References
- Abdelrazig , A. A. 1995 . “ Computerized AHP model for solving bid/no bid decision problems ” . MSc Dissertation, King Fahd University of Petroleum and Minerals
- Abdul‐Hadi , N. 1990 . “ Factors affecting bidding and markup decisions in Saudi Arabia ” . Masters degree, Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals
- Ahmad , I. 1990 . Decision‐support system for modelling bid/no‐bid decision problem. . Journal of Construction Engineering and Management , 116 (4) : 595 – 608 .
- Ahmad , I. and Minkarah , I. 1988 . Questionnaire survey on bidding in construction. . Journal of Management in Engineering , 4 (3) : 229 – 43 .
- Chua , D. K. H. and Li , D. 2000 . Key factors in bid reasoning model. . Journal of Construction Engineering and Management , 126 (5) : 349 – 57 .
- Egemen , M. and Mohamed , A. N. 2007 . A framework for contractors to reach strategically correct bid/no bid and mark‐up size decisions. . Building and Environment , 42 (3) : 1373 – 85 .
- Friedman , L. 1956 . A competitive bidding strategy. . Operations Research , 4 (1) : 104 – 12 .
- Kish , L. 1965 . Survey Sampling , New York : Wiley .
- Lowe , D. J. and Parvar , J. 2004 . A logistic regression approach to modelling the contractor's decision to bid. . Construction Management and Economics , 22 (6) : 643 – 53 .
- Ministry of Economy and Planning . 2004 . The Annual Statistical Book , KSA : Business Econ .
- Ministry of Municipal and Rural Affairs . 2008 . System of contractor classification . available at http://contractors.momra.gov.sa/StaticForms/ContractorsListPage2.aspx (accessed 2 September 2008)
- Pallant , J. 2004 . SPSS Survival Manual: A Step by Step Guide to Data Analysis Using SPSS , UK : Allen & Unwin .
- Shash , A. A. 1993 . Factors considered in tendering decisions by top UK contractors. . Construction Management and Economics , 11 (2) : 111 – 18 .
- Shash , A. A. and Abdul‐Hadi , N. H. 1993 . The effect of contractor size on mark‐up size decision in Saudi Arabia. . Construction Management and Economics , 11 (6) : 421 – 9 .
- Wanous , M. , Boussabaine , H. A. and Lewis , J. 2000 . To bid or not to bid: a parametric solution. . Construction Management and Economics , 18 (4) : 457 – 66 .
- Wanous , M. , Boussabaine , H. A. and Lewis , J. 2003 . A neural network bid/no bid model: the case for contractors in Syria. . Construction Management and Economics , 21 (7) : 737 – 44 .
- Wilkinson , L. , Blank , G. and Gruber , C. 1996 . Desktop Data Analysis with SYSTAT , Upper Saddle River, NJ : Prentice Hall .