2,157
Views
81
CrossRef citations to date
0
Altmetric
Articles

Structural equation model for investigating factors affecting delay in Indian construction projects

, &
Pages 869-884 | Received 08 Jan 2012, Accepted 30 Jul 2012, Published online: 24 Aug 2012

References

  • Ahsan, M.K. and Gunawan, I. (2010) Analysis of cost and schedule performance of international development projects. International Journal of Project Management, 28, 68–78.
  • Aibinu, A.A. and Jagboro, G.O. (2002) The effects of construction delays on project delivery in Nigerian construction industry. International Journal of Project Management, 20, 593–599.
  • Aibinu, A.A. and Odeyinka, H.A. (2006) Construction delays and their causative factors in Nigeria. Journal of Construction Engineering and Management, 132, 667–677.
  • Al-Kharashi, A. and Skitmore, M. (2009) Causes of delays in Saudi Arabian public sector construction projects. Construction Management and Economics, 27, 3–23.
  • Arditi, D., Akan, G.T. and Gurdamar, S. (1985) Reasons for delays in public projects in Turkey. Construction Management and Economics, 3, 171–181.
  • Assaf, S.A. and Al-Hejji, S. (2006) Causes of delay in large construction projects. International Journal of Project Management, 24, 349–357.
  • Assaf, S.A., Al-Khalil, M. and Al-Hazmi, M. (1995) Causes of delay in large building construction projects. ASCE Journal of Management in Engineering, 11, 45–50.
  • Bramble, B.B. and Callahan, M.T. (1992) Construction Delay Claims, Wiley, New York.
  • Campbell, D.T. and Fiske, D.W. (1959) Convergent and discriminant validity by the multitrait-multimethod matrix. Psychological Bulletin, 56, 81–105.
  • Carmines, E.G. and Zeller, R.A. (1979) Reliability and Validity Assessment, Sage, Beverly Hills, CA.
  • Chan, A.P.C. (2001) Time-cost relationship of public sector projects in Malaysia. International Journal of Project Management, 19, 223.
  • Doloi, H. (2009a) Analysis of pre-qualification criteria in contractor selection and their impacts on project success. Construction Management and Economics, 27, 1245–1263.
  • Doloi, H. (2009b) Relational partnerships: the importance of communication, trust and confidence and joint risk management in achieving project success. Construction Management and Economics, 27, 1099–1109.
  • El-Razek, A.M.E., Bassioni, H.A. and Mobarak, A.M. (2008) Causes of delay in building construction projects in Egypt. Journal of Construction Engineering and Management, 134, 831–841.
  • Eriksson, P.E. and Pesamaa, O. (2007) Modelling procurement effects on cooperation. Construction Management and Economics, 25, 893–901.
  • Faridi, A. and El-Sayegh, S. (2006) Significant factors causing delay in the UAE construction industry. Construction Management and Economics, 24, 1167–1176.
  • Field, A. (2005) Discovering Statistics Using SPSS, Sage, London.
  • Green, P.J. (1990) On use of the EM for penalized likelihood estimation. Journal of the Royal Statistical Society. Series B (Methodological), 52, 443–452.
  • Gupta, P., Gupta, R. and Netzer, T. (2009) Building India: Accelerating Infrastructure Projects Infrastructure Practice, Report prepared by McKinsey & Company Inc., Mumbai, India.
  • Islam, M.D.M. and Faniran, O.O. (2005) Structural equation model of project planning effectiveness. Construction Management and Economics, 23, 215–223.
  • Iyer, K.C. and Jha, K.N. (2005) Factors affecting cost performance. evidence from Indian construction projects. International Journal of Project Management, 23, 283–295.
  • Jha, K.N. and Misra, S. (2007) Ranking and classification of construction coordination activities in Indian projects. Construction Management and Economics, 25, 409–421.
  • Jin, X.-H., Doloi, H. and Gao, S.-Y. (2007) Relationship-based determinants of building project performance in China. Construction Management and Economics, 25, 297–304.
  • Kumaraswamy, M.M. and Chan, D.W.M. (1998) Contributors to construction delays. Construction Management and Economics, 16, 17–29.
  • Ling, F.Y.Y. and Hoi, L. (2006) Risks faced by Singapore firms when undertaking construction projects in India. International Journal of Project Management, 24, 261–270.
  • Lo, T.Y., Fung, I.W.H. and Tung, K.C.F. (2006) Construction delays in Hong Kong civil engineering projects. Journal of Construction Engineering and Management, 132, 636–649.
  • Mansfield, N., Ugwu, O. and Doran, T. (1994) Causes of delay and cost overruns in Nigerian construction projects. International Journal of Project Management, 12, 254–260.
  • Nkado, R.N. (1995) Construction time-influencing factors: the contractor’s perspective. Construction Management and Economics, 13, 81–89.
  • Nunnally, J.C. and Bernstein, I.H. (1994) Psychometric Theory, McGraw-Hill, New York.
  • O’Brien, J.J. and Plotnick, F.L. (1999) CPM in Construction Management, McGraw-Hill, New York.
  • Odeh, A.M. and Battaineh, H.T. (2002) Causes of construction delay: traditional contracts. International Journal of Project Management, 20, 67–73.
  • Odeyinka, H.A. and Yusif, A. (1997) The causes and effects of construction delays on completion cost of housing projects in Nigeria. Journal of Financial Management of Property and Construction, 2, 31–44.
  • Olawale, Y.A. and Sun, M. (2010) Cost and time control of construction projects: inhibiting factors and mitigating measures in practice. Construction Management and Economics, 28, 509–526.
  • Sambasivan, M. and Soon, Y.W. (2007) Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25, 517–526.
  • Satyanarayana, K.N. and Iyer, K.C. (1996) Evaluation of delays in Indian construction contracts. Journal of the Institution of Engineers (India), 77, 14–22.
  • Schriesheim, C.A. (1979) The similarity of individual directed and group directed leader behavior descriptions. Academy of Management Journal, 22, 345–355.
  • Semple, C., Hartman, F. and Jergeas, G. (1994) Construction claims and disputes: causes and cost/time overruns. Journal of Construction Engineering and Management, 120, 785–795.
  • Tenenhaus, M. (2008) Component-based structural equation modelling. Total Quality Management, 19, 871–886.
  • Vaus, D.A. (2001) Research Design in Social Science, Sage, London.
  • Vinodh, S. and Joy, D. (2012) Structural equation modelling of lean manufacturing practices. International Journal of Production Research, 50, 1598–1607.
  • Wong, P.S.P. and Cheung, S.O. (2005) Structural equation model of trust and partnering success. Journal of Management in Engineering, 21, 70–80.
  • Yang, J.-B. and Ou, S.-F. (2008) Using structural equation modelling to analyze relationships among key causes of delay in construction. Canadian Journal of Civil Engineering, 35, 321–332.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.