1,190
Views
14
CrossRef citations to date
0
Altmetric
Original Articles

How to Build Major Transport Infrastructure Projects within Budget, in Time and with the Expected Output; a Literature Review

, &
Pages 195-218 | Received 21 May 2012, Accepted 19 Feb 2013, Published online: 03 Apr 2013

References

  • van Aken , T. 1996 . De weg naar projectsucces; resultaten bereiken met mensen [The road to project success; achieving results with people] , Zaltbommel : Van Haren Publishing .
  • Bhargava , A. , Anastasopoulos , P. C. , Labi , S. , Sinha , K. C. and Mannering , F. L. 2010 . Three-stage least-squares analysis of time and cost overruns in construction contracts . Journal of Construction Engineering and Management , 136 ( 11 ) : 1207 – 1218 . (doi:10.1061/(ASCE)CO.1943-7862.0000225)
  • Bordat, C., McCullouch, B. G., Labi, S., & Sinha, K. C. (2004). An analysis of cost overruns and time delays of INDOT projects (Publication No. FHWA/IN/JTRP-2004/7, SPR-2811). Washington, DC: Transportation Research Board.
  • Cantarelli , C. C. , Flyvbjerg , B. , Molin , E. J. E. and Wee , B. Van . 2010 . Cost overruns in large-scale transportation infrastructure projects: Explanations and their theoretical embeddedness . European Journal of Transport Infrastructure Research , 10 ( 1 ) : 5 – 18 .
  • Cantarelli , C. C. , Flyvbjerg , B. , Molin , E. J. E. and Wee , B. Van . 2012 . Characteristics of cost overruns for Dutch transport infrastructure projects and the importance of the decision to build and project phases . Transport Policy , 22 : 49 – 56 . (doi:10.1016/j.tranpol.2012.04.001)
  • Cantarelli , C. C. , Molin , E. J .E. , Van Wee , G. P. and Flyvbjerg , B. 2012 . Different cost performance: Different determinants? The case of cost overruns in Dutch transport infrastructure projects . Transport Policy , 22 : 88 – 95 . (doi:10.1016/j.tranpol.2012.04.002)
  • Cooke-Davies , T. 2002 . The “real” success factors on projects . International Journal on Project Management , 20 : 185 – 190 . (doi:10.1016/S0263-7863(01)00067-9)
  • Flyvbjerg , B. 2005 . Measuring inaccuracy in travel demand forecasting: Methodological considerations regarding ramp up and sampling . Transportation Research Part A , 39 : 522 – 530 .
  • Flyvbjerg , B. 2006 . From Nobel Prize to project management: Getting risks right . Project Management Journal , 37 ( 3 ) : 5 – 15 .
  • Flyvbjerg, B. (2007). Policy and planning for large-infrastructure projects: Problems, causes, cures. Environment and Planning B: Planning and Design, 34, 578–597.
  • Flyvbjerg , B. 2012 . Why mass media matter to planning research: The case of megaprojects . Journal of Planning Education and Research , 32 ( 2 ) : 169 – 181 . (doi:10.1177/0739456X12441950)
  • Flyvbjerg , B. , Bruzelius , N. and Rothengatter , W. 2003 . Megaprojects and risk: An anatomy of ambition , Cambridge : Cambridge University Press .
  • Flyvbjerg , B. and Cowi . 2004 . Procedures for dealing with optimism bias in in transport planning: Guidance document , London: UK : Department for Transport .
  • Flyvbjerg , B. , Skamris Holm , M. K. and Buhl , S. L. 2002 . Underestimating costs in public works projects: Error or lie? . American Planning Association , 68 ( 3 ) : 279 – 295 . (doi:10.1080/01944360208976273)
  • Flyvbjerg , B. , Skamris Holm , M. K. and Buhl , S. L. 2003 . How common and how large are cost overruns in transport infrastructure projects? . Transport Reviews , 23 ( 1 ) : 71 – 88 . (doi:10.1080/01441640309904)
  • Flyvbjerg , B. , Skamris Holm , M. K. and Buhl , S. L. 2004 . What causes cost overrun in transport infrastructure projects? . Transport Reviews , 24 ( 1 ) : 3 – 18 . (doi:10.1080/0144164032000080494a)
  • Flyvbjerg, B., Skamris Holm, M. K., & Buhl, S. L. (2006). Inaccuracy in traffic forecasts. Transport Reviews, 26(1), 1–24.
  • Giezen , M. 2012 . Keeping it simple? A case study into the advantages and disadvantages of reducing complexity in mega project planning . International Journal of Project Management , 30 : 781 – 790 . (doi:10.1016/j.ijproman.2012.01.010)
  • Hall , P. 1980 . Great planning disasters , Harmondsworth : Penguin Books .
  • Hertogh , M. , Baker , S. , Staal-Ong , P. L. and Westerveld , E. 2008 . Managing large infrastructure projects; research on best practices and lessons learnt in large infrastructure projects in Europe , Utrecht : Netlipse .
  • Lee , J. K. 2008 . Cost overrun and cause in Korean social overhead capital projects: Roads, rails, airports, and ports . Journal of Urban Planning and Development , 134 ( 2 ) : 59 – 62 . (doi:10.1061/(ASCE)0733-9488(2008)134:2(59))
  • Mackie , P. and Preston , J. 1998 . Twenty-one sources of error and bias in transport project appraisal . Transport Policy , 5 ( 1 ) : 1 – 7 . (doi:10.1016/S0967-070X(98)00004-3)
  • Mansfield , N. R. , Ugwu , O. O. and Doran , T. 1994 . Causes of delay and cost overruns in Nigerian construction projects . International Journal of Project Management , 12 ( 4 ) : 254 – 260 . (doi:10.1016/0263-7863(94)90050-7)
  • Morris , P. W. G. 1990 . Cost and time overruns in public sector projects . Economical and Political Weekly , 25 ( 47 ) : 154 – 168 .
  • Morris , P. W .G. and Hough , G. H. 1987 . The anatomy of major projects: A study of the reality of project management , New York : John Wiley and Sons .
  • Odeck , J. 2004 . Cost overruns in road construction—What are their sizes and determinants? . Transport Policy , 11 ( 1 ) : 43 – 53 . (doi:10.1016/S0967-070X(03)00017-9)
  • Pickrell , D. 1992 . A desire named streetcar: Fantasy and fact in rail transit planning . Journal of the American Planning Association , 58 ( 2 ) : 158 – 176 . (doi:10.1080/01944369208975791)
  • Priemus , H. 2007 . Development and design of large infrastructure projects: Disregarded alternatives and issues of spatial planning . Environment and Planning B: Planning and Design , 34 : 626 – 644 . (doi:10.1068/b32109)
  • Priemus , H. 2010 . Decision-making on mega-projects: Drifting on political discontinuity and market dynamics . EJTR , 10 ( 1 ) : 19 – 29 .
  • Siemiatycki , M. 2009 . Academics and auditors: Comparing perspectives on transportation project cost overruns . Journal of Planning Education and Research , 29 : 142 – 156 . (doi:10.1177/0739456X09348798)
  • Skamris , M. K. and Flyvbjerg , B. 1997 . Inaccuracy of traffic forecasts and cost estimates on large transport projects . Transport Policy , 4 ( 3 ) : 141 – 146 . (doi:10.1016/S0967-070X(97)00007-3)
  • Tam, C. M. (1999). Build-operate-transfer model for infrastructure developments in Asia: Reasons for successes and failures. International Journal of Project Management, 17(6), 377–382.
  • Wachs , M. 1990 . Ethics and advocacy in forecasting for public policy . Business and Professional Ethics Journal , 9 ( 1–2 ) : 141 – 157 . (doi:10.5840/bpej199091/215)
  • de Wit , A. 1988 . Measurement of project success . International Journal of Project Management , 6 ( 3 ) : 164 – 170 . (doi:10.1016/0263-7863(88)90043-9)

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.