References
- Arcelus, F. J. and Rahim, M. A. (1994). “Simultaneous Economic Selection of a Variables and an Attribute Target Mean”. Journal of Quality Technology 26, pp. 125–133.
- Bettes, D. C. (1962). “Finding an Optimal Target Value in Relation to a Fixed Lower Limit and an Arbitrary Upper Limit”. Applied Statistics 11, pp. 202–210.
- Bisgaard, S.; Hunter, W. G.; and Pallesen, L. (1984). “Economic Selection of Quality of Manufactured Product”. Technometrics 26, pp. 9–18.
- Boucher, T. O. and Jafari, M. A. (1991). “The Optimum Target Value for Single Filling Operations with Quality Sampling Plans”. Journal of Quality Technology 23, pp. 44–47.
- Carlsson, O. (1992). “Quality Selection of a Two-Dimensional Process Level under Single Acceptance Sampling by Variables”. International Journal of Production Economics 7, pp. 43–56.
- Case, K. E. and Bennett, G. (1977). “The Economic Effect of Measurement Error on Variables Acceptance Sampling”. International Journal of Production Research 15, pp. 117–128.
- Chen, S. L. and Chung, K. J. (1996). “Selection of the Optimal Precision Level and Target Value for a Production Process: The Lower-Specification-Limit Case”. IIE Transactions 28, pp. 979–985.
- Elsayed, E. A. and Chen, A. (1993). “Optimal Levels of Process Parameters for Products with Multiple Characteristics”. International Journal of Production Research 31, pp. 1117–1132.
- Golhar, D. Y. (1987). “Determination of the Best Mean Contents for a Canning Problem”. Journal of Quality Technology 19, pp. 82–84.
- Hald, A. (1981). Statistical Theory of Sampling Inspection by Attributes. Academic Press, New York, NY.
- Hunter, W. G. and Kartha, C. P. (1977). “Determining the Most Profitable Target Value for a Production Process”. Journal of Quality Technology 9, pp. 176–181.
- Kanazuka, T. (1986). “The Effect of Measurement Error on the Power of Charts”. Journal of Quality Technology 18, pp. 91–95.
- Lee, M. K. and Kim, G. S. (1994). “Determination of the Optimal Target Values for a Filling Process When Inspection is Based on a Correlated Variable”. International Journal of Production Economics 37, pp. 205–213.
- Owen, D. B. and Chou, Y. M. (1983). “Effect of Measurement Error and Instrument Bias on Operation Characteristics for Variables Sampling Plans”. Journal of Quality Technology 15, pp. 105–117.
- Tang, K. and Lo, J. (1993). “Determination of the Process Mean When Inspection is Based on a Correlated Variable”. IIE Transactions 25, pp. 66–72.
- Tang, K. and Schneider, H. (1990). “Cost Effectiveness of Using a Correlated Variable in a Complete Inspection Plan When Inspection Error is Present”. Naval Research Logistics 37, pp. 893–904.
- Tsai, H. T.; Moskowitz, H.; and Tang, J. (1995). “A One-sided Single Screening Procedure Based on Individual Unit Misclassification Error”. IIE Transactions 27, pp. 695–706.