References
- Anderson, O. D. (1976). Time Series and Forcasting. Buttersworth, London.
- Alwan, L. C. and Roberts, H. V. (1988). “Time Series Modeling for Statistical Process Control”. Journal of Economics and Business Statistics 6, pp. 87–95.
- Bauer, P. and Hackl, P. (1978). “The Use of MOSUMS for Quality Control”. Technometrics 20, pp. 431–436.
- Bauer, P. and Hackl, P. (1980). “An Extension of the MOSUM Technique for Quality Control”. Technometrics 22, pp. 1–8.
- Box, G. E. P. and Jenkins, G. M. (1976). Time Series Analysis, 2nd ed. Holden-Day, San Francisco, CA.
- Box, G. E. P. (1954). “Some Theorems on Quadratic Forms Applied in the Study of Analysis of Variance Problems: Effect of Inequality of Variance in One-Way Classification”. Annals of Mathematical Statistics 25, pp. 290–302.
- Crowder, S. V. and Hamilton, M. (1992). “An EWMA for Monitoring Standard Deviation”. Journal of Quality Technology 24, pp. 12–21.
- Cryer, J. D. (1986). Time Series Analysis. Duxbury Press, Boston, MA.
- Domangue, R. and Patch, S. C. (1991). “Some Omnibus Exponentially Weighted Moving Average Statistical Process Monitoring Schemes”. Technometrics 33, pp. 299–313.
- Harris, T. J. and Ross, W. H. (1991). “Statistical Process Control Procedures for Correlated Observations”. Canadian Journal of Chemical Engineering 69, pp. 48–57.
- Hill, I. D.; Hill, R.; and Holder, R. H. (1976). “Algorithm A599: Fitting Johnson Curves by Moments”. Applied Statistics 25, pp. 180–189.
- Hsu, D. A. (1977). “Test for Variance Shift at an Unknown Time Point”. Applied Statistics 26, pp. 279–284.
- Hunter, J. S. (1986). “The Exponentially Weighted Moving Average”. Journal of Quality Technology 18, pp. 203–210.
- John, P. W. (1990). Statistical Methods in Engineering Quality Assurance. John Wiley & Sons, New York, NY.
- Johnson, N. L., (1949). “Systems of Frequency Curves Generated by Methods of Translation”. Biometrika 36, pp. 149–176.
- Lucas, J. M. (1976). “The Design and Use of V-Mask Control Schemes”. Journal of Quality Technology 8, pp. 1–12.
- MacGregor, J. F. and Harris, T. J. (1990). Discussion of “EWMA Control Schemes” by Lucas and Saccucci. Technometrics 32, pp. 23–26.
- MacGregor, J. F. (1990). “A Different View of the Funnel Experiment”. Journal of Quality Technology 4, pp. 255–259.
- Montgomery, D. C. (1991). Statistical Quality Control. John Wiley & Sons, New York, NY.
- Montgomery, D. C. and Mastrangelo, C. M. (1991). “Some Statistical Process Control Methods for Autocorrelated Data”. Journal of Quality Technology 23, pp. 179–193.
- Nelson, L. S. (1980). “The Mean Square Successive Difference Test”. Journal of Quality Technology 12, pp. 174–175.
- Ng, C. H. and Case, K. E. (1989). “Development and Evaluation of Control Charts Using Exponentially Weighted Moving Averages”. Journal of Quality Technology 21, pp. 242–250.
- Patnaik, P. B. (1949). “The Non-Central χ2 and F Distributions and Their Applications”. Biometrika 36, pp. 202–232.
- Pearson, E. S. and Hartley, H. O. (1972). Biometrika Tables for Statisticians Vol. 2. Cambridge University Press.
- Smith, C. A. and Corripio, A. B. (1985). Principles and Practice of Automatic Process Control. John Wiley & Sons, New York, NY.
- Smith, D. E. (1976). “Adaptive Response for Exponential Smoothing: Comparative System Analysis”. Operational Research Quaterly 25, pp. 421–435.
- Sweet, A. L. (1986). “Control Charts Using Coupled Exponentially Weighted Moving Averages”. IEEE Transactions 18, pp. 26–33.
- Trigg, D. W. and Leach, A. G. (1967). “Exponential Smoothing with an Adaptive Response Rate”. Operational Research Quarterly 18, pp. 53–59.
- Tsay, R. S. (1988). “Outliers, Level Shifts and Variance Changes in Time Series”. Journal of Forecasting 7, pp. 1–20.
- Wortham, A. W. and Ringer, L. J. (1971). “Control via Exponential Smoothing”. Transportation and Logistic Review 7, pp. 33–39.
- Wichern, D. W.; Miller, R. B.; and Hsu, D. A. (1976). “Changes of Variance in First-Order Autoregressive Time Series Models—with an Application”. Applied Statistics 25, pp. 248–256.
- Wortham, A. W. (1972). “The Use of Exponentially Smoothed Data in Continuous Process Control”. International Journal of Production Research 10, pp. 393–400.