A linear‐discrete scheduling model for the resource‐constrained project scheduling problem

, , &
Pages 797-814 | Received 16 Jul 2003, Accepted 26 Nov 2004, Published online: 17 Feb 2007

References

  • Allen , J. F. 1983 . Maintaining knowledge about temporal intervals. . Communications of the ACM , 26 (11) : 832 – 43 .
  • Ashley , D. B. 1980 . Simulation of repetitive‐unit construction. . Journal of Construction Division, ASCE , 106 (2) : 185 – 94 .
  • Chrzanowski , E. N. and Johnston , D. W. 1986 . Application of linear scheduling. . Journal of Construction Engineering and Management, ASCE , 112 (4) : 476 – 91 .
  • Eldin , N. N. and Senouci , A. B. 1994 . Scheduling and control of linear projects. . Canadian Journal of Civil Engineering , 21 (2) : 219 – 30 .
  • Eldin , N. N. and Senouci , A. B. 2000 . Scheduling of linear projects with single loop structures. . Advances in Engineering Software , 31 : 803 – 14 .
  • El‐Rayes , K. 2001 . Object oriented model for repetitive construction scheduling. . Journal of Construction Engineering and Management, ASCE , 127 (3) : 199 – 205 .
  • El‐Rayes , K. and Moselhi , O. 1998 . Resource‐driven scheduling of repetitive activities. . Construction Management and Economics , 16 (4) : 433 – 46 .
  • El‐Rayes , K. and Moselhi , O. 2001 . Optimizing resource utilization for repetitive construction projects. . Journal of Construction Engineering and Management, ASCE , 127 (1) : 18 – 27 .
  • El‐Rayes , K. , Ramanathan , R. and Moselhi , O. 2002 . An object‐oriented model for planning and control of housing construction. . Construction Management and Economics , 20 (3) : 201 – 10 .
  • Handa , V. and Barcia , R. 1986 . Linear scheduling using optimal control theory. . Journal of Construction Engineering and Management, ASCE , 112 (3) : 387 – 93 .
  • Harmelink , D. J. 2001 . Linear scheduling model: float characteristics. . Journal of Construction Engineering and Management, ASCE , 127 (4) : 255 – 60 .
  • Harmelink , D. J. and Rowings , J. E. 1998 . Linear scheduling model: development of controlling activity path. . Journal of Construction Engineering and Management, ASCE , 124 (4) : 263 – 8 .
  • Hartmann , S. 2001 . Project scheduling under limited resources: models, methods and applications , Berlin : Springer .
  • Johnston , D. W. 1981 . Linear scheduling method for highway construction. . Journal of Construction Division, ASCE , 107 (2) : 247 – 61 .
  • Kavanagh , D. P. 1985 . SIREN: a repetitive construction simulation model. . Journal of Construction Engineering and Management, ASCE , 111 (3) : 308 – 23 .
  • Leu , S. and Hwang , S. 2001 . Optimal repetitive scheduling model with shareable resource constraint. . Journal of Construction Engineering and Management, ASCE , 127 (4) : 270 – 80 .
  • Moselhi , O. and El‐Rayes , K. 1993 . Scheduling of repetitive projects with cost optimization. . Journal of Construction Engineering and Management, ASCE , 119 (4) : 681 – 97 .
  • Moselhi , O. and Hassanein , A. 2003 . Optimized scheduling of linear projects. . Journal of Construction Engineering and Management, ASCE , 129 (6) : 664 – 73 .
  • Newbold , R. C. 1998 . Project Management in the Fast Lane, Applying the Theory of Constraints , Boca Raton , FL : St‐Lucie Press .
  • O'Brien , J. J. , Kreitzberg , F. C. and Mikes , F. W. 1985 . Network scheduling variation for repetitive work. . Journal of Construction Engineering and Management, ASCE , 111 (2) : 105 – 16 .
  • Reda , R. 1990 . RPM: repetitive project modeling. . Journal of Construction Engineering and Management, ASCE , 116 (2) : 316 – 30 .
  • Russell , A. D. and Caselton , W. F. 1988 . Extensions to linear scheduling optimization. . Journal of Construction Division, ASCE , 114 (1) : 36 – 52 .
  • Russell , A. D. and Wong , W. C. M. 1993 . New generation of planning structures. . Journal of Construction Engineering and Management, ASCE , 119 (2) : 196 – 214 .
  • Selinger , S. 1980 . Construction planning for linear projects. . Journal of Construction Division, ASCE , 106 (2) : 195 – 205 .
  • Suhail , S. A. and Neale , R. H. 1994 . CPM/LOB: new methodology to integrate CPM and Line of Balance. . Journal of Construction Engineering and Management, ASCE , 120 (2) : 667 – 84 .
  • Zaidi , A. K. and Levis , A. H. 2001 . TEMPER: a temporal programmer for time‐sensitive control of discrete events. . IEEE Transaction on Systems, Man & Cybernetics – Part A , 31 (6) : 485 – 96 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.