93
Views
93
CrossRef citations to date
0
Altmetric
Original Articles

Review of operator/machine interference models

&
Pages 129-151 | Received 01 Mar 1984, Published online: 24 Oct 2007

References

  • ACKERMANN , W. 1977 , Development of time standards for multi-machine assignments with random interference . Internal Publication , H. B. Maynard and Co., Inc .
  • ALLEN , A. O. 1978 , Probability, Statistics and Queueing Theory with Computer Science Applications ( New York Academic Press ).
  • ARONSHS , J. E. 1981 , Two graphical methods for determining a cyclic schedule for the single operator, multiple machine, multiple run problem . Technical Report OREM 81007, Department of Operations Research and Engineering Management , Southern Methodist University , Dallas , Texas 75275 .
  • ARONSON , J. E. 1984 , Two heuristics for the deterministic, single operator, multiple machine, multiple run cyclic scheduling problem , Journal of Operations Management , 4 , 159 .
  • ASHCROFT , H. 1950 , The productivity of several machines under the care of one operator . Journal of the Royal Statistical Society B , 12 , 145 .
  • BAKSHI , M. S. 1974 , Development of an on-line dynamic production scheduling system for efficient mufti-machine assignments in a job shop . Presented at the Joint ORSA/TIMS Conference , San Juan , Puerto Rico .
  • BEN-ISRAEL , A. , and NAOE , P. 1960 , A problem of delayed service , I, II , Journal of the Royal Statistical Society B , 22 , 245 .
  • BENSON , F. 1957 , Machine interference—A mathematical study of some congestion problems in industry . Unpublished Ph.D. Thesis , University of Birmingham , England .
  • BENSON , F. , and Cox , D. R. 1951 , The productivity of machines requiring attention at random intervals , Journal of the Royal Statistical Society B , 13 , 65 .
  • BENSON , F. , MILLER , J. G. , and TOWNSEND , M. W. H. 1953 , Machine interference , Journal of the Textile Institute , 44 , 619 .
  • BERRY , K. R. 1968 , Work measurement in multiple machine assignments , Journal of Industrial Engineering , 19 , 17 .
  • BBERNSTEIN, PHILIP, 1941 , How many automatics should a man run , Factory Management and Maintenance , 99 .
  • BHAT , U. N. 1972 , Elements of Applied Stochastic Processes ( New York Johb Wiley and Sons ).
  • BLOM , G. 1963 , Some contributions to the theory of machine interference , Biometrika , 50 , 135 .
  • BBKEDENBECK , J. E. , OODBN , M. G. , III , and TYLER , M. W. 1975 , ‘Optimum’ systems allocation Applications of simulation in an industrial environment, Proceedings of the Midwest AIDS Conference , 28 .
  • BUNDAY , B. D. ,MACK, C 1973 , The efficiency of bi-directionally traversed machines , Journal of the Royal Statistical Society C , 22 , 74 .
  • BUNDAY , B. D. , and SCRATON , R. E. 1980 , The G/M/r machine interference mode , European Journal of Operational Research , 4 , 399 .
  • BUROESS , A. R. 1962 , Comments on simulation in the application of wage incentives to multiple machines , Journal of Industrial Engineering , 13 , 264 .
  • BUZACOTT , J. A. 1982 , lsquo;Optimal’ operating rules for automated manufacturing systems , IEEE Transactions on Automatic Control , 27 , 80 .
  • CARPENITO , T. A. , and WHITE , J. A. 1976 , The allocation of non-indentical machines, among non-identical servers . International Journal of Production Research , 4 , 429 .
  • CAHSON, G. B., BOLZ, H. A., YOUNG, H. H.(eds.) 1972 , Production Handbook , 3rd edition ( New York The Ronald Press Co. ), 1277 – 1285 .
  • CHANDRA , M. J. , and SHANTHIKUMAR , J. G. 1983 , On a machine interference problem with several types of machines attended by a single repairman , International Journal of Production Research , 21 , 529 .
  • CONWAY , R. W. , MAXWELL , W. L. , and SAMPSON , H. W. 1962 , On the cyclic service of semi-automatic machines , Journal of Industrial Engineering , 13 , 105 .
  • Cox , D. R. , SMITH , W. L. 1961 , Queues ( New York John Wiley & Sons ).
  • DEAKIN , G. R. 1980 , Simulation/regression approach to machine interference. Unpublished report , Chemical & Industrial Engineering Management Services , Chester , Virginia .
  • DuBE , R. , and ELSAYED , E. A. 1979 , A multi-machine labor assignment for variable operator service times , Computers and Operations Research , 6 , 147 .
  • DUVALI , W. G. 1936 , Machine interference , Part II , Mechanical Engineering , 58 , 510 .
  • EILON , S. 1970 , Elements of Production Planning and Control ( New York The Macmillan Company ).
  • ELICANO , R. V. 1967 , How many helpers in a pool ? , American Machinist .
  • ELSAYED , E. A. 1981 , An optimum repair policy for the machine interference problem , Journal of the Operational Research Society , 32 , 793 .
  • ELSAYED , E. A. , and PROCTOR , C. L. 1979 , Two repair policies for a machine interference problem with two types of failures , Proceedings of the 10th Annual Modeling and Simulation Conference , Pittsburgh PA , 10 , 535 – 539 .
  • ENOELBEROEB , J. F. 1980 , Robotics in Practice ( New York Amacon ).
  • FELLER , W. 1968 , An Introduction to Probability Theory and its Applications , Vol. I , Third edition ( New York John Wiley & Sons ), 462 – 168 .
  • FETTER , R. B. 1955 , The assignment of operators to service automatic machines , Journal of Industrial Engineering , 6 , 22 .
  • FETTER , R. B. , and GALLIHER , H. P. 1958 , Waiting-line models in materials handling , Journal of Industrial Engineering , 9 , 202 .
  • FREEMAN , D. R. , HOOVER , S. V. , and SATIA , J. 1973 , Solving machine interference by simulation , Journal of Industrial Engineering , 5 , 32 .
  • GARCIA-DIAZ , A. , HOGG , G. L. , and TARI , F. G. 1981 , Combining simulation and optimization to solve the multimachine interference problem , Simulation , 193 .
  • GIFFIN , W. C. 1976 , Fork truck utilization another approach , Industrial Engineering , July, 26 .
  • GILLESPIE , W. P. , and WYSOWSKI , C. H. 1974 , Teamwork maintenance , Industrial Engineering , 6 , 26 .
  • GRANT , R. O. , JR. 1960 , A comparison between the random and the patrolled walk in the assignment of operators to automatic machines . M.S. Thesis , North Carolina Stale University , Raleigh , North Carolina .
  • GROSS , D. , and INCE , J. F. 1981 , The machine repair problem with heterogeneous populations , Operations Research , 20 , 532 .
  • HAAGENSON , G. E. 1970 , The determination of machine interference time through simulation , The Western Electric Engineer , 14 , 35 .
  • HAINES , I. L. , and ROSE , C. F. 1962 , Use of queueing theory in setting production standards . Journal of Industrial Engineering , 13 , 456 .
  • HILLIER , F. S. , and Yu , O. S. 1981 , Queueing Tables and Graphs ( New York North Holland ).
  • HODGSON , V. , and HEBBLE , T. L. 1967 , Nonpreemptive priorities in machine interference , Operations Research , 15 , 245 .
  • HOWIE , A. J. , and SHENTON , L. R. 1959 , The efficiency of automatic winding machines with constant patrolling time , Journal of the Royal Statistical Society B , 21 , 381 .
  • JAISWAI , N. K. 1961 , Preemptive resume priority queue . Operations Research , 9 , 732 .
  • JAISWAL , N. K. 1968 , Priority Queues ( New York Academic Press ).
  • JAISWAL , N. K. , and THIRUVENGADAM , K. 1963 , Simple machine interference with two types of failure , Operations Research , 11 , 624 .
  • JOHNSON , M. J. , and SMITH , S. S. 1961 , Simulation in the application of wage incentives to multiple machines , Journal of Industrial Engineering , 12 , 428 .
  • JONES , D. W. 1946 , A simple way to figure machine downtime . Factory Management and Maintenance , 104 , 118 .
  • JONES , D. W. 1949 , Mathematical and experimental calculation of machine interference time . The Research Engineer , Georgia Institute of Technology .
  • JONES , D. W. 1971 , Work measurement of multimachine assignments , 3.92 – 3.112 of Maynard, H. B., ed. , Industrial Engineering Handbook ( New York McGraw-Hill ).
  • KELLY , F. P. 1976 , Networks of queues , Advanced Applied Probability , 8 , 416 .
  • KELLY , F. P. 1979 , Reversibility and Stochastic Networks ( New York John Wiley & Sons ).
  • KHINTCHINE , A. Ja. 1933 , Uber der Mittiere Dauer des Stillstandes von Maschinen, or On mean time of stoppage of machines , Mathematiceski Sbornic , 40 , 119 .
  • KILLINOBACK , J. 1964 , Cyclic interference between two machines on different work , International Journal of Production Research , 3 , 115 .
  • KINO , J. R. , 1970 , On the optimal size of workforce engaged in the servicing of automatic machines , International Journal of Production Research , 8 , 207 .
  • KLEINROCK , L. 1976 , Queueing Systems, Vol. I and II ( New York John Wiley & Sons ).
  • KRONIG , R. , and MONDRIA , M. On time losses in machinery undergoing interruption , Part II , Physica , 10 , 331 .
  • LAWING , W. D. 1959 , A mathematical method for determining the optimum assignment of quill winders to a patrolling tender; M.S. Thesis , North Carolina State University , Raleigh , North Carolina .
  • MACK , C. , MURPHY , T. , and WEBB , N. L. 1957 , The efficiency of N machines unidirectionally patrolled by one operator when walking times and repair times are constants , Journal of the Royal Statistical Society B , 19 , 166 .
  • MACK , C. , and STOODLEY , K. D. C. 1968 , Machine interference with two repairmen when repair time is constant , New Journal of Statistics and Operations Research , 4 , 1 .
  • MALCOLM , D. G. 1955 , Queueing theory in organization design , Journal of Industrial Engineering , 8 , 19 .
  • MARITAS , D. G. , and XIROKOSTAS , D. A. 1977 , The M/E/r machine interference model , European Journal of Operational Research , 1 , 112 .
  • MAVNARD , H. B. ,Co., Inc. 1979 , Optimizing of bridge crane use by the interference method. Internal Report prepared for KONE Oy , Hyvinge , Finland .
  • MILLER , J. G. 1972 , The multiple machine labor assignment A combinatorial analysis . Unpublished Ph.D. dissertation , Krannert Graduate School of Industrial Administration , Purdue University , West Lafayette , IN 47907 .
  • MILLER , J. G. , and BERRY , W. L. 1974 , Heuristic methods for assigning men to machines An experimental analysis , AIIE Transactions , 6 , 97
  • MILLER , J. G. , and BERRY , W. L. 1977 , The assignment of men to machines An application of branch and bound . Decision Sciences , 8 , 56 .
  • MORSK , P. M. , 1962 , Queues, Inventories and Maintenance ( New York John Wiley & Sons ), 167 – 174 .
  • NAOR , P. 1956 , On machine interference , Journal of the Royal Statistical Society B , 18 , 280 .
  • NAOR , P. 1957 , Normal approximation to machine interference with many repair men , Journal of the Royal Statistical Society B , 19 , 334 .
  • NAOR , P. 1957 , Some problems of machine interference. Proceedings, First International Conference, Operations Research ( Oxford English University Press ).
  • NAOR , P. 1956 , On machine interference , Journal of the Royal Statistical Society B , 18 , 280 .
  • NAOR , P. 1957 , Normal approximation to machine interference with many repair men , Journal of the Royal Statistical Society B , 19 , 334 .
  • NAOR , P. 1957 , Some problems of machine interference, Proceedings, First International Conference, Operations Research ( Oxford English University Press ).
  • NIEBEL , B. W. 1976 , Motion and Time Study , 6th edition ( Homewood Richard D. Irwin, Inc. ), 382 – 385 .
  • O'CONNOR , T. F. 1952 a, Productivity and Probability ( Manchester Emmott and Co., Ltd ).
  • O'CONNOR , T. F. , 1952 b, An easy way to allow for machine interference , Textile World , December.
  • PALM , D. C. 1943 , Intensitatschwankungen in Fernsprechverkehr, or Analysis of the Erlang traffic formula for busy-signal arrangements , Ericsson Technics , 6 .
  • PALM , D. C. 1947 , Arbetskraftens Fordelning Vid Betjaning av Automatmaskiner, or The distribution of repairmen in servicing automatic machines , Industritidningen Norden , 75 , 75 – 80 , 90 – 94 , and 119 – 125 .
  • PALM , D. C. 1958 , The assignment of workers in servicing automatic machines , Journal of Industrial Engineering , 9 , 28 .
  • PECK , L. C. , and HAZELWOOD , R. N. 1958 , Finite Queueing Tables ( New York John Wiley & Sons ).
  • REYNOLDS , G. H. 1969 , An M/M/c queue for the distance priority machine interference problem . Operations Research Centre Report 69 – 35 , University of California , Berkeley .
  • REYNOLDS , G. H. 1975 , An M/M/m/n queue for the shortest distance priority machine interference problem . Operations Research , 23 , 325 .
  • SKEITH , R. , CURRY , G. , and HAIRSTON , D. 1969 , Simulation checks problem of machine interference , Industrial Engineering , May, 22 .
  • SMITH , J. T. 1965 , Machine interference and related problems , Work Study , 14 , Nos. 6–10, pp. 9–16, 21–28, 28–36, 25–34, and 25–32, respectively .
  • STECKB , K. E. 1982 , Machine interference The assignment of machines to operators , in the Handbook of Industrial Engineering , edited by Gavriel Salvendy ( New York John Wiley & Sons ).
  • STECKE , K. E. , and SOLBERG , J. J. 1977 , Scheduling of operations in a computerized manufacturing system . Report No. 10, NSF Grant No. APR74 15256 , School of Industrial Engineering , Purdue University , West Lafayette , Indiana .
  • STECKE , K. B. , and SOLBERG , J. J. 1981 , Loading and control policies for a flexible manufacturing system , International Journal of Production Research , 19 , 481 .
  • STECKE , K. E. , and SOLBERG , J. J. 1982 , The optimality of unbalanced workloads and machine group sizes for flexible manufacturing systems . Working Paper No. 290 , Division of Research, Graduate School of Business Administration , The University of Michigan , Ann Arbor , Michigan .
  • TAKÁCS , L. 1951 , Probabilistic treatment of the simultaneous stoppage of machines with consideration of the waiting times , Magyar Tud. Akad. Mat. Fiz. Ost. Kozl. , 1 , 228 .
  • TANENBAUM , W. 1970 , How to balance a machine battery. Industrial Engineering , March, 46 .
  • THIRUVENGADAM , K. 1963 , Queueing with breakdowns , Operations Research , 11 , 62 .
  • THIRUVENGADAM , K. 1964 a, A generalization of queueing with breakdowns , Defense Science Journal , 14 , 1 .
  • THIRUVENGADAM , K. 1964 b, A priority assignment in machine interference problems , OPSEARCH , 1 , 197 .
  • THIRUVENGADAM , K. 1965 a, Machine interference problem with limited server's availability , OPSEARCH , 2 , 65 .
  • THIRUVENGADAM , K. 1965 b; Studies in waiting line problems . Ph.D. thesis , University of Delhi , Delhi , India .
  • THIRUVENGADAM , K. 1966 , Machine interference problem with postponeable interruptions , Defense Science Journal , 6 , 57 .
  • THIRUVENGADAM , K. , and JAISWAL , N. K. 1963 , The stochastic law of busy periods for the simple machine interference problems , Defense Science Journal , 13 , 263 .
  • THIRUVENGADAM , K. , and JAISWAL , N. K. 1964 , Application of discrete transforms to a queueing process of servicing machines , OPSEARCH , 1 , 87 .
  • WEIR , W. F. 1944 , Figuring most economical machine assignment , Factory Management and Maintenance , 102 , 100 .
  • WIERSMA , C. H. 1976 , Economic utilization of fork trucks , Industrial Engineering , 8 , 32 .
  • WRIGHT , W. R. 1936 , Machine interference . Part I , Mechanical Engineering , 58 , 510 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.