References
- Ballou, D. P. and Pazer, H. L. (1982). “The Impact of Inspector Fallibility on the Inspection Policy in Serial Production Systems.” Management Science 28, pp. 387–399.
- Beightler, C. C. and Mitten, L. G. (1964). “Design of an Optimal Sequence of Interrelated Sampling Plans. “Journal of the American Statistical Association 59, pp. 96–104.
- Britney, R. (1972). “Optimal Screening Plans for Nonserial Production Systems.” Management Science 18, pp. 550–559.
- Brown, E. C. (1968). “Some Mathematical Models of Inspection Along a Production Line.” Technical Report No. 36, Operations Research Center, M.I.T.
- Bullers, W. I.; Nof, S. Y.; and Whinston, A. B. (1980). “Artificial Intelligence in Manufacturing Planning and Control.” AIIE Transactions 12, pp. 351–363.
- Dietrich, D. L. (1971). “A Bayesian Quality Assurance Model for a Multi-Stage Production Process.” Ph.D. thesis, University of Arizona, Department of Aerospace and Mechanical Engineering.
- Dietrich, D. L. and Sanders, J. L. (1974). “A Bayesian Quality Assurance Model for a Multi-Stage Production Processes.” ASQC Technical Conference Transactions, Boston, MA, pp. 338–348.
- Eppen, G. and Hurst, E. (1974). “Optimal Location of Inspection Stations in a Multistage Production Process.” Management Science 20, pp. 1194–1200.
- Ercan, S. S. (1972). “Systems Approach to the Multistage Manufacturing Connected-Unit Situation.” Naval Research Logistics Quarterly 19, pp. 493–500.
- Fisher, E. L. and Nof, S. Y. (1984). “FADES: Knowledge-Based Facility Design.” Proceedings of the Annual International Industrial Engineering Conference, pp. 74–82.
- Garcia-Diaz, A.; Foster, T. W.; and Bonyuet, M. (1984). “Dynamic Programming Analysis of Special Multistage Inspection Systems.” IIE Transactions 16, pp. 115–125.
- Garey, M. R. (1972). “Optimal Test Point Selection for Sequential Manufacturing Processes.” Bell System Technical Journal 51, pp. 291–300.
- Hurst, E. G., Jr. (1973). “Imperfect Inspection in a Multistage Production Process.” Management Science 20, pp. 378–384.
- Lindsay, G. F. and Bishop, A. B. (1964). “Allocation of Screening Inspection Effort—A Dynamic Programming Approach.” Management Science 10, pp. 342–352.
- Peters, M. H. and Williams, W. W. (1984). “Location of Quality Inspection Stations: An Experimental Assessment of Five Normative Rules.” Decision Sciences 15, pp. 389–408.
- Pruzan, P. M. and Jackson, J. T. R. (1967). “A Dynamic Programming Application in Production Line Inspection.” Technometrics 9, pp. 73–81.
- Raz, T. and Thomas, M. U. (1983). “A Method for Sequencing Inspection Activities Subject to Errors.” IIE Transactions 15, pp. 12–18.
- Trippi, R. R. (1974). “An On-Line Computational Model for Inspection Resource Allocation.” Journal of Quality Technology 6, pp. 167–174.
- Trippi, R. R. (1975). “The Warehouse Location Formulation as a Special Type of Inspection Problem.” Management Science, pp. 986–988.
- White, L. S. (1966). “The Analysis of a Single Class of Multistage Inspection Plans.” Management Science 21, pp. 685–693.
- White, L. S. (1969). “Shortest Route Models for the Allocation of Inspection Effort On a Production Line.” Management Science 15, pp. 249–259.
- Wolfe, P. M. and Kung, H. K. (1984). “Automatic Process Planning Using Artificial Intelligence.” Proceedings of the Annual International Industrial Engineering Conference, pp. 387–395.
- Woo, W. K. and Metcalfe, T. E. (1981). “Optimal Allocation of Inspection Effort in Multistage Manufacturing Processes.” Western Electric Engineer 16, pp. 8–16.
- Yum, B. J. and McDowell, E. D. (1981). “The Optimal Allocation of Inspection Effort in a Class of Nonserial Production Systems.” IIE Transactions 13, pp. 285–293.