References
- Theofanus TG. On proper formulation of safety goals and assessment of safety margins for rare and high-consequence hazards. Reliability Eng Syst Saf. 1996;54:243–257.
- Kudinova P, Galushina S. A framework for assessment of severe accident management effectiveness in nordic BWR plants. PSAM 12; 2014 June; Hawaii (USA).
- Westinghouse. Status report 81 - Advanced Passive PWR (AP 1000). IAEA; 2011.
- Gidropress. Status report 93 - VVER-1000. IAEA; 2011.
- AREVA NP & Mitsubishi Heavy Industries. Status Report - ATMEA1TM. IAEA; 2015.
- KEPCO & KHNP. Status Report 103 – Advanced Power Reactor (APR1000). IAEA; 2011
- KEPCO & KHNP. Status report 83 - Advanced Power Reactor 1400 MWe (APR1400). IAEA; 2011.
- KEPCO & KHNP. Chapter 19 Probabilistic Risk Assessment and Severe Accident Evaluation. NRC; 2014.
- Fauske & Associates, LLC. Transmittal document for MAAP5 code revision MAAP 5.04. EPRI; 2016.
- Westinghouse Electric Company, “APR 1400 RCP seal design and ELAP capability,” APR1400-A-M-EC-14002-NP, 2014.
- KHNP. Severe accident management guidelines for shin-kori 3&4. KHNP; 2011.
- Yun J, Kim T, Kim J. Verification of SAMG entry condition for APR1400. Ann Nucl Energy. 2015;75:404–412.
- Nuclear Energy Institute. Diverse and flexible coping strategies (FLEX) implementation guide. NEI; 2015.
- EPRI. Severe accident management guidance technical basis report. EPRI; 2012.
- Engineering and Research, Inc. B.S.b phase 2 & 3 submittal guideline. NEI; 2006.
- EPRI. Modular accident analysis program (MAAP) – MELCOR crosswalk. EPRI; 2014.