References
- Calvin, T. (1983). “Quality Control Techniques for ‘Zero Defects”’. IEEE Transactions on Components, Hybrid and Manufacturing Technology 6 (3), pp. 323–328.
- Chan, L. Y.; Xie, M.; and Goh, T. N. (1997). “Two-Stage Control Charts for High Yield Processes”. International Journal of Reliability, Quality and Safety Engineering 4 (2), pp. 149–165.
- Chan, L. Y.; Xie, M.; and Goh, T. N. (2000). “Cumulative Quantity Control Charts for Monitoring Production Processes”. International Journal of Production Research 38 (2), pp. 397–408.
- Chan, L. Y.; Lin, K. J.; Xie, M.; and Goh, T. N. (2002). “Cumulative Probability Control Charts for Geometric and Exponential Process Characteristics”. International Journal of Production Research 40 (1), pp. 133–150.
- Chan, L. Y.; Lai, C. D.; Xie, M.; and Goh, T. N. (2003). “A Two-Stage Decision Procedure for Monitoring Processes with Low Fraction Nonconforming”. European Journal of Operational Research 150 (2), pp. 420–436.
- Das, T. K.; Jain, V.; and Gosavi, A. (1997). “An Economic Design of Dual-Sampling-Interval Polices for X Charts With and Without Run Rules”. IIE Transactions 29 (6), pp. 497–506.
- Duncan, A. J. (1974). Quality Control and Industrial Statistics, 4th ed. R. D., Irwin Inc. Homewood, IL.
- Ho, C. and Case, K. E. (1994). “Economic Design of Control Charts: A Literature Review for 1981–1991”. Journal of Quality Technology 26 (1), pp. 39–53.
- Jiang, W. and Tsui, K. L. (2000). “An Economic Model for Integrated APC and SPC Control Charts”. IIE Transactions 32 (6), pp. 505–513.
- Kuralamani, V.; Xie, M.; Goh, T. N.; and Gan, F. F. (2002). “A Conditional Decision Procedure for High Yield Processes”. IIE Transactions 34 (12), pp. 1021–1030.
- Lai, C. D.; Chan, L. Y.; and Xie, M. (2001). “Distribution of Runs in a Two-Stage Process Monitoring Model”. Communications in Statistics–Simulation and Computation, 30 (3), pp. 547–557.
- Lee, J. and Kwon, W.J. (1999). “Economic Design of a Two-Stage Control Chart Based on Both Performance and Surrogate Variables”, Naval Research Logistics 46 (8), pp. 958–977.
- Lucas, J. M. (1989). “Control Scheme for Low Count Levels”. Journal of Quality Technology 21 (3), pp. 199–201.
- Sun, J. and Zhang, G. X. (2000). “Control Charts Based on the Number of Consecutive Conforming Items Between Two Successive Nonconforming Items for the Near Zero-Nonconformity Processes”. Total Quality Management 11 (2), pp. 235–250.
- U.S. Department of Defense. (1988). Continuous Sampling Procedures, MIL-STD 1235C.
- U.S. Department of Defense. (1989). Attribute Sampling Plans, MIL-STD 105E.
- Wadsworth, H. M.; Stephens, K. S.; and Godfrey, A. B. (1986). Modern Methods for Quality Control and Improvement. Wiley, New York.
- Wetherill, G. B. (1977). Sampling Inspection and Quality Control, 2nd ed. Wiley, New York.