solving Systems of Nonlinear Equations.” INFORMS Journal on Computing 31: 235–250.
- Roshanaei, V., B. Naderi, F. Jolai, and M. Khalili. 2009. “A Variable Neighborhood Search for Job Shop Scheduling With Set-Up Times to Minimize Makespan.” Future Generation Computer Systems 25 (6): 654–661.
- Shuo, L., W. H. Chen, and J. Liu. 2016. “Robust Assignment of Airport Gates With Operational Safety Constraints.” International Journal of Automation and Computing 13 (01): 31–41.
- Sinha, A., P. Malo, and K. Deb. 2017. “A Review on Bilevel Optimisation: From Classical to Evolutionary Approaches and Applications.” IEEE Transactions on Evolutionary Computation 22 (2): 276–295.
- Son, S., Y. Jeong, and B. Lee. 2019. “An Optimal Driving Support Strategy (ODSS) for Autonomous Vehicles based on an Genetic Algorithm.” KSII Transactions on Internet and Information Systems 13 (12): 5842–5861.
- Tang, L., and Y. Meng. 2021. “Data analytics and optimization for smart industry.” Frontiers of Engineering Management 8: 157–171.
- Vallada, E., and R. Ruiz. 2011. “A Genetic Algorithm for the Unrelated Parallel Machine Scheduling Problem With Sequence Dependent Setup Times.” European Journal of Operational Research 211 (3): 612–622.
- Van P., V, and V. Mario. 2014. “An Experimental Investigation of Metaheuristics for the Multimode Resource-Constrained Project Scheduling Problem on New Dataset Instances.” European Journal of Operational Research 235 (1): 62–72.
- Vicente, L., G. Savard, and J. Júdice. 1994. “Descent Approaches for Quadratic Bilevel Programming.” Journal of Optimization Theory and Applications 81 (2): 379–399.
- Wu, Y., G. Jia, and Y. Cheng. 2020. “Cloud Manufacturing Service Composition and Optimal Selection with Sustainability Considerations: A Multi-Objective Integer Bi-Level Multi-Follower Programming Approach.” International Journal of Production Research 58 (19): 6024–6042.
- Xiao, Q, B. Niu, and Y. Chen. 2021. “Policy Manifold Generation for Multitask Multi-Objective Optimization of Energy Flexible Machining Systems.” IISE Transactions 54 (5): 448–463. doi:10.1080/24725854.2021.1934756.
- Yali, Y. 2018. “A Research on Multi-Project Human Resource Scheduling in R&D Enterprises—A Hyper-Heuristic Algorithm Based on Ant Colony Optimization.” Industrial Engineering Journal 21 (4): 104–109.
- Yang, S., J. Wang, L. Shi, Y. Tan, and F. Qiao. 2018. “Engineering Management for High-End Equipment Intelligent Manufacturing.” Frontiers of Engineering Management 5 (4): 420–450.
- Zhu, X., and P. Guo. 2020. “Bilevel Programming Approaches to Production Planning for Multiple Products With Short Life Cycles.” 4OR 18: 151–175.