Project acceleration using temporary workers with heterogeneous efficiency: optimal and best recruitment policies

Pages 6102-6119 | Received 20 Oct 2023, Accepted 11 Jan 2024, Published online: 31 Jan 2024

References

  • Afshar-Nadjafi, B. 2021. “Multi-skilling in Scheduling Problems: A Review on Models, Methods and Applications.” Computers and Industrial Engineering 151:107004. https://doi.org/10.1016/j.cie.2020.107004
  • Almeida, B. F., I. Correia, and F. Saldanha-da-Gama. 2019. “Modeling Frameworks for the Multi-skill Resource-constrained Project Scheduling Problem: a Theoretical and Empirical Comparison.” International Transactions in Operational Research 26 (3): 946–967. https://doi.org/10.1111/itor.2019.26.issue-3
  • Argote, L., and D. Epple. 1990. “Learning Curves in Manufacturing.” Science 247 (4945): 920–924. https://doi.org/10.1126/science.247.4945.920
  • Arrow, K. J. 1962. “The Economic Implications of Learning by Doing.” Review of Economic Studies 29 (3): 155–173. https://doi.org/10.2307/2295952
  • Beckers, D. G. J., D. van der Linden, P. G. W. Smulders, M. A. J. Kompier, M. J. P. Van Veldhoven, and N. W. Van Yperen. 2004. “Working Overtime Hours: Relations with Fatigue, Work Motivation, and the Quality of Work.” Journal of Occupational and Environmental Medicine 46 (12): 1282–1289. https://doi.org/10.1097/01.jom.0000147210.95602.50.
  • Broschak, J. P., and A. Davis-Blake. 2006. “Mixing Standard Work and Nonstandard Deals: the Consequences of Heterogeneity in Employment Arrangements.” Academy of Management Journal 49 (2): 371–393. https://doi.org/10.5465/amj.2006.20786085
  • Brucker, P., A. Drexl, R. Möhring, K. Neumann, and E. Pesch. 1999. “Resource-constrained Project Scheduling: Notation, Classification, Models, and Methods.” European Journal of Operational Research112 (1): 3–41. https://doi.org/10.1016/S0377-2217(98)00204-5
  • Chen, P.-H., and H. Weng. 2009. “A Two-phase GA Model for Resource-constrained Project Scheduling.” Automation in Construction 18 (4): 485–498. https://doi.org/10.1016/j.autcon.2008.11.003
  • Correia, I., L. L. Lourenço, and F. Saldanha-da-Gama. 2012. “Project Scheduling with Flexible Resources: Formulation and Inequalities.” OR Spectrum 34 (3): 635–663. https://doi.org/10.1007/s00291-010-0233-0
  • Daveri, F., and M. Maliranta. 2007. “Age, Seniority and Labour Costs: Lessons From the Finnish IT Revolution.” Economic Policy 22 (49): 118–175. https://doi.org/10.1111/j.1468-0327.2007.00175.x
  • García, A., and M. Gomez. 2014. “A Multi-Objective Genetic Algorithm for the Software Project Scheduling Problem.” In 13th Mexican International Conference on Artificial Intelligence, 13–24. Springer.
  • Glock, C. H., E. H. Grosse, M. Y. Jaber, and T. L. Smunt. 2019. “Applications of Learning Curves in Production and Operations Management: A Systematic Literature Review.” Computers and Industrial Engineering 131 (C): 422–441. https://doi.org/10.1016/j.cie.2018.10.030.
  • Gomar, J. E., C. T. Haas, and D. P. Morton. 2002. “Assignment and Allocation Optimization of Partially Multiskilled Workforce.” Journal of Construction Engineering and Management 128 (2): 103–109. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:2(103)
  • Gunduz, M. 2004. “A Quantitative Approach for Evaluation of Negative Impact of Overmanning on Electrical and Mechanical Projects.” Building and Environment 39 (5): 581–587. https://doi.org/10.1016/j.buildenv.2003.11.006
  • Gutjahr, W. J., S. Katzensteiner, P. Reiter, C. Stummer, and M. Denk. 2010. “Multi-objective Decision Analysis for Competence-oriented Project Portfolio Selection.” European Journal of Operational Research 205 (3): 670–679. https://doi.org/10.1016/j.ejor.2010.01.041
  • Hanna, A. S., and K. T. Sullivan. 2004. “Impact of Overtime on Construction Labor Productivity.” Cost Engineering 46 (4): 20–27.
  • Hartmann, S., and D. Briskorn. 2022. “An Updated Survey of Variants and Extensions of the Resource-constrained Project Scheduling Problem.” European Journal of Operational Research 297 (1): 1–14. https://doi.org/10.1016/j.ejor.2021.05.004
  • Heimerl, C., and R. Kolisch. 2010a. “Scheduling and Staffing Multiple Projects with a Multi-skilled Workforce.” OR Spectrum 32 (2): 343–368. https://doi.org/10.1007/s00291-009-0169-4
  • Heimerl, C., and R. Kolisch. 2010b. “Work Assignment to and Qualification of Multi-skilled Human Resources Under Knowledge Depreciation and Company Skill Level Targets.” International Journal of Production Research 48 (13): 3759–3781. https://doi.org/10.1080/00207540902852785
  • Jeunet, J., and M. Bou Orm. 2020. “Optimizing Temporary Work and Overtime in the Time Cost Quality Trade-off Problem.” European Journal of Operational Research 284 (2): 743–761. https://doi.org/10.1016/j.ejor.2020.01.013
  • Kim, J. Y., C. W. Kang, and I. Hwang. 2012. “A Practical Approach to Project Scheduling: Considering the Potential Quality Loss Cost in the Time-cost Tradeoff Problem.” International Journal of Project Management 30 (2): 264–272. https://doi.org/10.1016/j.ijproman.2011.05.004
  • Kolisch, R., and C. Heimerl. 2012. “An Efficient Metaheuristic for Integrated Scheduling and Staffing it Projects Based on a Generalized Minimum Cost Flow Network.” Naval Research Logistics 59 (2): 111–127. https://doi.org/10.1002/nav.v59.2
  • Li, H., P. E. D. Love, and D. S. Drew. 2000. “Effects of Overtime Work and Additional Resources on Project Cost and Quality.” Engineering, Construction and Architectural Management 7 (3): 211–220. https://doi.org/10.1108/eb021146
  • Mahmud, A. 2015. “Effects of Worker Fatigue on Product Quality: a Case Study in Apparel Industry.” International Journal of Scientific and Engineering Research 6 (5): 1625–1627. https://doi.org/10.14299/000000
  • Mansfield, R. S. 1996. “Building Competency Models: Approaches for HR Professionals.” Human Resource Management 35 (1): 7–18. https://doi.org/10.1002/(ISSN)1099-050X
  • Maranto, C. L., and R. C. Rodgers. 1984. “Does Work Experience Increase Productivity? A Test of the on-the-job Training Hypothesis.” The Journal of Human Resources 19 (3): 341–357. https://doi.org/10.2307/145877
  • Mohammadipour, F., and S. J. Sadjadi. 2016. “Project Cost-quality-risk Tradeoff Analysis in a Time-constrained Problem.” Computers and Industrial Engineering 95:111–121. https://doi.org/10.1016/j.cie.2016.02.025
  • Montoya, C., O. Bellenguez-Morineau, E. Pinson, and D. Rivreau. 2014. “Branch-and-price Approach for the Multi-skill Project Scheduling Problem.” Optimization Letters 8 (5): 1721–1734. https://doi.org/10.1007/s11590-013-0692-8
  • Naber, A., and R. Kolisch. 2014. “MIP Models for Resource-constrained Project Scheduling with Flexible Resource Profiles.” European Journal of Operational Research 239 (2): 335–348. https://doi.org/10.1016/j.ejor.2014.05.036
  • Sáenz-Royo, C., and V. Salas-Fumás. 2013. “Learning to Learn and Productivity Growth: Evidence From a New Car-assembly Plant.” Omega 41 (2): 336–344. https://doi.org/10.1016/j.omega.2012.03.010
  • Snauwaert, J., and M. Vanhoucke. 2021. “A New Algorithm for Resource-constrained Project Scheduling with Breadth and Depth of Skills.” European Journal of Operational Research 292 (1): 43–59. https://doi.org/10.1016/j.ejor.2020.10.032
  • Syverson, C 2011. “What Determines Productivity?” Journal of Economic Literature 49 (2): 326–365. https://doi.org/10.1257/jel.49.2.326
  • Tritschler, M., A. Naber, and R. Kolisch. 2017. “A Hybrid Metaheuristic for Resource-constrained Project Scheduling with Flexible Resource Profiles.” European Journal of Operational Research 262 (1): 262–273. https://doi.org/10.1016/j.ejor.2017.03.006
  • Valls, V., A. Perez, and S. Quintanilla. 2009. “Skilled Workforce Scheduling in Service Centres.” European Journal of Operational Research 193 (3): 791–804. https://doi.org/10.1016/j.ejor.2007.11.008
  • Van Den Eeckhout, M., B. Maenhout, and M. Vanhoucke. 2019. “A Heuristic Procedure to Solve the Project Staffing Problem with Discrete Time/resource Trade-offs and Personnel Scheduling Constraints.” Computers and Operations Research 101:144–161. https://doi.org/10.1016/j.cor.2018.09.008
  • Van Den Eeckhout, M., B. Maenhout, and M. Vanhoucke. 2020b. “Mode Generation Rules to Define Activity Flexibility for the Integrated Project Staffing Problem with Discrete Time/resource Trade-offs.” Annals of Operations Research 292 (1): 133–160. https://doi.org/10.1007/s10479-020-03619-3
  • Van Den Eeckhout, M., M. Vanhoucke, and B. Maenhout. 2020a. “A Decomposed Branch-and-price Procedure for Integrating Demand Planning in Personnel Staffing Problems.” European Journal of Operational Research 280 (3): 845–859. https://doi.org/10.1016/j.ejor.2019.07.069
  • Walter, M., and J. Zimmermann. 2016. “Minimizing Average Project Team Size Given Multi-skilled Workers with Heterogeneous Skill Levels.” Computers and Operations Research 70:163–179. https://doi.org/10.1016/j.cor.2015.11.011
  • Yelle, L. E. 1979. “The Learning Curve: Historical Review and Comprehensive Survey.” Decision Sciences 10 (2): 302–328. https://doi.org/10.1111/deci.1979.10.issue-2

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.