References
- AXSÄTKR , S. , 1976 , Coordinating control of production-inventory systems , Int. J. Prod. Res. , 14 , 669 ; 1979, Produktionsplanering och-styring (Lund Student-litteratur) .
- BOMBERGER , E. , 1966 , A dynamic programming approach to a lot size scheduling problem , Mgmt. Sci. , 12 , 778 .
- ELMAOHRABY , S. E. , 1978 , An extended basic period approach to the economic lot scheduling problem (ELSP) , in Production and Industrial Systems Future development and the role of industrial and production engineering , edited by R. Muramatsu and N. A. Dudley ( London Taylor & Francis ), pp. 649 – 662 .