1,629
Views
21
CrossRef citations to date
0
Altmetric
Forthcoming Special Issue Paper: Industrialized Building

A study of a plan-do-check-act method used in less industrialized activities: two cases from industrialized housebuilding

, &
Pages 109-125 | Received 01 Nov 2012, Accepted 03 Jun 2013, Published online: 08 Jul 2013

References

  • Asaka, T. and Ozeki, K. (1990) Handbook of Quality Tools: The Japanese Approach, Productivity Press, Cambridge, MA.
  • Bergman, B. and Klefsjö, B. (2003) Quality from Customer Needs to Customer Satisfaction, Studentlitteratur, Lund, Sweden.
  • Bessant, J., Caffyn, S. and Gallagher, M. (2001) An evolutionary model of continuous improvement behaviour. Technovation, 21, 67–77.
  • Brassard, M. (1989) The Memory Jogger Plus+, GOAL/QPC, Salem, MA.
  • Chong, W.-K. and Low, S.-P. (2005) Assessment of defects at construction and occupancy stages. Journal of Performance of Constructed Facilities, 19(4), 283–289.
  • De Feo, J.A. and Barnard, W.W. (2004) Juran Institute’s Six Sigma: Breakthrough and Beyond, McGraw-Hill, New York.
  • Deming, W.E. (1986) Out of the Crisis, Massachusetts Institute of Technology Center for Advanced Engineering Study, Cambridge, MA.
  • Denzin, N.K. and Lincoln, Y.S. (2005) The Sage Handbook of Qualitative Research, Sage, Thousand Oaks, CA.
  • Gummesson, E. (2000) Qualitative Methods in Management Research, 2nd edn, Sage, Thousand Oaks, CA.
  • Hosotani, K. (1989) The QC Problem Solving Approach: Solving Workplace Problems the Japanese Way, Productivity Press, Madras.
  • Imai, M. (1986) Kaizen: The Key to Japan’s Competitive Success, McGraw-Hill, New York.
  • Ishikawa, K. (1985) What Is Total Quality Control?, The Japanese Way, Prentice Hall, Englewood Cliffs, NJ.
  • Johnsson, H. and Meiling, J. (2009) Defects in offsite construction. Construction Management and Economics, 27(7), 667–681.
  • Juran, J.M. (1992) Juran on Quality by Design: The New Steps for Planning Quality into Goods and Services, Free Press, New York.
  • Juran, J.M. and Godfrey, A.B. (1999) Juran’s Quality Handbook, 5th edn, Appendix V, McGraw-Hill, available at http://www.academia.edu/download/30979708/Jurans_Quality_Handbook.PDF (accessed 18 June 2013).
  • Kume, H. (1985) Statistical Methods for Quality Improvement, Association for Overseas Technical Scholarship (AOTS), Tokyo.
  • Liker, J.K. (2004) The Toyota Way: 14 Management Principles from the World’s Greatest Manufacturer, McGraw-Hill, New York.
  • Meiling, J. and Johnsson, H. (2008) Feedback in industrialised housing: why does it not happen?, in Dainty, A. (ed.) Proceedings of the 24th ARCOM Annual Conference, Cardiff, 1–3 September, ARCOM, Reading, Vol. 1, pp. 145–154.
  • Meiling, J., Backlund, F. and Johnsson, H. (2011) Managing for continuous improvement in off-site construction: an assessment of lean management principles. Engineering, Construction and Architectural Management, ECAM-Nov-2010-0096, 141–158.
  • Miles, M.B. and Huberman, A.M. (1994) Qualitative Data Analysis: An Expanded Sourcebook, 2nd edn, Sage, Thousand Oaks, CA.
  • Nahmens, I. and Ikuma, L.H. (2009) An empirical examination of the relationship between lean construction and safety in the industrialized housing industry. Lean Construction Journal, 2009, 1–12.
  • Neave, H.R. and Deming, W.E. (1990) The Deming Dimension, SPC Press, Knoxville, TN.
  • Pan, W., Gibb, A.G.F. and Dainty, A.R.J. (2007) Perspectives of UK housebuilders on the use of offsite modern methods of construction. Construction Management and Economics, 25, 183–194.
  • Parrish, K., Tommelein, I.D. and Ballard, G. (2009) Use of A3 reports to focus design and construction conversations, in Building a Sustainable Future: Proceedings of the Construction Research Congress, 2009, pp. 360–9.
  • Pascal, D. (2006) Getting the Right Things Done: A Leader’s Guide to Planning and Execution, Lean Enterprise, Cambridge, MA.
  • Pyzdek, T. (2001) The Six Sigma Handbook: A Complete Guide for Greenbelts, Black Belts, and Managers at All Levels, McGraw-Hill, New York.
  • Pyzdek, T. (2003) The Six Sigma Handbook: A Complete Guide for Green Belts, Black Belts, and Managers at All Levels, McGraw-Hill, New York.
  • Quest Worldwide (2007) Solve That Problem, Quest Worldwide, Godalming, Surrey.
  • Rambaud, L. (2006) 8D Structured Problem Solving: A Desk Reference for Creating High Quality 8D Reports, PHRED Solutions, Breckenridge, CO.
  • Shewhart, W.A. (1939) Statistical Method from the Viewpoint of Quality Control, Dover, New York.
  • Shiba, S., Graham, A. and Walden, D. (1993) A New American TQM: Four Practical Revolutions in Management, Productivity Press, Portland, OR.
  • Shiba, S. and Walden, D. (2002) Quality process improvement tools and techniques. Paper for the Massachusetts Institute of Technology and Center for Quality of Management, Revision 6, available at http://bit.ly/N9W5Ol (accessed 18 June 2013).
  • Sobek, D.K. and Jimmerson, C. (2004) A3 reports: tool for process improvement. Paper presented at the 2004 Industrial Engineering Research Conference, Houston, TX, 16-18 May, available at http://bit.ly/1ftAqYt (accessed 14 May 2010).
  • Sobek, D.K. and Smalley, A. (2008) Understanding A3 Thinking: A Critical Component of Toyota’s PDCA Management System, CRC Press, New York.
  • Söderholm, E. (2010) Applicability of continuous improvements in industrialised construction design process, Licentiate thesis, Department of Civil and Environmental Engineering Division of Structural Engineering, Timber Structures, Luleå University of Technology, Sweden.
  • Spear, S. and Bowen, H.K. (1999) Decoding the DNA of the Toyota production system. Harvard Business Review, 77(5), 97–106.
  • Stehn, L. (2008) Byggandet av flervåningshus i trä: erfarenheter efter tre års observation av träbyggandets utveckling: ett samverkansprojekt inom Nationella träbyggnadsstrategins fortbildningsprogram [Multi-storey housing in timber: experiences from three years studying the development of timber housing], School of Technology and Design, Växjö University.
  • Tam, V.W.Y., Tam, C.M., Zeng, S.X. and Ng, W.C.Y. (2007) Towards adoption of prefabrication in construction. Building and Environment, 42(10), 3642–3654.
  • Tiwari, S. and Sarathy, P. (2012) Pull planning as a mechanism to deliver constructible design. Paper presented at IGLC 2012: 20th Conference of the International Group for Lean Construction, San Diego, CA, 17-22 July.
  • Wilson, P.F., Dell, L.D. and Andersson, G.F. (1993) Root Cause Analysis: A Tool for Total Quality Management, ASQC, Milwaukee, WI.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.