209
Views
116
CrossRef citations to date
0
Altmetric
Original Articles

An analytic framework for sequencing mixed model assembly lines

, &
Pages 35-48 | Received 01 Nov 1990, Published online: 27 Apr 2007

REFERENCES

  • ACNRTIS , A. , ARBIB, C, and STECKE , K. E. , 1990 , Optimal two-machine scheduling in a flexible flow system . Proceedings of the Second International Conference on Computer Integrated Manufacturing , Rennselaer Polytechnic Institute, Troy , New York .
  • BROOKE , A. , KENDRIK , D. , and MEERAUS , A. , 1988 , GAMS A Users's Guide ( Redwood City , California Scientific Press ).
  • DAR-EL , E. M. , 1977 , Mixed-model assembly line sequencing problems . Omega , 6 ( 4 ), 313 – 323 .
  • DAR-EL , E. M. , and COTHER , R. F. , 1975 , Assembly line sequencing for model mix . International Journal of Production Research , 13 ( 5 ), 463 – 477 .
  • DAR-EL, E. M, and CUCUY , S. , 1977 , Optimal mixed model sequencing for balanced assembly lines . Omega , 5 ( 3 ), 333 – 342 .
  • KILBRIDGE , M. and WEBSTER , L. , 1963 , The assembly line model-mix sequencing problem . Proceedings of the Third International Conference on Operations Research , Oslo ( Paris English Universities Press ) p 247 .
  • MCCORMICK , S. T. , PINEDO , M. L. , SHENKER , S. , and WOLF , B. , 1989 , Sequencing in an assembly line with blocking to minimize cycle time . Operations Research , 37 ( 6 ), 925 – 935 .
  • MILTENBURG , J. , 1989 , Level schedules for mixed model assembly lines in just-in-time production systems . Management Science , 35 ( 2 ), 192 – 207 .
  • MILTENBURG , J. , and SINNAMON , G. , 1989 , Scheduling mixed-model multi-level just-in-time production systems . International Journal of Production Research , 27 ( 9 ), 1487 – 1509 .
  • MONDEN , Y. , 1983 , Toyota Production System ( Norcross , Georgia Institute of Industrial Engineers Press ).
  • OKAMURA , K. , and YAMASHINA , H. , 1979 , A heuristic algorithm for the assembly line model-mix sequencing problem to minimize the risk of stopping the conveyor . International Journal of Production Research , 17 ( 3 ), 233 – 247 .
  • STECKE , K. , and KIM , I. , 1988 , A study of FMS part type selection approaches for short-term production scheduling . International Journal of Flexible Manufacturing Systems , 1 , 7 – 29 .
  • THOMOPOULOS , N. T. , 1970 , Mixed-model line balancing with smooth station assignments . Management Science , 16 ( 9 ), 593 – 603 .
  • WITTROCK , R. J. , 1985 , Scheduling algorithms for flexible flow lines . IBM Journal of Research and Development , 29 , 401 – 412 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.