Applying critical chain buffer management theory in location-based management

Pages 506-519 | Received 04 Oct 2012, Accepted 15 Apr 2013, Published online: 23 May 2013

References

  • Andersson, N. and Christensen, K. (2007) Practical implications of location-based scheduling. Paper presented at the conference Construction Management and Economics: Past, Present and Future, 16-18 July.
  • Arditi, D. (1988) Linear scheduling methods in construction practice. Paper presented at the Seventh Annual CMAA Conference, Rancho Mirage, CA, 25-28 September.
  • Arditi, D. and Albulak, M.Z. (1986) Line-of-balance scheduling in pavement construction. ASCE Journal of Construction Engineering and Management, 112(3), 411–424.
  • Arditi, D., Tokdemir, O.B. and Suh, K. (2001) Effect of learning on line of balance scheduling. International Journal of Project Management, 19, 265–277.
  • Arditi, D., Sikangwan, P. and Tokdemir, O.B. (2002) Scheduling system for high rise building construction. Construction Management and Economics, 20(4), 353–364.
  • Bertelsen, S. (2004) Lean construction: where are we, and how to proceed? Lean Construction Journal, 1(1), 46–69.
  • Carr, R.I. and Meyer, W.L. (1974) Planning construction of repetitive units. ASCE Journal of the Construction Division, 100(CO3), 403–12.
  • Cooke-Yarborough, R.E. (1964) Critical path planning and scheduling: an introduction and example. Review of Marketing and Agricultural Economics, 32, 36–48.
  • Flyvbjerg, B. (2004) Five misunderstandings about case-study research, in Clive, S., Gobo, G., Gubrium, J.F. and Silverman, D. (eds.) Qualitative Research Practice, Sage, London and Thousand Oaks, CA, pp. 420–434.
  • Goldratt, E.M. (1988) Computerized shop floor scheduling. International Journal of Production Research, 26(3), 443–455.
  • Goldratt, E.M. (1997) Critical Chain, North River Press, Great Barrington, MA.
  • Goldratt, E.M. (2004) The Goal, 3rd edn, North River Press, Great Barrington, MA.
  • Guba, E.G. (1990) The Alternative Paradigm Dialog, Sage, London.
  • Harmelink, D.J. and Rowings, J.E. (1998) Linear scheduling model: development of controlling activity path. ASCE Journal of Construction Engineering and Management, 124(4), 263–268.
  • Harris, B. and Ioannou, P.G. (1998) Scheduling projects with repeating activities. ASCE Journal of Construction Engineering and Management, 124(4), 269–278.
  • Herroelen, W.S. and Leus, R. (2001) On the merits and pitfalls of critical chain scheduling. Journal of Operations Management, 19, 559–577.
  • Herroelen, W.S., Leus, R. and Demeulemeester, E. (2002) Critical chain project scheduling: do not oversimplify. Project Management Journal, 33(4), 48–60.
  • Hopp, W.J. and Spearman, M.L. (2000) Factory Physics, 2nd edn, McGraw-Hill International Editions, New York.
  • Kankainen, J. and Sandvik, T. (1993) Rakennushankkeen ohjaus [Controlling a construction project], Confederation of Finnish Construction Industries, Rakennustieto Oy, Helsinki.
  • Kankainen, J. and Seppänen, O. (2003) A line-of-balance based schedule planning and control system. Paper presented at the 11th Annual Conference of the International Group for Lean Construction, Blacksburg, Virginia, 22–24 July.
  • Kenley, R. (2004) Project micromanagement: practical site planning and management of work flow. Paper presented at the 12th Annual Conference on Lean Construction, Helsingør, Denmark, 3-6 August.
  • Kenley, R. and Seppänen, O. (2010) Location-Based Management for Construction, Planning, Scheduling and Control, Spon Press, Oxon.
  • Koskela, L. (2000) An Exploration Towards a Production Theory and Its Application to Construction, VVT Publications, Technical Research Centre of Finland, Helsinki.
  • Leach, L. (1999) Critical chain project management improves project performance. Project Management Journal, 30(2), 39–51.
  • Lowe, R.H., D’ Onofio, M. F., Fisk, D. M., Seppänen, O. (2012) A comparison of location-based scheduling with the traditional critical path method. Paper prepared for the American College of Construction Lawyers Annual Meeting, 27 January.
  • Lumsden, P. (1968) The Line of Balance Method, Pergamon Press, Oxford.
  • Mohr, W.E. (1979) Project Management and Control (in the Building Industry), Department of Architecture and Building, University of Melbourne, Melbourne.
  • Patton, M.Q. (2002) Qualitative Research & Evaluation Methods, 3rd edn, Sage, CA.
  • Peer, S. (1974) Network analysis and construction planning. ASCE, Journal of the Construction Division, 100(NCO3), 203–10.
  • Raz, T., Barnes, R. and Dvir, D. (2003) A critical look at critical chain project management. Project Management Journal, 34(4), 24–32.
  • Russell, A.D. (1983) Construction Project Management Information System, Canada Housing and Mortgage Corp, Ottawa.
  • Russell, A.D. (1985) Microcomputers, management, and high-rise construction: the next step. Canadian Journal of Civil Engineering, 12(2), 396–414.
  • Russell, A.D. and Wong, W. (1993) New generation of planning structures. ASCE Journal of Construction Engineering and Management, 119(2), 196–214.
  • Selinger, S. (1980) Construction planning for linear projects. ASCE, Journal of the Construction Division, 106(CO2), 195–205.
  • Seppänen, O. (2009) Empirical research on the success of production control in building construction projects, Doctoral thesis, Faculty of Engineering and Architecture, Helsinki University of Technology, Finland.
  • Seppänen, O. and Kankainen, J. (2004) Empirical research on deviations in production and current state of project control system. Paper presented at the 12th Annual Conference on Lean Construction, Helsingør, Denmark, 3–6 August.
  • Seppänen, O. and Kenley, R. (2005) Performance measurement using location based status data. Paper presented at the 13th Conference of the International Group for Lean Construction, Sydney, Australia, July.
  • Seppänen, O., Ballard, G. and Skari, P. (2010) The combination of Last Planner System and location based management system. Lean Construction Journal, 2010(1), 43–54.
  • Soini, M., Leskelä, I. and Seppänen, O. (2004) Implementation of line-of-balance based scheduling and project control system in a large construction company. Paper presented at the 12th Annual Conference of Lean Construction, Helsingør, Denmark, 3-6 August
  • Stratton, R. (2009) Critical chain project management theory and practice. Paper presented at the POMS 20th Annual Conference, Orlando, Florida, 1–4 May.
  • Trietsch, D. (2005) Why a critical path by any other name would smell less sweet? Project Management Journal, 36(1), 27–36.
  • Uher, T.E. (2003) Programming and Scheduling Techniques, UNSW Press, Sydney.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.