17
Views
8
CrossRef citations to date
0
Altmetric
Original Articles

Integrative versus separate cycle scheduling heuristics for capacitated discrete lot sizing and sequencing problems

&
Pages 2007-2021 | Received 01 Jan 1994, Published online: 03 Apr 2007

References

  • ARAS , O. A. , and SWANSON , L. A. , 1982 , A lot sizing and sequencing algorithm for dynamic demands upon a single facility . Journal of Operations Management , 2 ( 3 ), 177 – 185 .
  • BAHL, H. C, and RITZMAN , L. P. , 1984 , A cyclical scheduling heuristic for lot sizing with capacity constraints . International Journal of Production Research , 22 ( 5 ), 791 – 800 .
  • BAHL , H. C. , RITZMAN , L. P. , and GUPTA , J. N. D. , 1987 , Determining lot sizes and resource requirements a review . Operations Research , 35 ( 3 ), 329 – 345 .
  • BITRAN , G. R. , and YANASSE , H. H. , 1982 , Computational complexity of the capacitated lot size problem . Management Science , 28 ( 10 ), p1174—1186 p.
  • BRATCHER , T. L. , MORAN , M. A. , and ZIMMER , W. J. , 1970 , Tables of sample sizes in the analysis of variance . Journal of Quality Technology , 2 , 156 – 164 .
  • CAMPBELL , G. M. , and MABERT , V. A. , 1991 , Cyclical schedules for capacitated lot sizing with dynamic demands . Management Science , 37 ( 4 ), 409 – 427 .
  • ELMAGHRABY , S. E. , 1978 , The economic lot scheduling problem (ELSP) review and extensions. Management Science , 24 ( 6 ), 587 – 598 .
  • GELDERS , L. F. ,VAN WASSENHOVE , L. N. , 1981 , Production planning a review . European Journal of Operations Research , 7 , 101 – 110 .
  • GRAVES , S. C. , 1981 , A review of production scheduling . Operations Research , 29 , 646 – 675 .
  • HALL , R. W. , 1988 , Cycle scheduling for improvement . International Journal of Production Research , 26 ( 3 ), 457 – 172 .
  • HAX , A. C. , and CANDEA , D. , 1984 , Production and Inventory Management ( Englewood Cliffs , NJ Prentice-Hall ).
  • KIM , D. , 1991 , Integrative cycle scheduling approach to discrete capacitated lot sizing and sequencing problem . PhD thesis , Indiana University .
  • KIM , D. , MABERT , V. A. , and PINTO , P. A. , 1993 , Integrative cycle scheduling approach for a capacitated flexible assembly system . Decision Sciences , 24 ( 1 ), 126 – 147 .
  • MABERT , V. A. , and PINTO , P. A. , 1987 , Production batch sizes in a repetitive flexible assembly system . Production and Inventory Management , 28 ( 3 ), p34—37 p.
  • MABERT , V. A. , and PINTO , P. A. , 1991 , Ford Motor Company Plastics Division San dusky, Ohio, plant . Cases in Manufacturing and Service Systems , V. A. Mabert (ed) ( Englewood Cliffs , NJ Prentice-Hall ), pp. 192 – 208 .
  • MAES , J. ,VAN WASSENHOVE , L. N. , 1986 , Multi item single level capacitated dynamic lot sizing heuristics a computational comparison (part 1 static case) . IIE Transactions , 18 ( 2 ), 114 – 123 .
  • MAES , J. ,VAN WASSENHOVE , L. N. , 1988 , Multi item single level capacitated dynamic lot-sizing heuristics a general review . Journal of Operations Research Society , 39 ( 11 ), 991 – 1004 .
  • MCCLAIN , J. O. , and TRIGEIRO , W. W. , 1985 , Cyclic assembly schedules . IIE Transactions , 17 , 4 , 346 – 353 .
  • PINTO , P. A. , and MABERT , V. A. , 1986 , A joint lot sizing rule for fixed labor-cost situations . Decision Sciences , 17 ( 2 ), 139 – 150 .
  • SALOMON , M. , KROON,L. G., KUIK.R.VAN WASSENHOVE , L. N. , 1991 , Some extensions of the discrete lot sizing and scheduling problem . Management Science , 37 ( 7 ), 801 – 812 .
  • SUGIMORI , Y. , KUSUNOKI , K. , CHO , F. , and UNKIKAWA , S. , 1977 , Toyota production system and kanban system Materialization of just-in-time and respect-for-human system . International Journal of Production Research , 15 , 553 – 564 .
  • TRIGEIRO, W, W., THOMAS , L. J. , and MCCLAIN , J. O. , 1989 , Capacitated lot sizing with setup times . Management Science , 35 ( 3 ), 353 – 366 .
  • VOLLMANN, T, E., BERRY , W. L. , and WHYBARK , D. C. , 1992 , Manufacturing Planning and Control Systems, , 3rd edn ( Homewood , IL Irwin ).

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.