References
- Adrian , J. 2004 . Construction Productivity: Measurement and Improvement , Champaign, IL : Stipes Publishing .
- Alarcón , L.F. Modeling waste and performance in construction . Paper presented at the First Annual Conference of the International Group for Lean Construction, Espoo . August 11–13 , Finland.
- Alarcón, L.F. and Ortíz, R. (1995) The Relationship between Productivity and Safety in the Construction Site, Research Report, School of Engineering, University Catolica de Chile, Santiago, Chile.
- Allmon , E. , Haas , C.T. , Borcherding , J.D. and Goodrum , P.M. 2000 . US construction labor productivity trends, 1970-1998 . ASCE Journal of Construction Engineering and Management , 126 ( 2 ) : 97 – 104 .
- Brisley , C.L. 1952 . How you can put work sampling to work . Factory Management and Maintenance , 110 : 83 – 89 .
- Chitla , V.R. and Abdelhamid , T.S. Comparing process improvement initiatives based on percent plan complete and labour utilization factors . Paper presented at the 11th Conference of the International Group for Lean Construction . July 22–24 , Virginia Tech, VA.
- CII (Construction Industry Institute) (2010) Activity analysis guide. Implementation Resource 252–3, AustinTX.
- Eastman , C.M. and Sacks , R. 2008 . Relative productivity in the AEC industries in the United States for on-site and off-site activities . ASCE Journal of Construction Engineering and Management , 134 ( 7 ) : 517 – 526 .
- Goodrum , P. and Haas , C. 2004 . The long-term impact of equipment technology on labor productivity in the US construction industry at the activity level . ASCE Journal of Construction Engineering and Management , 131 ( 1 ) : 124 – 133 .
- Handa , V.K. and Abdalla , O. 1989 . Forecasting productivity by work sampling . Construction Management and Economics , 7 : 19 – 28 .
- Hanna , A.S. , Chang , C. , Sullivan , K.T. and Lackney , J.A. 2008 . Impact of shift work on labor productivity for labor intensive contractor . ASCE Journal of Construction Engineering and Management , 134 ( 3 ) : 197 – 204 .
- Horman , M.J. Modeling the effects of lean capacity strategies on project performance . Paper presented at the Annual Conference of the International Group for Lean Construction . August 6–8 .
- Horman , M.J. and Kenley , R. 2005 . Quantifying levels of wasted time in construction with meta-analysis . ASCE Journal of Construction Engineering and Management , 131 ( 1 ) : 52 – 61 .
- Howell, G.A.(1999)What is lean construction? in Proceedings of the Seventh Annual Conference of the International Group for Lean Construction, University of California,Berkeley,CA, pp. 1–10.
- Koskela, L. (1992) Application of the New Production Philosophy to Construction, Technical Report No. 72, Center for Integrated Facility Engineering, Department of Civil Engineering, Stanford University.
- Koskela, L., (2000) An exploration towards a production theory and its application to construction, PhD dissertation, Helsinki University of Technology, Espoo, Finland.
- Liou , F. and Borcherding , J.D. 1986 . Work sampling can predict unit rate productivity . ASCE Journal of Construction Engineering and Management , 112 ( 1 ) : 90 – 103 .
- Littell , R.C. , Stroup , W.W. and Freund , R.J. 2002 . SAS for Linear Models , Cary, NC : SAS Publishing .
- Maloney , W.F. 1990 . Framework for analysis of performance . ASCE Journal of Construction Engineering and Management , 116 ( 3 ) : 399 – 415 .
- O’Brien , W. Multi-project resource allocation: parametric models and managerial implications . Paper presented at the Eighth Annual Conference of the International Group for Lean Construction, University of Sussex . July1 7–19 , Brighton, UK.
- Oglesby , C.H. , Parker , H.W. and Howell , G.A. 1989 . Productivity Improvement in Construction , New York : McGraw-Hill .
- Olomolaiye , P.O. 1990 . An evaluation of the relationships between bricklayers’ motivation and productivity . Construction Management and Economics , 8 : 301 – 313 .
- Olomolaiye , P.O. , Wahab , K.A. and Price , A.D.F. 1987 . Problems influencing craftsmen’s productivity in Nigeria . Building and Environment , 22 ( 4 ) : 317 – 323 .
- Olomolaiye , P.O. , Jayawardane , A.K.W. and Harris , F. 1998 . Construction Productivity Management , Harlow : Addison Wesley Longman .
- Peer , S. and North , T.R. 1971 . Unproductive time in building operations . Building Forum , 3 ( 2 ) : 39 – 48 .
- Rogge , D.F. and Tucker , R.L. 1982 . Foreman-delay surveys: work sampling and output . ASCE Journal of the Construction Division , 108 ( 4 ) : 592 – 604 .
- Rosenbaum , P.R. 2002 . Observational Studies , 2nd. , New York : Sage .
- Salim , M. and Bernold , L.E. 1994 . Effects of design-integrated process planning on productivity in rebar placement . ASCE Journal of Construction Engineering and Management , 120 ( 4 ) : 720 – 738 .
- Serpell , A. , Venturi , A. and Contreras , J. Characterization of waste in building construction projects . Paper presented at the Third Annual Conference of the International Group for Lean Construction . September 28–30 xd , Albuquerque, NM.
- Stevens, A.J. (1987) Housebuilding productivity in the UK—results of case studies, in Proceedings of the Fifth CIB W65 International Symposium on the Organisation and Management of Construction: Managing Construction Worldwide, Vol. 2, London, pp. 697–708.
- Teicholz , P. Productivity trends in the construction industry . Paper presented at the AISC Annual Convention, American Institute of Steel Construction . Chicago.
- Thabet , W.Y. and Beliveau , Y.J. 1994 . Modeling work space to schedule repetitive floors in multistory buildings . ASCE Journal of Construction Engineering and Management , 120 ( 1 ) : 96 – 116 .
- Thomas , H.R. 1991 . Labor productivity and work sampling: the bottom line . ASCE Journal of Construction Engineering and Management , 117 ( 3 ) : 423 – 444 .
- Thomas , H.R. and Napolitan , C.L. 1995 . Quantitative effects of construction changes on labor productivity . ASCE Journal of Construction Engineering and Management , 121 ( 3 ) : 290 – 296 .
- Thomas , H.R. , Horman , M.J. , Minchin , R.E. Jr and Chen , D. 2003 . Improving labor flow reliability for better productivity as a lean construction principle . ASCE Journal of Construction Engineering and Management , 129 ( 3 ) : 251 – 261 .