REFERENCES
- BAKER , K. R. , 1975 , A comparative study of flow-shop algorithms , Ops Res. , 23 , 62 .
- CAMPBELL , H. G. , DUDEK , R. A. , and SMITH , M. L. , 1970 , A heuristic algorithm for the n job, m machine sequencing problem , Mgmt Sci. 16 , B-630 .
- GELDERS , L. , and KLEINDORFER , P. R. , 1974 , Coordinating aggregate and detailed scheduling in the one-machine job shop.I. Theory, Ops Res. , 22 , 46 .
- GOLOVIN , J. J. , 1975 , Hierarchical integration of planning and control , Technical Report No. 116 Massachusetts (Operations Research Center, M.I.T.) .
- JOHNSON , S. M. , 1954 , Optimal two- and three-stage production schedules with set-up time included , Nav. Res. Logist. Q. , 1 , 61 .
- KRONE , M. J. , and STEIGLITZ , K. , 1974 , Heuristic-programming solution of a flow-shop-scheduling problem , Ops Res. , 22 , 629 .
- PALMER , D. S. , 1965 , Sequencing jobs through a multi-stage process in the minimum total time-a quick method of obtaining a near optimum , Opl Res. Q. , 16 , 101 .
- PANWALKAR , S. S. , DUDEK , R. A. , and SMITH , M. L. , 1973 , Sequencing research and the industrial scheduling problem , Symposium on the Theory of Scheduling and its Applications , edited by S. E. Elmaghraby ( Berlin Springer-Verlag ) .
- SAMBANDAM , N. , VAN WASSENHOVE , L. , and GELDERS , L. , 1977 , Coordinating aggregate and detailed scheduling in a flowshop , paper presented at the EURO/TIMS Meeting in Athens .
- VAN WASSENHOVE , L. , SAMBANDAM , N. , and GELDERS , L. , 1977 , Comparative evaluation of four solution techniques for solving complex scheduling problems , paper presented at the EURO/TIMS Meeting in Athens .