Tales on the dark side of the transport infrastructure provision: a systematic literature review of the determinants of cost overruns

, & ORCID Icon
Pages 774-794 | Received 21 Apr 2018, Accepted 19 Jun 2019, Published online: 02 Jul 2019

References

  • Ahiaga-Dagbui, D. D., Love, P. E. D., Smith, S. D., & Ackermann, F. (2017). Toward a systemic view to cost overrun causation in infrastructure projects: A review and implications for research. Project Management Journal, 48(2), 88–98. doi: 10.1177/875697281704800207
  • Ahiaga-Dagbui, D. D., & Smith, S. D. (2014). Rethinking construction cost overruns: Cognition, learning and estimation. Journal of Financial Management of Property and Construction, 19(1), 38–54. doi: 10.1108/JFMPC-06-2013-0027
  • Albano, G., Bianchi, M., & Spagnolo, G. (2006). Bid average methods in procurement. Rivista di Politica Economica, 2006(1-2), 41–62.
  • Bajari, P., Houghton, S., & Tadelis, S. (2014). Bidding for incomplete contracts: An empirical analysis of adaptation costs. American Economic Review, 104(4), 1288–1319. doi: 10.1257/aer.104.4.1288
  • Bajari, P., & Tadelis, S. (2001). Incentives versus transaction costs: A theory of procurement contracts. The RAND Journal of Economics, 32(3), 387–407. doi: 10.2307/2696361
  • Bhargava, A., Anastasopoulos, P. C., Labi, S., Sinha, K. C., & Mannering, F. L. (2010). Three-stage least-squares analysis of time and cost overruns in construction contracts. Journal of Construction Engineering and Management, 136(11), 1207–1218. doi: 10.1061/(ASCE)CO.1943-7862.0000225
  • Bucciol, A., Chillemi, O., & Palazzi, G. (2013). Cost overrun and auction format in small size public works. European Journal of Political Economy, 30, 35–42. doi: 10.1016/j.ejpoleco.2013.01.002
  • Cantarelli, C. C., Flyvbjerg, B., & Buhl, S. L. (2012). Geographical variation in project cost performance: The Netherlands versus worldwide. Journal of Transport Geography, 24, 324–331. doi: 10.1016/j.jtrangeo.2012.03.014
  • Cantarelli, C. C., Flyvbjerg, B., Molin, E. J. E., & van Wee, B. (2010). Cost overruns in large-scale transportation infrastructure projects: Explanations and their theoretical embeddedness. European Journal of Transport and Infrastructure Research, 10(1), 5–18.
  • Cantarelli, C. C., Flyvbjerg, B., van Wee, B., & Molin, E. J. (2010). Lock-in and its influence on the project performance of large-scale transportation infrastructure projects: Investigating the way in which lock-in can emerge and affect cost overruns. Environment and Planning B: Planning and Design, 37(5), 792–807. doi: 10.1068/b36017
  • Cantarelli, C. C., Molin, E. J., Van Wee, B., & Flyvbjerg, B. (2012). Characteristics of cost overruns for Dutch transport infrastructure projects and the importance of the decision to build and project phases. Transport Policy, 22, 49–56. doi: 10.1016/j.tranpol.2012.04.001
  • Cantarelli, C. C., Van Wee, B., Molin, E. J., & Flyvbjerg, B. (2012). Different cost performance: Different determinants? The case of cost overruns in Dutch transport infrastructure projects. Transport Policy, 22, 88–95. doi: 10.1016/j.tranpol.2012.04.002
  • Castro, F. M., Guccio, C., & Rizzo, I. (2014). An assessment of the waste effects of corruption on infrastructure provision. International Tax and Public Finance, 21(4), 813–843. doi: 10.1007/s10797-014-9312-5
  • Charnes, A., Cooper, W. W., & Rhodes, E. (1978). Measuring the efficiency of decision making units. European Journal of Operational Research, 2(6), 429–444. doi: 10.1016/0377-2217(78)90138-8
  • Chong, U., & Hopkins, O. (2016). An international experience on the evolution of road costs during the project life cycle. Transport Policy, 48, 60–66. doi: 10.1016/j.tranpol.2016.02.010
  • Creedy, G. D., Skitmore, M., & Wong, J. K. (2010). Evaluation of risk factors leading to cost overrun in delivery of highway construction projects. Journal of Construction Engineering and Management, 136(5), 528–537. doi: 10.1061/(ASCE)CO.1943-7862.0000160
  • Decarolis, F., & Palumbo, G. (2015). Renegotiation of public contracts: An empirical analysis. Economics Letters, 132, 77–81. doi: 10.1016/j.econlet.2015.04.025
  • De Jong, M., Annema, J. A., & Van Wee, G. P. (2013). How to build major transport infrastructure projects within budget, in time and with the expected output; a literature review. Transport Reviews, 33(2), 195–218. doi: 10.1080/01441647.2013.778912
  • Eliasson, J., & Fosgerau, M. (2013). Cost overruns and demand shortfalls–deception or selection? Transportation Research Part B: Methodological, 57, 105–113. doi: 10.1016/j.trb.2013.09.005
  • Estache, A., Iimi, A., & Ruzzier, C. (2009). Procurement in infrastructure. What does theory tell us? (World Bank Policy Research Working Paper No. 4994). Washington, DC: The World Bank. Retrieved from https://openknowledge.worldbank.org/bitstream/handle/10986/4185/WPS4994.pdf?sequence=1&isAllowed=y
  • Flyvbjerg, B. (2005). Policy and planning for large infrastructure projects: Problems, causes, cures (Policy Research Working Paper No. 3781). Washington, DC: The World Bank. Retrieved from http://documents.worldbank.org/curated/en/968761468141298118/pdf/wps3781.pdf
  • Flyvbjerg, B. (2007). Cost overrun and demand shortfalls in urban rail and other infrastructure. Transportation Planning and Technology, 30(1), 9–30. doi: 10.1080/03081060701207938
  • Flyvbjerg, B., Ansar, A., Budzier, A., Buhl, S., Cantarelli, C., Garbuio, M., … Skamris, M. (2018). Five things you should know about cost overrun. Transportation Research Part A: Policy and Practice, 118, 174–190.
  • Flyvbjerg, B., Holm, M. S., & Buhl, S. (2002). Underestimating costs in public works projects: Error or lie? Journal of the American Planning Association, 68(3), 279–295. doi: 10.1080/01944360208976273
  • Flyvbjerg, B., Holm, M. S., & Buhl, S. (2003). How common and how larger are cost overruns in transport infrastructure projects? Transport Reviews, 23, 71–88. doi: 10.1080/01441640309904
  • Flyvbjerg, B., Skamris Holm, M. K., & Buhl, S. L. (2004). What causes cost overrun in transport infrastructure projects? Transport Reviews, 24(1), 3–18. doi: 10.1080/0144164032000080494a
  • Gamez, E. A., & Touran, A. (2010). A quantitative analysis of the performance of transportation projects in developing countries. Transport Reviews, 30(3), 361–387. doi: 10.1080/01441640903034070
  • Gkritza, K., & Labi, S. (2008). Estimating cost discrepancies in highway contracts: Multistep econometric approach. Journal of Construction Engineering and Management, 134(12), 953–962. doi: 10.1061/(ASCE)0733-9364(2008)134:12(953)
  • Greenalgh, T. (1997). How to read a paper: Papers that summarise other papers (systematic reviews and meta-analyses). British Medical Journal, 315, 672–675. doi: 10.1136/bmj.315.7109.672
  • Guccio, C., Pignataro, G., & Rizzo, I. (2012a). Determinants of adaptation costs in procurement: An empirical estimation on Italian public works contracts. Applied Economics, 44(15), 1891–1909. doi: 10.1080/00036846.2011.556589
  • Guccio, C., Pignataro, G., & Rizzo, I. (2012b). Measuring the efficient management of public works contracts: A non-parametric approach. Journal of Public Procurement, 12(4), 528–546. doi: 10.1108/JOPP-12-04-2012-B003
  • Hart, O. (1995). Firms, contracts, and financial structure (pp. 71–155). Oxford (UK): Clarendon Press.
  • Hart, O. (2003). Incomplete contracts and public ownership: Remarks, and an application to public-private partnerships. The Economic Journal, 113(486), C69–C76. doi: 10.1111/1468-0297.00119
  • Hart, O., & Holmstrom, B. (1987). The theory of contracts. In T. Bewley (Ed.), Advances in economic theory, fifth world congress (pp. 71–156). Cambridge: Cambridge University Press.
  • Hu, Y., Chan, A. P., Le, Y., & Jin, R. Z. (2013). From construction megaproject management to complex project management: Bibliographic analysis. Journal of Management in Engineering, 31(4), 04014052. doi: 10.1061/(ASCE)ME.1943-5479.0000254
  • Iimi, A. (2013). Testing low-balling strategy in rural road procurement. Review of Industrial Organization, 43(3), 243–261. doi: 10.1007/s11151-013-9388-6
  • Ioannou, P., & Leu, S. S. (1993). Average-bid method—competitive bidding strategy. Journal of Construction Engineering and Management, 119(1), 131–147. doi: 10.1061/(ASCE)0733-9364(1993)119:1(131)
  • Jung, H. (2016). Renegotiation on incomplete procurement contracts. Applied Economics, 48(23), 2125–2138. doi: 10.1080/00036846.2015.1114579
  • Lewis, G., & Bajari, P. (2011). Procurement contracting with time incentives: Theory and evidence. The Quarterly Journal of Economics, 126(3), 1173–1211. doi: 10.1093/qje/qjr026
  • Littell, J. H., Corcoran, J., & Pillai, V. (2008). Systematic reviews and meta-analysis. New York: Oxford University Press.
  • Lovallo, D., & Kahneman, D. (2003). Delusions of success. Harvard Business Review, 81(7), 56–63.
  • Love, P. E. D., Edwards, D. J., & Smith, J. (2005). Contract documentation and the incidence of rework in projects. Architectural Engineering and Design Management, 1(4), 247–259. doi: 10.1080/17452007.2005.9684596
  • Mahamid, I., & Bruland, A. (2012). Cost deviation in road construction projects: The case of Palestine. Australasian Journal of Construction Economics and Building, 12(1), 58–71. doi: 10.5130/AJCEB.v12i1.2427
  • Makovšek, D. (2014). Systematic construction risk, cost estimation mechanism and unit price movements. Transport Policy, 35, 135–145. doi: 10.1016/j.tranpol.2014.04.012
  • Morris, P. W. G., & Hough, G. H. (1987). The anatomy of major projects. Chichester: Wiley and Sons.
  • Odeck, J. (2004). Cost overruns in road construction—what are their sizes and determinants? Transport Policy, 11(1), 43–53. doi: 10.1016/S0967-070X(03)00017-9
  • Odeck, J. (2014). Do reforms reduce the magnitudes of cost overruns in road projects? Statistical evidence from Norway. Transportation Research Part A: Policy and Practice, 65, 68–79.
  • Petticrew, M., & Roberts, H. (2006). Systematic reviews in the social sciences. Malden: Blackwell Publishing.
  • Pickering, C., & Byrne, J. (2014). The benefits of publishing systematic quantitative literature reviews for PhD candidates and other early-career researchers. Higher Education Research & Development, 33(3), 534–548. doi: 10.1080/07294360.2013.841651
  • Pickrell, D. H. (1992). A desire named streetcar fantasy and fact in rail transit planning. Journal of the American Planning Association, 58(2), 158–176. doi: 10.1080/01944369208975791
  • Reichelt, K., & Lyneis, J. (1999). The dynamics of project performance: Benchmarking the driers of cost and schedule overrun. European Management Journal, 17(2), 135–150. doi: 10.1016/S0263-2373(98)00073-5
  • Shrestha, P. P., & Mani, N. (2014). Impact of design cost on project performance of design-bid-build road projects. Journal of Management in Engineering, 30(3), 04014007. doi: 10.1061/(ASCE)ME.1943-5479.0000220
  • Tranfield, D., Denyer, D., & Smart, P. (2003). Towards a methodology for developing evidence-informed management knowledge by means of systematic review. British Journal of Management, 14(3), 207–222. doi: 10.1111/1467-8551.00375
  • Van Eck, N. J., & Waltman, L. (2010). Software survey: VOSviewer, a computer program for bibliometric mapping. Scientometrics, 84(2), 523–538. doi: 10.1007/s11192-009-0146-3
  • Verweij, S., van Meerkerk, I., & Korthagen, I. A. (2015). Reasons for contract changes in implementing Dutch transportation infrastructure projects: An empirical exploration. Transport Policy, 37, 195–202. doi: 10.1016/j.tranpol.2014.11.004

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.