25
Views
11
CrossRef citations to date
0
Altmetric
Original Articles

Progress in integrating and optimizing production plans and schedules

, &
Pages 609-624 | Published online: 22 Oct 2007

References

  • ANDERSON , H. , AXSATER , S. , and JONSSON , H. 1981 , Hierarchical materials requirements planning , International Journal of Production Research , 19 , 45 .
  • ANTHONY , R. N. 1965 , Planning and Control Systems A Framework for Analysis ( Cambridge Harvard University Press ).
  • AKMSTRONG , R. J. , and HAX , A. C. 1974 , A Hierarchical Approach for a Naval Tender Job Shop Design MIT Operations Research Center Technical Report 101-74 ( Cambridge MIT Press ).
  • AXSATER , S. 1981 , Aggregation of product data for hierarchical production planning . Operations Research , 29 , 744 .
  • BAKER , K. R. , and PETERSON , D. W. 1979 , An analytic framework for evaluating rolling schedules . Management Science , 25 , 341 .
  • BERRY , W. L. 1972 , Lot sizing for requirements planning systems a framework for analysis . Production and Inventory Management , 13 , 19 .
  • HERRY , W. L. , VOLLMAN , T. K. , and WHYBARK , D. C. 1979 , Master Production Scheduling Principals and Practice ( Washington , D.C. American Production and Inventory Control Society ).
  • BIGGS , J. R. , GOODMAN , S. H. , and HARDY , S. T. 1977 , Lot sizing rules in a hierarchical multi-stage inventory system , Production and Inventory Management , 18 , 200 .
  • BIGGS , J. R. 1979 , Heuristic lot-sizing and sequencing rules in a multistate production-inventory system . Decision Sciences , 10 , 96 .
  • BILLINGTON , P. , MCCLAIN,.J., and THOMAS , J. 1979 , The interaction of lead-time determination, lot-size decisions, and capacity planning in MRP systems , Proceedings of the Eleventh Annual Meeting . American Institute of Decision Sciences , p. 231 .
  • BITRAN , G. R. , HAAS , E. A. , and HAX , A. C. 1982 , Hierarchical production planning a two stage system , Operations Research , 30 , 132 .
  • BITRAN , G. R. , and HAX , A. C. 1977 . On the design of hierarchical production planning systems , Decision Science , 8 , 28 .
  • BRADLEY , S. P. , HAX A. C., MAGNANTI , T. L. 1977 , Applied Mathematical Planning ( Reading Addison-Wesley ).
  • BUFFA , E. W. , and TAUBERT , VV. H. 1972 , Production-Inventory Systems Planning and Control ( Homewood : Richard D. Irwin ).
  • DIXON , P. S. , and SILVER , E. A. 1981 , An heuristic solution for the multi-item, single-level, limited capacity lot-sizing problem , Operations Management , 2 , 23 .
  • DZIELINSKI , B. P. , BAKER , C. T. , and MANNE , A. S. 1973 , Simulation tests of lot size programming , Management Science , 9 , 229 .
  • DZIELINSKI. B. P., and GOMORY , R. E. 1965 , Optimal programming of lot sizes, inventory and labour allocations , Management Science , 11 , 874 .
  • Fox , R. E. 1982 , MRP, KANBAN and OPT—What's best? , Inventories and Production , 2 , 4 .
  • GABBAY , H. 1975 , Hierarchical approach to production planning , MIT Operations Research Centre Technical Report 120 ( Cambridge MIT Press ).
  • GABBAY , H. 1979 . Multi-stage production planning , Management Science , 25 , 1138 .
  • GELDEKS , L. F. , and WASSENHOVE , L. N. 1982 , Hierarchical Integration in production planning theory and practice , Journal of Operations Management , 3 , 27 .
  • GOLDRATT , E. 1980 , Optimized production timetable a revolutionary program for industry . Proceedings of the Twenty-third Annual International Conference ( Washington , D.C. American Production and Inventory Control Society ), p. 172 .
  • GORENSTEIN , S. 1970 , Planning tyre production , Management Science , 17 , 72 .
  • HAESSLER , R. W. 1977 , The disaggregation problem in the paper industry , The Problems of Disaqgregations in Manufacturing and Service Organizations Conference Proceedings ( Columbus . Ohio Ohio State Univeristy ), 117 .
  • HAYES. R. H., and WHEELWRIGHT , S. C. 1979 , Link manufacturing process and product life cycles , Harvard Business Review , 57 , 133 – 140 .
  • HAX , A. C. 1976 , The design of large scale logistics systems a survey and an approach , Modern Trends in Logistics Research , edited by W. Maslow ( Cambridge MIT Press ).
  • HAX, A. C, and GOLOVIN , J. J. 1978 , Hierarchical production planning systems , Studies in Operations Management , edited by A. C Hax ( New York North Holland-American Elsevier ).
  • HAX. A. C. 1978 , Computer based operations management system (COMS) . Studies in Operations Management , edited by A. C. Hax ( New York North Holland-American Elsevier ).
  • HAX , A. C. , and MEAL , H. C. 1975 , Hierarchical integration of production planning and scheduling , Logistics, Vol. I of Studies in Management Sciences , edited by M. A. Geisler ( New York North Holland-American Elsevier ).
  • HOLSTEIN. W. K. 1968 , Production planning and control integrated , Harvard Business Review , 46 . 121 .
  • INTERNATIONAL BUSINESS MACHINES CORPORATION 1977 , Capacity Planning and Operation Sequencing System . Publication GH12-5119-0 .
  • LASDON , L. S. , and TERJUNG , R. C. 1971 , An efficient algorithm for multi-item scheduling , Operations Research , 19 , 946 .
  • MANNE , A. S. 1958 , Programming economic lot sizes , Management Science , 4 , 115 .
  • MEAL , H. C. 1984 , Putting production decisions where they belong , Harvard Business Review . 62 , 102 .
  • ORLICKY , J. 1975 , Material Requirements Planning ( New York : McGraw-Hill ).
  • SILVER , A. A. 1967 , A tutorial on production smoothing and work force balancing . Operations Research , 15 , 985 .
  • STEINBERG , E. , and NAPIER , A. 1980 , Optimal multi-level lot sizing for requirements planning systems . Management Science , 26 , 1258 .
  • TAYLOR , S. G. , SEWARD , S. M. , HEARD, R. C, and BOLANDER , S. F. 1981 , Manufacturing Planning and Control in Process Industries ( Falls Church , Virginia American Production and Inventory Control Society ).
  • TAYLOR , S. G. , SEWARD , S. M. , and BOLANDER , S. F. 1981 , Why the process industries are different , Production and Inventory Management , 22 , 9 .
  • THOREN , S. 1979 , Production sourcing and scheduling in a two-plant multi-warehouse environment , 22nd Annual Conference Proceedings ( Washington , D.C. : American Production and Inventory Control Society ), p. 42.
  • VAN DER LINDEN , P. M..J. , and GREENWALD , H. 1980 , On the choice of a production control system , International Journal of Production Research. 18 , 273 .
  • WIGHT , O. W. 1982 , MRP II Unlocking America's Productivity Potential ( Williston , VT Oliver Wight Lt. Publications ).
  • WIGHT , O. W. 1974 , Production and Inventory Management in the Computer Age ( Boston Cahners ).
  • WINTERS , P. R. 1962 , Constrained inventory rules for production smoothing , Management Science , 8 , 470 .
  • ZANGWILL , W. 1969 , A backlogging model and multi-echelon model of a dynamic economic lot-size production system—a network approach , Management Science , 15 , 506 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.