477
Views
4
CrossRef citations to date
0
Altmetric
Research Articles

A station crashing-based recursive approach for disassembly line balancing problem in the presence of task failure

ORCID Icon, , &
Pages 5659-5675 | Received 11 Jan 2022, Accepted 14 Jul 2022, Published online: 18 Aug 2022

References

  • Alamerew, Y. A., and D. Brissaud. 2018. “Circular Economy Assessment Tool for End-of-Life Product Recovery Strategies.” Journal of Remanufacturing 9 (3): 169–185. doi:10.1007/s13243-018-0064-8.
  • Altekin, F. T., and C. Akkan. 2012. “Task-Failure-Driven Rebalancing of Disassembly Lines.” International Journal of Production Research 50 (18): 4955–4976. doi:10.1080/00207543.2011.616915.
  • Altekin, F. T., L. Kandiller, and N. E. Ozdemirel. 2008. “Profit-oriented Disassembly-Line Balancing.” International Journal of Production Research 46 (10): 2675–2693. doi:10.1080/00207540601137207.
  • Bentaha, M. L., O. Battaiä, and A. Dolgui. 2015. “An Exact Solution Approach for Disassembly Line Balancing Problem under Uncertainty of the Task Processing Times.” International Journal of Production Research 53 (6): 1807–1818. doi:10.1080/00207543.2014.961212.
  • Cui, H., and C. G. Anderson. 2016. “Literature Review of Hydrometallurgical Recycling of Printed Circuit Boards (PCBs).” Journal of Advanced Chemical Engineering 6 (1): 142–153. doi:10.4172/2090-4568.1000142.
  • Deniz, N., and F. Ozcelik. 2019. “An Extended Review on Disassembly Line Balancing with Bibliometric & Social Network and Future Study Realization Analysis.” Journal of Cleaner Production 225: 697–715. doi:10.1016/j.jclepro.2019.03.188.
  • Goksoy Kalaycilar, E., S. Batun, and M. Azizoğlu. 2021. “A Stochastic Programming Approach for the Disassembly Line Balancing with Hazardous Task Failures.” International Journal of Production Research 60 (10): 3237–3262. doi:10.1080/00207543.2021.1916119.
  • Gulivindala, A. K., M. R. Bahubalendruni, S. P. Varupala, and C. Ravi. 2021. “Exponential Moving Average Modelled Particle Swarm Optimization Algorithm for Efficient Disassembly Sequence Planning Towards Practical Feasibility.” International Journal of Performability Engineering 17 (3): 289. doi:10.23940/ijpe.21.03.p4.289298.
  • Gungor, A., and S. M. Gupta. 2001. “A Solution Approach to the Disassembly Line Balancing Problem in the Presence of Task Failures.” International Journal of Production Research 39 (7): 1427–1467. doi:10.1080/00207540110052157.
  • Güngör, A., and S. M. Gupta. 2002. “Disassembly Line in Product Recovery.” International Journal of Production Research 40 (11): 2569–2589. doi:10.1080/00207540210135622.
  • Guo, H., L. Zhang, Y. Ren, Y. Li, Z. Zhou, and J. Wu. 2022. “Optimizing a Stochastic Disassembly Line Balancing Problem with Task Failure via a Hybrid Variable Neighborhood Descent-Artificial Bee Colony Algorithm.” International Journal of Production Research, 1–15. doi:10.1080/00207543.2022.2069524.
  • Jia, L., and W. Shuwei. 2017. “A Proposed Multi-Objective Optimization Model for Sequence-Dependent Disassembly line Balancing Problem.” 2017 3rd International Conference on Information Management, ICIM 2017, 421–425. doi:10.1109/INFOMAN.2017.7950420.
  • Kalayci, C. B., and S. M. Gupta. 2013. “A Particle Swarm Optimization Algorithm with Neighborhood-Based Mutation for Sequence-Dependent Disassembly Line Balancing Problem.” The International Journal of Advanced Manufacturing Technology 69 (1): 197–209. doi:10.1007/s00170-013-4990-1.
  • Kalayci, C. B., and S. M. Gupta. 2014. “A Tabu Search Algorithm for Balancing a Sequence-Dependent Disassembly Line.” Production Planning and Control 25 (2): 149–160. doi:10.1080/09537287.2013.782949.
  • Koc, A., I. Sabuncuoglu, and E. Erel. 2009. “Two Exact Formulations for Disassembly Line Balancing Problems with Task Precedence Diagram Construction Using an AND/OR Graph.” IIE Transactions (Institute of Industrial Engineers) 41 (10): 866–881. doi:10.1080/07408170802510390.
  • Laili, Y., X. Li, Y. Wang, L. Ren, and X. Wang. 2021. “Robotic Disassembly Sequence Planning with Backup Actions.” in IEEE Transactions on Automation Science and Engineering 19 (3): 2095–2107. doi:10.1109/TASE.2021.3072663.
  • Laili, Y., F. Tao, D. T. Pham, Y. Wang, and L. Zhang. 2019. “Robotic Disassembly Re-Planning Using a Two-Pointer Detection Strategy and a Super-Fast Bees Algorithm.” Robotics and Computer-Integrated Manufacturing 59: 130–142. doi:10.1016/j.rcim.2019.04.003.
  • Lambert, A. J. D. 1999. “Linear Programming in Disassembly/Clustering Sequence Generation.” Computers and Industrial Engineering 36 (4): 723–738. doi:10.1016/S0360-8352(99)00162-X.
  • Li, Zixiang, Mukund Nilakantan Janardhanan, and Humyun Fuad Rahman. 2021. “Enhanced Beam Search Heuristic for U-Shaped Assembly Line Balancing Problems.” Engineering Optimization 53 (4): 594–608. doi:10.1080/0305215X.2020.1741569.
  • McGovern, S. M., and S. M. Gupta. 2007. “Combinatorial Optimization Analysis of the Unary NP-Complete Disassembly Line Balancing Problem.” International Journal of Production Research 45 (18–19): 4485–4511. doi:10.1080/00207540701476281.
  • Meng, K., P. Lou, X. Peng, and V. Prybutok. 2017. “Multi-Objective Optimization Decision-Making of Quality Dependent Product Recovery for Sustainability.” International Journal of Production Economics 188 (March): 72–85. doi:10.1016/j.ijpe.2017.03.017.
  • Mete, S., Z. A. Çil, E. Özceylan, K. Ağpak, and O. Battaïa. 2018. “An Optimisation Support for the Design of Hybrid Production Lines Including Assembly and Disassembly Tasks.” International Journal of Production Research 56 (24): 7375–7389. doi:10.1080/00207543.2018.1428774.
  • Ong, S. K., M. M. L. Chang, and A. Y. C. Nee. 2021. “Product Disassembly Sequence Planning: State-of-the-Art, Challenges, Opportunities and Future Directions.” International Journal of Production Research 0 (0): 1–16. doi:10.1080/00207543.2020.1868598.
  • Özceylan, E., T. Paksoy, and T. Bektaş. 2014. “Modeling and Optimizing the Integrated Problem of Closed-Loop Supply Chain Network Design and Disassembly Line Balancing.” Transportation Research Part E: Logistics and Transportation Review 61: 142–164. doi:10.1016/j.tre.2013.11.001.
  • Polat, O., C. B. Kalayci, Ö Mutlu, and S. M. Gupta. 2016. “A Two-Phase Variable Neighbourhood Search Algorithm for Assembly Line Worker Assignment and Balancing Problem Type-II: An Industrial Case Study.” International Journal of Production Research 54 (3): 722–741. doi:10.1080/00207543.2015.1055344.
  • Rahimi-Vahed, A. R., S. M. Mirghorbani, and M. Rabbani. 2007. “A Hybrid Multi-Objective Particle Swarm Algorithm for a Mixed-Model Assembly Line Sequencing Problem.” Engineering Optimization 39 (8): 877–898. doi:10.1080/03052150701512042.
  • Ren, Y., D. Yu, C. Zhang, G. Tian, L. Meng, and X. Zhou. 2017. “An Improved Gravitational Search Algorithm for Profit-Oriented Partial Disassembly Line Balancing Problem.” International Journal of Production Research 55 (24): 7302–7316. doi:10.1080/00207543.2017.1341066.
  • Seidi, M., and S. Saghari. 2016, December 30. “The Balancing of Disassembly Line of Automobile Engine Using Genetic Algorithm (GA) in Fuzzy Environment.” Industrial Engineering and Management Systems 15 (4): 364–373. doi:10.7232/iems.2016.15.4.364.
  • Singh, R. K., A. R. Singh, and R. K. Yadav. 2021, September. Disassembly Line Balancing Using Recursive Optimization in Presence of Task-Failure. In IFIP International Conference on Advances in Production Management Systems (pp. 430–440). Springer, Cham. doi:10.1007/978-3-030-85906-0_48.
  • Wang, Y., F. Lan, J. Liu, J. Huang, S. Su, C. Ji, Duc Truong Pham, Wenjun Xu, Zude Zhou, and Z. Zhou. 2021. “Interlocking Problems in Disassembly Sequence Planning.” International Journal of Production Research 59 (15): 4723–4735. doi:10.1080/00207543.2020.1770892.
  • Wang, K., X. Li, L. Gao, P. Li, and J. W. Sutherland. 2021. “A Discrete Artificial Bee Colony Algorithm for Multiobjective Disassembly Line Balancing of End-of-Life Products.” in IEEE Transactions on Cybernetics 52 (8): 7415–7426. doi:10.1109/TCYB.2020.3042896.
  • White, C. D., E. Masanet, C. M. Rosen, and S. L. Beckman. 2003. “Product Recovery with Some Byte: An Overview of Management Challenges and Environmental Consequences in Reverse Manufacturing for the Computer Industry.” Journal of Cleaner Production 11 (4): 445–458. doi:10.1016/S0959-6526(02)00066-5.
  • White, C., E. Masanet, C. Rosen, S. Beckman, R. V. Rao, V. J. Savsani, D. P. Vakharia, et al. 2017. “An Optimisation Support for the Design of Hybrid Production Lines Including Assembly and Disassembly Tasks.” International Journal of Production Research 41 (3): 421–425. doi:10.1109/INFOMAN.2017.7950420.
  • Xu, C., H. Wei, X. Guo, S. Liu, L. Qi, and Z. Zhao. 2020. “Human-Robot Collaboration Multi-Objective Disassembly Line Balancing Subject to Task Failure via Multi-Objective Artificial Bee Colony Algorithm.” IFAC-PapersOnLine 53 (5): 1–6. doi:10.1016/j.ifacol.2021.04.076.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.