References
- BROWN , R. G. 1962 , Smoothing, forecasting and prediction of discrete time series ( Prentice-Hall, Inc. ), p468 p.
- ELMAGHRABY , S. E. A. 1966 , The design of production systems ( New York Reinhold Publishing Co . ), 333 - 393 .
- FRENCH , S. , and PHIL , B. A. P. 1982 , Sequencing and scheduling an introduction to' the mathematics of the job shop ( New York John Wiley & Sons ), 243 .
- HIRAKI , S. , AOKI , K. , and MURAMATSU , R. 1977 , A study on designing buffer capacity in the mixed-model assembly line , |btProceedings of the 4th ICPR|t, Tokyo , Japan ( London Taylor Francis Ltd .) , 431 - 450 .
- ISHTI , K. , and MURAMATSU , R. 1981 , A study on the production system for the components of prefabricated house with precast concrete panels in Japan , Proceedings of the , 6th ICPR, Novi Sad , Yugoslavia , 285 .
- SHOSHIRODA , M. 1973 , Analysis of variation in production ordering and inventory in fixed cycle ordering system . Unpublished Doctoral Thesis , Tokyo , Waseda University , 330 .
- The report of the committee for improving product quality and productivity in the housing industry , 1976 , funded by the Ministry of International Trade and Industry ( J[adot]panese ), Tokyo , Housing Industry Information Service , 120 .
- ZEIGLER , B. P. 1976 , Theory of modelling and simulation ( New York John Wiley & Sons ), 430 .