543
Views
35
CrossRef citations to date
0
Altmetric
Original Articles

Flowshop scheduling model for bespoke precast concrete production planning

, &
Pages 93-105 | Published online: 17 Feb 2007

References

References

  • Allahverdi , A and Mittenthal , J . 1995 . Scheduling on a two‐machine flowshop subject to random breakdowns with a makespan objective function. . European Journal of Operational Research , 81 (2) : 376 – 87 .
  • Allahverdi , A , Gupta , JND and Aldowaisan , T . 1999 . A review of scheduling research involving setup considerations. . Omega, International Journal of Management Science , 27 (2) : 219 – 39 .
  • Benjaoran V Dawood N Development of an artificial intelligence planner framework for bespoke precast concrete production, 2003 Proceeding of the 11th Annual Conference of International Group for Lean Construction Blackburg, Virginia, USA, 22–24 July
  • Campbell , HG , Dudek , RA and Smith , ML . 1970 . A heuristic algorithm for the n job, m machine sequencing problem. . Management Science , 16 (10) : 630 – 7 .
  • Chan , WT and Hu , H . 2002 . Production scheduling for precast plants using a flow shop sequencing model. . Journal of Computing in Civil Engeering , 16 (3) : 165 – 74 .
  • Chang , P , Hsieh , J and Lin , S . 2002 . The development of gradual‐priority weighting approach for the multi‐objective flowshop scheduling problem. . International Journal of Production Economics , 79 (3) : 171 – 83 .
  • Cochran , JK , Horng , SM and Fowler , JW . 2003 . A multi‐population genetic algorithm to solve multi‐objective scheduling problems for parallel machines. . Computers and Operations Research , 30 (7) : 1087 – 102 .
  • Cooper DR Schindler PS 2001 Business Research Methods 7th edn McGraw‐Hill Boston
  • Dannenbring , DG . 1977 . An evaluation of flow shop sequencing heuristics. . Management Science , 23 (11) : 1174 – 82 .
  • Goldberg DE 1989 Genetic Algorithms in Search, Optimisation, and Machine Learning, Addison‐Wesley Reading
  • Gupta , JND . 1971 . A functional heuristic algorithm for the flowshop scheduling problem. . Operational Research Quarterly , 22 (1) : 39 – 47 .
  • Hall , NG and Sriskandarajah , C . 1996 . A survey of machine scheduling problems with blocking and no‐wait in process. . Operations Research , 44 (3) : 510 – 25 .
  • Ishibuchi , H and Murata , T . 1998 . A multi‐objective genetic local search algorithm and its application to flowshop scheduling. . IEEE Transactions on Systems, Man, and Cybernetics – Part C: Applications and Reviews , 28 (3) : 392 – 403 .
  • Jain , AS and Meeran , S . 1999 . Deterministic job‐shop scheduling: past, present and future. . European Journal of Operational Research , 113 (2) : 390 – 434 .
  • Johnson , SM . 1954 . Optimal two‐ and three‐stage production schedules with set up times included. . Naval Research Logistics Quarterly , 1 : 61 – 8 .
  • Leu , S and Hwang , S . 2001 . Optimal repetitive scheduling model with sharable resource constraint. . Journal of Construction Engineering and Management , 127 (4) : 270 – 80 .
  • Leu , S and Hwang , S . 2002 . GA‐based resource‐constrained flow‐shop scheduling model for mixed precast production. . Automation in Construction , 11 (4) : 439 – 52 .
  • Lim , CJ and McMahon , GB . 1994 . The three‐machine flow‐shop problem with arbitrary precedence relations. . European Journal of Operational Research , 78 (2) : 216 – 23 .
  • Linn , R and Zhang , W . 1999 . Hybrid flow shop scheduling: A survey. . Computers and Industrial Engineering , 37 (1–2) : 57 – 61 .
  • Monma , CL and Potts , CN . 1993 . Analysis of heuristics for pre‐emptive parallel machine scheduling with batch setup times. . Operations Research , 41 (5) : 981 – 93 .
  • Murata , T , Ishibuchi , H and Tanaka , H . 1996 . Multi‐objective genetic algorithm and its applications to flowshop scheduling. . Computers and Industrial Engineering , 30 (4) : 957 – 68 .
  • Nawaz , M , Enscore , EE and Ham , I . 1983 . A heuristic algorithm for m‐machine, n‐job flowshop sequencing problem. . Omega , 11 (1) : 91 – 5 .
  • Ogbu , FA and Smith , DK . 1990 . The application of the simulated annealing algorithm to the solution of the n/m/Cmax flowshop problem. . Computers and Operations Research , 17 (3) : 243 – 53 .
  • Ovacik , IM and Uzsoy , R . 1995 . Rolling horizon procedures for dynamic parallel machine scheduling with sequence‐dependent setup times. . International Journal of Production Research , 33 (11) : 3173 – 92 .
  • Palmer , DS . 1965 . Sequencing jobs through a multi‐stage process in the minimum total time – A quick method of obtaining a near optimum. . Operations Research Quarterly , 16 (1) : 101 – 7 .
  • Rajendran , C . 1995 . Heuristics for scheduling in flowshop with multiple objective. . European Journal of Operational Research , 82 (3) : 540 – 55 .
  • Sung , CS and Min , JI . 2001 . Scheduling in a two‐machine flowshop with batch processing machine(s) for earliness/tardiness measure under a common due date. . European Journal of Operational Research , 131 (1) : 95 – 106 .
  • Warszawski A 1990 Industrialization and Robotics in Building: A Managerial Approach, Harper & Row New York

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.