References
- Download of measured data for Unit 3. [Internet] Information Portal for the Fukushima Daiichi Accident Analysis and Decommissioning Activities. [cited 2018 Apr 26] Available from: https://fdada.info/en/home2/accident2/measured2/am_download2/
- Pellegrini M, Suzuki H, Mizouchi M, et al. Early phase accident progression analysis of Fukushima Daiichi Unit 3 by the SAMPSON code. Nucl Technol. 2014;186(2):241–254.
- Cardoni J, Gauntt R, Kalinich D, et al. MELCOR simulations of the severe accident at Fukushima Daiichi Unit 3. Nucl Technol. 2014;186(2):179–197.
- Nuclear energy agency/committee on the safety of nuclear installations. Benchmark Study of the Accident at the Fukushima Daiichi Nuclear Power Plant (BSAF Project) Phase I Summary Report; 2015. ( NEA/CSNI/R(2015)18).
- Tokyo Electric Power Company, Inc. Evaluation of the situation of cores and containment vessels of Fukushima Daiichi Nuclear Power Station Units1 to 3 and examination into unsolved issues in the accident progression – Progress; 2017. ( Report No. 5).
- Plant specifications for Unit 3. [Internet] Information Portal for the Fukushima Daiichi Accident Analysis and Decommissioning Activities. [cited 2018 Apr 26] Available from: https://fdada.info/en/home2/accident2/specification2/
- Sato I, Yamashita T, Yoshikawa S, et al. Assessment of core status of TEPCO’s Fukushima Daiichi Nuclear Power Plants (109) - Difference in core energy in core material relocation in Units 2 and 3 of FDNPS and its effects -. Trans. AESJ Fall Meeting; 2018. ( Paper No. 3I03). [In Japanese].