References
- BUXEY , G. M. , 1974 , A guide to the selection of methods for high-volume assembly , Prod. Engr , 53 , 503 .
- BUXEY , G. M. , and SADJADI , D. , 1976 , Simulation studies of conveyor-paced assembly lines with buffer capacity , Int. J. Prod. Res. , 14 , 607 .
- ELSAYED , E. A. , and PROCTOR , C. L. , 1977 , Ordered entry and random choice conveyors withm multiple Poisson inputs , Int. J. Prod. Ren. , 15 , 439 .
- GREGORY . G. , and LITTON , C. D. , 1975 . A conveyor model with exponential service times , Int. J. Prod. Res. , 13 , 1 .
- JOHNSTON , J. , 1956 , A statistical analysis of one use of conveyors in industry , Work Study Ind. Engng . December . 67 .
- KILBRIDGE , M. D. , 1962 , A model fur industrial learning costs , Mgmt Sci. , 8 , 516 .
- H. B. MAYNAKD Co., 1975 , Production ( Maidenhead McGraw-Hill Ltd ).
- OWENS , J. J. , 1978 , A review of the benefits, constraints and operating limits of conveyor systems when applied to work design and unit build assembly . Unpublished M.Eng. Dissertation . University of Glasgow .
- SLACK . N. , 1972 . The Weibull distribution and ils use in destribimj service time distributions . Production Management Research Group Monograph Series 72/1 , ( University of Bradford ).
- TUGGLE , G. , 1960 , Job enlargement an assault on assemblv line inefficiency , Ind. Engng . 1 , 26 .
- WILD , R. , 1975 , Work Organisation ( London John Wiley & Sons ).