747
Views
40
CrossRef citations to date
0
Altmetric
Articles

Integrating real time positioning systems to improve blind lifting and loading crane operations

, &
Pages 596-605 | Received 20 Mar 2012, Accepted 03 Dec 2012, Published online: 16 Jan 2013

References

  • Ali , A.D.M.S. , Babu , N. and Varghese , K. 2005 . Collision free path planning of cooperative crane manipulators using genetic algorithm . Journal of Computing in Civil Engineering , 19 ( 2 ) : 182 – 193 .
  • Bernold , L.E. , Lorenc , S.J. and Luces , E. 1997 . On-line assistance for crane operators . Journal of Computing in Civil Engineering , 11 ( 4 ) : 248 – 259 .
  • Bouet, M. and dos Santos, A.L. (2008) RFID tags: positioning principles and localization technique. Paper presented at the conference WD 2008 1st IFIP Wireless Days, November 24–27, Paris.
  • Bouet, M. and Pujolle, G. (2008) A range-free 3-D localization method for RFID tags based on virtual landmarks. Paper presented at the IEEE 19th International Symposium on Personal, Indoor and Mobile Radio Communications, September 15–18, Paris.
  • Caldas , C.H. , Torrent , D.G. and Haas , C.T. 2006 . Using global positioning system to improve materials-locating processes in industrial projects . Journal of Construction Engineering and Management , 132 ( 7 ) : 741 – 749 .
  • Cheng, T. and Teizer, J. (2011) Crane operator visibility of ground operations. Paper presented at the 28th International Symposium on Automation and Robotics in Construction, Seoul, Korea, 29 June–2 July.
  • Cheng , T. , Venugopal , M. , Teizer , J. and Vela , P.A. 2011 . Performance evaluation of ultra wideband technology for construction resource location tracking in harsh environments . Automation in Construction , 20 ( 8 ) : 1173 – 1184 .
  • Cheng , T. , Mantripragada , U. , Teizer , J. and Vela , P.A. 2012 . Automated trajectory and path planning analysis based on ultra wideband data . ASCE Journal of Computing in Civil Engineering , 26 ( 2 ) : 151 – 160 .
  • Dharwadkar, P.V., Varghese, K., O’Connor, J.T. and Gatton, T.M. (1994) Graphical visualization for planning heavy lifts, in K. Khozeimeh (ed.) Proceedings of the 1st Congress on Computing Civil Engineering, ASCE, June 20–22, Washington, DC, pp. 759–66.
  • Everett , J.G. and Slocum , A.H. 1993 . CRANIUM: device for improving crane productivity and safety . Journal of Construction Engineering and Management , 119 ( 1 ) : 23 – 39 .
  • Giretti , A. , Carbonari , A. , Naticchia , B. and De Grassi , M. 2009 . Design and first development of an automated real-time safety management system for construction site . Journal of Civil Engineering and Management , 15 ( 4 ) : 325 – 36 .
  • Gong , J. and Caldas , C.H. 2008 . Data processing for real-time construction site spatial modeling . Automation in Construction , 17 ( 5 ) : 526 – 535 .
  • Hinze , J.W. and Teizer , J. 2011 . Visibility-related fatalities related to construction equipment . Safety Science , 49 ( 5 ) : 709 – 718 .
  • Kang , S. and Miranda , E. 2006 . Planning and visualization for automated robotic crane erection processes in construction . Automation in Construction , 15 ( 4 ) : 398 – 414 .
  • Kim , B.H. and Song , M.R. 1997 . Semi-automation of tower cranes, a study on the development of semi-automatic equipment of construction machinery (VI) , Ilsan , Korea : Korea Institute of Construction Technology .
  • Kim , C.W. , Haas , C.T. , Liapi , K.A. and Caldas , C.H. 2006 . Human-assisted obstacle avoidance system using 3D workspace modeling for construction equipment operation . Journal of Computing in Civil Engineering , 20 ( 3 ) : 177 – 186 .
  • Kwon , S.W. , Bosche , F. , Kim , C.W. , Haas , C.T. and Liapi , K.A. 2004 . Fitting range data to primitives for rapid local 3D modeling using sparse range point clouds . Automation in Construction , 13 ( 1 ) : 67 – 81 .
  • Lee , G. , Kim , H.-H. , Lee , C.-J. , Ham , S.-I. , Yun , S.-H. , Cho , H. , Kim , B.K. , Kim , G.T. and Kim , K. 2009 . A laser-technology-based lifting-path tracking system for a robotic tower crane . Automation in Construction , 18 ( 7 ) : 865 – 874 .
  • Lee , J.H. , Park , S.J. , Oh , S.W. and Kim , Y.S. 2002 . A study on the work efficiency improvement of tower crane operation using GPS and machine vision . Journal of Architectural Institute of Korea , 18 ( 11 ) : 133 – 140 .
  • Lee , U.K. , Kang , K.I. , Kim , G.H. and Cho , H. 2006 . Improving tower crane productivity using wireless technology . Computer-Aided Civil and Infrastructure Engineering , 21 ( 8 ) : 594 – 604 .
  • Leung , W.T. and Tam , C.M. 1999 . Models for assessing hoisting times of tower cranes . Journal of Construction Engineering and Management , 125 ( 6 ) : 385 – 391 .
  • Lin , K.L. and Haas , C.T. 1999 . Multiple heavy lifts optimization . Journal of Construction Engineering and Management , 122 ( 4 ) : 354 – 362 .
  • Lozano-Perez , T. and Wesley , M.A. 1979 . An algorithm for planning collision-free paths among polyhedral obstacles . Communications of the ACM , 22 ( 10 ) : 560 – 570 .
  • Mok , E. , Xia , L. , Retscher , G. and Tian , H. 2010 . A case study on the feasibility and performance of an UWB-AoA real time location system for resources management of civil construction projects . Journal of Applied Geodesy , 4 : 23 – 32 .
  • Peurifoy , R.L. , Schexnayder , C.J. and Shapira , A. 2006 . Construction Planning, Equipment, and Methods , 7th edn , Boston : McGraw-Hill .
  • Rosenfeld , Y. and Shapira , A. 1998 . Automation of existing tower cranes: economic and technological feasibility . Automation in Construction , 7 ( 4 ) : 285 – 298 .
  • Sertyesilisik , B. , Tunstall , A. and McLouglin , J. 2010 . An investigation of lifting operations on UK construction sites . Safety Science , 48 ( 1 ) : 72 – 79 .
  • Shapira , A. and Glascock , J.D. 1996 . Culture of using mobile cranes for building construction . Journal of Construction Engineering and Management , 122 ( 4 ) : 298 – 307 .
  • Shapira , A. and Lyachin , B. 2009 . Identification and analysis of factors affecting safety on construction sites with tower cranes . Journal of Construction Engineering and Management , 135 ( 1 ) : 24 – 33 .
  • Shapira , A. and Simcha , M. 2009 . AHP-based weighting of factors affecting safety on construction sites with tower cranes . Journal of Construction Engineering and Management , 135 ( 4 ) : 307 – 318 .
  • Shapira , A. , Lucko , G. and Schexnayder , C.J. 2007 . Cranes for building construction projects . Journal of Construction Engineering and Management , 133 ( 9 ) : 690 – 700 .
  • Shapira , A. , Rosenfeld , Y. and Mizrahi , I. 2008 . Vision system for tower cranes . Journal of Construction Engineering and Management , 134 ( 5 ) : 320 – 332 .
  • Shapiro , H.I. , Shapiro , J.P. and Shapiro , L.K. 2000 . Cranes and Derricks , 3rd edn , New York : McGraw-Hill .
  • Sivakumar , P.L. , Varghese , K. and Babu , N.R. 2003 . Automated path planning of cooperative crane lifts using heuristic search . Journal of Computing in Civil Engineering , 17 ( 3 ) : 197 – 207 .
  • Siwiak, K., Withington, P. and Phelan, S. (2001) Ultra-wide band radio: the emergence of an important new technology, in Vehicular Technology Conference(VTC 2001-Spring), IEEE VTS 53rd, Rhodes, Greece, 6–9 May, pp. 1169–72.
  • Song , J. , Haas , C.T. and Caldas , C.H. 2006 . Tracking the location materials on construction job sites . Journal of Construction Engineering and Management , 132 ( 9 ) : 911 – 918 .
  • Tam , V.W.Y. and Fung , I.W.H. 2011 . Tower crane safety in the construction industry: a Hong Kong study . Safety Science , 49 ( 2 ) : 208 – 215 .
  • Teizer , J. , Caldas , C.H. and Haas , C.T. 2007 . Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources . Journal of Construction Engineering and Management , 133 ( 11 ) : 880 – 888 .
  • Teizer , J. , Allread , B.S. , Fullerton , C.E. and Hinze , J. 2010 . Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system . Automation in Construction , 19 ( 5 ) : 630 – 640 .
  • Varghese , K. , Dharwadkar , P. , Wolfhope , J. and O’Connor , J.T. 1997 . A heavy lift planning system for crane lifts . Microcomputers in Civil Engineering , 12 ( 1 ) : 31 – 42 .
  • Wang, C., Wu, H. and Tzeng, N.F. (2007) RFID-based 3-D positioning schemes, in 26th IEEE International Conference on Computer Communications, May, pp. 1235–43.
  • Woo , S. , Jeong , S. , Mok , E. , Xia , L. , Choi , C. , Pyeon , M. and Heo , J. 2011 . Application of WiFi-based indoor positioning system for labor tracking at construction sites: a case study in Guangzhou MTR . Automation in Construction , 20 ( 1 ) : 3 – 13 .
  • Yu , S.N. , Kim , B.H. and Han , C.S. 2005 . Development of the semi-automation system for tower crane using position measuring device and carriage control algorithm . Journal of Architectural Institute of Korea , 21 ( 12 ) : 157 – 166 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.