507
Views
22
CrossRef citations to date
0
Altmetric
Papers

Selection of slab formwork system using fuzzy logic

, , , &
Pages 659-670 | Received 15 Dec 2008, Accepted 17 May 2011, Published online: 08 Sep 2011

References

  • Abdel-Razek, M.E. (1999) Formwork selection systems in building construction. Journal of Engineering and Applied Science [Cairo University, Cairo, Egypt], 46(4), 629-44.
  • Abdullah, A. (2007) Selection of optimal slab formwork system in Egypt using fuzzy logic model, MSc thesis, Arab Academy for Science, Technology, and Maritime Transport, Alexandria, Egypt.
  • Chan , A.P.C. , Chan , D.W.M. and Yeung , J.F.Y. 2009 . Overview of the application of ‘fuzzy techniques’ in construction management research . ASCE Journal of Construction Engineering and Management , 124 ( 4 ) : 297 – 304 .
  • Chao , L.-C. and Skibniewski , M.J. 1998 . Fuzzy logic for evaluating alternative construction technology . ASCE Journal of Construction Engineering and Management , 135 ( 11 ) : 1241 – 1252 .
  • Dweiri , F. and Meier , F.A. 1996 . Application of fuzzy decision-making in facilities layout planning . International Journal of Production Research , 34 ( 11 ) : 3207 – 3225 .
  • Elazouni , A.M. , Ali , A.E. and Abdel-Razek , R.H. 2005 . Estimating the acceptability of new formwork systems using neural network . ASCE Journal of Construction Engineering and Management , 131 ( 1 ) : 33 – 41 .
  • Elbeltagi , E. and Hegazy , T. 2001 . A hybrid AI-based system for site layout planning in construction . Computer-Aided Civil and Infrastructure Engineering Journal , 16 ( 2 ) : 79 – 93 .
  • Hanna , A.S. and Sanvido , V.E. 1990 . Interactive vertical formwork selection system . ACI Concrete International: Design and Construction , 12 ( 4 ) : 26 – 32 .
  • Hanna , A.S. and Sanvido , V.E. 1991 . Interactive horizontal formwork selection system . ACI Concrete International: Design and Construction , 13 ( 8 ) : 50 – 56 .
  • Hanna , A.S. , Willenbrock , J.H. and Sanvido , V.E. 1992 . Knowledge acquisition and development for formwork selection system . ASCE Journal of Construction Engineering and Management , 118 ( 1 ) : 179 – 198 .
  • Hurd, M.K. (1989) Formwork for Concrete, SP-4, 6th edn, American Concrete Institute, Detroit, MI.
  • Kamarthi , S.V. , Sanvido , V.E. and Kumara , S.R. 1992 . Neuroform-neural network system for vertical formwork selection . ASCE Journal of Computing in Civil Engineering , 6 ( 2 ) : 178 – 193 .
  • Lorterapong , P. and Moselhi , O. 1996 . Project network analysis using fuzzy sets theory . ASCE Journal of Construction Engineering and Management , 122 ( 4 ) : 308 – 318 .
  • MathWorks, Inc. (2006) Fuzzy Logic Toolbox User’s Guide, Updated for Version 2.2.3 (Release 2006a), available at www.mathworks.com (accessed 25 January 2011).
  • Ross , T.J. 1995 . Fuzzy Logic with Engineering Applications , New York : McGraw-Hill .
  • Sayed, Y. (2009). Use of fuzzy logic for prequalification of Egyptian construction contractors, PhD dissertation, Faculty of Engineering, Helwan University, Egypt.
  • Zadeh , L.A. 1965 . Fuzzy sets . Information and Control , 118 : 338 – 353 .
  • Zadeh, L.A. (1975) The concept of a linguistic variable and its application to approximate reasoning [In three parts: I, II and III]. I: Information Sciences, 8, 199-249; II: Information Sciences, 8, 301–53; III: Information Sciences, 9, 43–80.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.