References
- Bajgier, S. M. (1992). “The Use of Bootstrapping to Construct Limits on Control Charts”. Proceedings of the Decision Science Institute, San Diego, CA, pp. 1611–1613.
- Davison, A.; Hinkley, D.; and Schectman, E. (1986). “Efficient Bootstrap Simulation”. Biometrika 73, pp. 555–556.
- Derman, C. and Ross, S. (1995). “An Improved Estimator of (7 in Quality Control”. Probability in the Engineering and Informational Sciences 9, pp. 411–415.
- Efron, B. (1979). “Bootstrap Methods: Another Look at the Jackknife”. Annals of Statistics 7, pp. 1–26.
- Efron, B. and Gong, G. (1983). “A Leisurely Look at the Bootstrap, the Jackknife, and Cross-Validation”. The American Statistician 37, pp. 36–48.
- Ghosh, B. K.; Reynolds, Jr., M. R.; and Hui, Y. V. (1981). “Shewhart X̄-Charts with Estimated Process Variance”. Communications in Statistics—Theory and Methods 18, pp. 1797–1822.
- Gunter, B. (1991). “Bootstrapping: How to Make Something From Almost Nothing and Get Statistically Valid Answers, Part I”. Quality Progress pp. 97–103.
- Gunter, B. (1992). “Bootstrapping: How to Make Something From Almost Nothing and Get Statistically Valid Answers, Part III”. Quality Progress pp 119–122.
- Liu, R. Y. and Tang, J. (1996). “Control Charts for Dependent and Independent Measurements Based on the Bootstrap”. Journal of the American Statistical Association 91, pp. 1694–1700.
- Mooney, C. Z. and Duval, R. D. (1993). Bootstrapping A Nonparametric Approach to Statistical Inference. SAGE Publications, Newbury Park, CA.
- Quesenberry, C. P. (1993). “The Effect of Sample Size on Estimated Limits for X̄ and X Control Charts”. Journal of Quality Technology 25, pp. 237–247.
- Seppala, T.; Moskowitz, H.; Plante, R.; and Tang, J. (1995). “Statistical Process Control via the Subgroup Bootstrap”. Journal of Quality Technology 27, pp. 139–153.
- Young, G. A. (1994). “Bootstrap: More than a Stab in the Dark?”. Statistical Science 9, pp. 382–415.