Cost escalations in the front-end of projects – empirical evidence from Norwegian road projects

&
Pages 612-630 | Received 16 Feb 2016, Accepted 28 Dec 2016, Published online: 13 Jan 2017

References

  • Andersen, B., Samset, K., & Welde, M. (2016). Low estimates – high stakes: Underestimation of costs at the front-end of projects. International Journal of Managing Projects in Business, 9(1), 171–193. doi: 10.1108/IJMPB-01-2015-0008
  • Blanc-Brude, F., & Makovsek, D. (2013). Construction risk in infrastructure project finance. Lille: EDHC Business School.
  • Bordat, C., McCullouch, B. G., Labi, S., & Sinha, K. C. (2004). An analysis of cost overruns and time delays of INDOT projects ( Publication no. FHWA/IN/JTRP-2004/7, SPR-2811). Washington, DC: Transportation Research Board.
  • Cantarelli, C., Flyvbjerg, B., van Wee, B., & Molin, E. J. E (2010). Lock-in and its influence on the project performance of large-scale transportation infrastructure projects: Investigating the way in which lock-in can emerge and affect cost overruns. Environment and Planning B: Planning and Design, 37(5), 792–807. doi: 10.1068/b36017
  • Chapman, C. (2012). Assessing the proposal. In T. Williams & K. Samset (Eds.), Project governance. Getting investments right (pp. 81–135). London: Palgrave Macmillan.
  • Cooke-Davies, T. (2009). Front-end alignment of projects – Doing the right project. In T. Williams, K. Samset, & K. J. Sunnevåg (Eds.), Making essential choices with scant information (pp. 106–125). Basingstoke: Palgrave Macmillan.
  • Dysert, L. R. (2012). Chapter 9 – Estimating. In S. J. Amos (Ed.), Skills & knowledge of cost engineering (pp. 102–136). Morgantown, WV: AACE International.
  • Edkins, A., Geraldi, J., Morris, P., & Smith, A. (2013). Exploring the front-end of project management. Engineering Project Organization Journal, 3(2), 71–85. doi: 10.1080/21573727.2013.775942
  • Eliasson, J., Börjesson, M., Odeck, J., & Welde, M. (2015). Does benefit-cost efficiency influence transport investment decisions? Journal of Transport Economics and Policy, 49(3), 377–396.
  • Ellis, R., Pyeon, J. H., Herbsman, Z., Minchin, E., & Molenaer, K. (2007). Evaluation of alternative contracting techniques on FDOT construction projects. Tallahassee, FL: Department of Transportation.
  • European Commission. (2014). Guide to cost-benefit analysis of investment projects. Luxembourg: Publications Office of the European Union.
  • Fleming, M., Konapski, K., & Fanning, R. (2009). Evaluation of the accuracy of capital project cost estimates. Olympia, WA: State of Washington Joint Legislative Audit and Review Committee.
  • Flyvbjerg, B. (2009). Survival of the unfittest: Why the worst infrastructure gets built – and what we can do about it. Oxford Review of Economic Policy, 25(3), 344–367. doi: 10.1093/oxrep/grp024
  • Flyvbjerg, B. (2013). Quality control and due diligence in project management: Getting decisions right by taking the outside view. International Journal of Project Management, 31(5), 760–774. doi: 10.1016/j.ijproman.2012.10.007
  • Flyvbjerg, B., Skamris Holm, M., & Buhl, S. (2002). Underestimating costs in public works projects: Error or lie? Journal of the American Planning Association, 68(3), 279–295. doi: 10.1080/01944360208976273
  • Flyvbjerg, B., Skamris Holm, M. K., & Buhl, S. (2003). How common and how large are cost overruns in transport infrastructure projects? Transport Reviews, 23(1), 71–88. doi: 10.1080/01441640309904
  • GAO (United States General Accounting Office). (1997). Transportation infrastructure. Managing the costs of large-dollar highway projects. Washington, DC: United States General Accounting Office. Resources, Community and Economic Development Division.
  • HM Treasury. (2015). Early financial cost estimates of infrastructure programmes and projects and the treatment of uncertainty and risk [online]. Retrieved December 2, 2015, from https://www.gov.uk
  • Hollmann, J. K. (2012). Estimate accuracy: Dealing with reality. Cost Engineering, 54(6), 17–27.
  • Hollmann, J. K., Bali, R. S., Germain, C., & Kai-man, K. (2014, June 15–18). Variability in accuracy ranges: A case study in the Canadian hydropower industry. Paper presented at AACE’s 2014 Annual Meeting, New Orleans, LA, USA.
  • INDOT. (2004). Cost overruns and time delays of INDOT projects. Indiana Department of Transportation, Federal Highway Administration. West Lafayette, IN: Purdue University.
  • Kaliba, C., Muya, M., & Mumba, K. (2009). Cost escalation and schedule delay in road construction projects in Zambia. International Journal of Project Management, 27(5), 522–531. doi: 10.1016/j.ijproman.2008.07.003
  • Klakegg, O. J., & Volden, G. H. (2016). Governance in public projects. The Norwegian case. In R. Müller (Ed.), Governance and governmentability for projects. Enablers, practices and consequences (pp. 129–157). New York: Routledge.
  • Lovallo, D., & Kahneman, D. (2003). Delucions of success: How optimism undermines executives’ decisions. Harvard Business Review, 81, 56–63.
  • Morris, P. (2011). A brief history of project management. In P. Morris, J. Pinto, & J. Søderlund (Eds.), The Oxford handbook on project management (pp. 15–37). Oxford: Oxford University Press.
  • Mott, Macdonald (2002). Review of large public procurement in the UK. London: HM Treasury.
  • Odeck, J. (2004). Cost overrun in road construction – what are their sizes and determinants? Transport Policy, 11(1), 43–53. doi: 10.1016/S0967-070X(03)00017-9
  • Odeck, J. (2014). Do reforms reduce the magnitudes of cost overruns in road projects? Statistical evidence from Norway. Transportation Research Part A, 65, 68–79.
  • Odeck, J., Welde, M., & Volden, G.H. (2015). The impact of external quality assurance of costs estimates on cost overruns – Empirical evidence from the Norwegian road sector. European Journal of Transport and Infrastructure Research, 15(3), 1–7.
  • Riksrevisionsverket. (1994). Infrastrukturinvesteringar- en kostnadsjämförelse mellan plan och utfall i större projekt inom Vägverket och Banverket. Swedish National Audit Bureau, RRV 1994. Vol. 23, p. 126.
  • Sager, T. (2016). Why don’t cost-benefit results count for more? The case of Norwegian road investment priorities. Urban Planning and Transport research, 4(1), 101–121. doi: 10.1080/21650020.2016.1192957
  • Samset, K. (2013). Strategic and tactical performance of mega-projects – between successful failures and inefficient successes. In H. Priemus & B. van Wee (Eds.), International handbook on mega-projects (pp. 11–34) Cheltenham: Edward Elgar.
  • Samset, K., & Volden, G.H. (2013). Investing for impact. Lessons with the Norwegian state project model and the first investment projects that have been subjected to external quality assurance (Concept report no. 36). Trondheim: Norwegian University of Science and Technology.
  • Siemiatycki, M. (2009). Academics and auditors. Comparing perspectives on transport project cost overruns. Journal of Planning Education and Research, 29(2), 142–156. doi: 10.1177/0739456X09348798
  • Statistics Norway. (2016). Construction cost index for road construction [online]. Retrieved June 23, 2016, from http://www.ssb.no/en/priser-og-prisindekser/statistikker/bkianl/kvartal
  • UK National Audit Office. (2007). Estimating and monitoring the costs of building roads in England ( Audit report). London: The Stationery Office.
  • van Wee, B., & Rietveld, P. (2013). CBA: Ex ante evaluation of mega-projects. In H. Priemus & B. van Wee (Eds.), International handbook on mega-projects (pp. 269–291). Cheltenham: Edward Elgar.
  • Westney, R. (2012). Why do projects overrun, and what to do about it [online]. Retrieved December 1, 2015, from www.westney.com
  • Williams, T., & Samset, K. (2010). Issues in front-end decision making on projects. Project Management Journal, 41(2), 38–49. doi: 10.1002/pmj.20160
  • Wu, Q. (2006). Transportation infrastructure project cost overrun risk analysis – risk factor analysis models (Master thesis). The Faculty of Graduate Studies (Business Administration), The University of British Columbia.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.