2,236
Views
17
CrossRef citations to date
0
Altmetric
Papers

The construction productivity debate and the measurement of service qualities

&
Pages 565-574 | Received 30 Nov 2012, Accepted 23 Jul 2013, Published online: 27 Sep 2013

References

  • Abbott, M. and Carson, C. (2012) A review of productivity analysis of the New Zealand construction industry. Australasian Journal of Construction Economics and Building, 12(3), 1–15.
  • Abdel-Wahab, M. and Vogl, B. (2011) Trends of productivity growth in the construction industry across Europe, US and Japan. Construction Management and Economics, 29(6), 635–644.
  • Albouy, D. and Ehrlich, G. (2012) Metropolitan land values and housing productivity. Working Paper, University of Michigan, May.
  • Albriktsen, R.O. and Førsund, F.R. (1990) A productivity study of the Norwegian building industry. Journal of Productivity Analysis, 2(1), 53–66.
  • Allen, S.G. (1985) Why construction industry productivity is declining. Review of Economics and Statistics, 67(4), 661–669.
  • Allmon, E., Haas, C.T., Borcherding, J.D. and Goodrum, P.M. (2000) US construction labor productivity trends, 1970–1998. Journal of Construction Engineering and Management, 126(2), 97–104.
  • Bakens, W., Vries, O. and Courtney, R. (2005) International review of benchmarking in construction, PSIBouw, available at www.psibouw.nl/details/kennis?m=files&doc_id=202 (accessed 29 November 2012).
  • Bettencourt, L.A., Ostrom, A.L., Brown, S.W. and Roundtree, R.I. (2002) Client co-production in knowledge-intensive business services. California Management Review, 44(4), 100–108.
  • Briscoe, G. (2006) How useful and reliable are construction statistics? Building Research & Information, 34(3), 220–229.
  • Bröchner, J. and Olofsson, T. (2012) Construction productivity measures for innovation projects. Journal of Construction Engineering and Management, 138(5), 670–677.
  • Calabrese, A. (2012) Service productivity and service quality: a necessary trade-off? International Journal of Production Economics, 135(2), 800–812.
  • Chau, K.W. and Walker, A. (1988) The measurement of total factor productivity of the Hong Kong construction industry. Construction Management and Economics, 6(3), 209–224.
  • Chia, F.C., Skitmore, M., Runeson, G. and Bridge, A. (2012) An analysis of construction productivity in Malaysia. Construction Management and Economics, 30(12), 1055–1069.
  • Costa, D.B., Formoso, C.T., Kagioglou, M., Alarcón, L.F. and Caldas, C.H. (2006) Benchmarking initiatives in the construction industry: lessons learned and improvement opportunities. Journal of Management in Engineering, 22(4), 158–167.
  • Craig, B.J. and Pardey, P.G. (1996) Productivity measurement in the presence of quality change. American Journal of Agricultural Economics, 78(5), 1349–1354.
  • Crawford, P. and Vogl, B. (2006) Measuring productivity in the construction industry. Building Research & Information, 34(3), 208–219.
  • Dacy, D.C. (1947) Productivity and price trends in construction since 1947. Review of Economics and Statistics, 47(4), 406–411.
  • Daffin, C., Reed, G. and Vaze, P. (2002) Labour productivity measures for the non-production industries. Economic Trends, 579, 41–56.
  • Djellal, F. and Gallouj, F. (2013) The productivity challenge in services: measurement and strategic perspectives. Service Industries Journal, 33(3–4), 282–299.
  • Dubois, A. and Gadde, L.E. (2002) The construction industry as a loosely coupled system: implications for productivity and innovation. Construction Management and Economics, 20(7), 621–631.
  • Dyer, B., Goodrum, P. and Viele, K. (2012) Effects of omitted variable bias on construction real output and its implications on productivity trends in the United States. Journal of Construction Engineering and Management, 138(4), 558–566.
  • Egan, J. (1998) Rethinking Construction, Report of the Construction Task Force to the Deputy Prime Minister, John Prescott, on the Scope for Improving the Quality and Efficiency of UK Construction, HMSO, London.
  • Färe, R., Grosskopf, S., Forsund, F.R., Hayes, K. and Heshmati, A. (2006) Measurement of productivity and quality in non-marketable services: with application to schools. Quality Assurance in Education, 14(1), 21–36.
  • Fernandez, R. and Palazuelos, E. (2012) European Union economies facing ‘Baumol’s Disease’ within the service sector. Journal of Common Market Studies, 50(2), 231–249.
  • Fixler, D. and Zieschang, K.D. (1992) Incorporating ancillary measures of process and quality change into a superlative productivity index. Journal of Productivity Analysis, 2(4), 245–267.
  • Fox, J.T. and Smeets, V. (2011) Does input quality drive measured differences in firm productivity? International Economic Review, 52(4), 961–989.
  • Ganesan, S. (1984) Construction productivity. Habitat International, 8(3/4), 29–42.
  • Gill, C. (1933) Construction statistics. Journal of the American Statistical Association, 28(181), 31–54.
  • Goodrum, P.M. and Haas, C.T. (2002) Partial factor productivity and equipment technology change at activity level in US construction industry. Journal of Construction Engineering and Management, 128(6), 463–472.
  • Goodrum, P.M. and Haas, C.T. (2004) Long-term impact of equipment technology on labor productivity in the US construction industry at the activity level. Journal of Construction Engineering and Management, 130(1), 124–133.
  • Goodrum, P.M., Haas, C.T. and Glover, R.W. (2002) The divergence in aggregate and activity estimates of US construction productivity. Construction Management and Economics, 20(5), 415–423.
  • Goodrum, P.M., Haas, C.T., Caldas, C., Zhai, D., Yeiser, J. and Homm, D. (2011) Model to predict the impact of a technology on construction productivity. Journal of Construction Engineering and Management, 137(9), 678–688.
  • Griliches, Z. (1992) Introduction, in Griliches, Z. (ed.) Output Measurement in the Service Sectors, University of Chicago Press, Chicago, pp. 1–22.
  • Harper, M.J., Khandrika, B., Kinoshita, R. and Rosenthal, S. (2010) Nonmanufacturing industry contributions to multifactor productivity, 1987–2006. Monthly Labor Review, 133(6), 16–31.
  • Horta, I.M., Camanho, A.S., Johnes, J. and Johnes, G. (2013) Performance trends in the construction industry worldwide: an overview of the turn of the century. Journal of Productivity Analysis, 39(1), 89–99.
  • Housing Forum (2004) National customer satisfaction survey 2003, available at http://housingforum.org.uk/knowledge/publications/national-customer-satisfaction-survey-2003 (accessed 29 November 2012).
  • Inklaar, R., Timmer, M.P. and van Ark, B. (2008) Market services productivity across Europe and the US. Economic Policy, 23(53), 139–194.
  • Johansson, D. (2009) The life cycle costs of indoor climate systems in dwellings and offices taking into account system choice, airflow rate, health and productivity. Building and Environment, 44(2), 368–376.
  • Kaplan, N.M. (1959) Some methodological notes on the deflation of construction. Journal of the American Statistical Association, 54(287), 535–555.
  • Langford, D.A., El-Tigani, H. and Marosszeky, M. (2000) Does quality assurance deliver higher productivity? Construction Management and Economics, 18(7), 775–782.
  • Li, J., Chiang, Y.H., Choi, T.N. and Man, K.F. (2013) Determinants of efficiency of contractors in Hong Kong and China: a panel data model analysis. Journal of Construction Engineering and Management, doi: 10.1061/(ASCE)CO.1943-7862.0000698.
  • Ling, F.Y.Y., Chan, S.W., Chong, E. and Ee, L.P. (2004) Predicting performance of design-build and design-bid-build projects. Journal of Construction Engineering and Management, 130(1), 75–83.
  • Maroto-Sanchez, A. (2012) Productivity in the services sector: conventional and current explanations. Service Industries Journal, 32(5), 719–746.
  • Morehouse, A.D. (1933) The practical application of construction census statistics. Journal of the American Statistical Association, 28(181A), 190–195.
  • Nachum, L. (1999) Measurement of productivity of professional services: an illustration on Swedish management consulting firms. International Journal of Operations & Production Management, 19(9), 922–949.
  • Rankin, J., Fayek, A.R., Meade, G., Haas, C. and Manseau, A. (2008) Initial metrics and pilot program results for measuring the performance of the Canadian construction industry. Canadian Journal of Civil Engineering, 35(9), 894–907.
  • Rojas, E.M. and Aramvareekul, P. (2003a) Is construction labor productivity really declining? Journal of Construction Engineering and Management, 129(1), 41–46.
  • Rojas, E.M. and Aramvareekul, P. (2003) Labor productivity drivers and opportunities in the construction industry. Journal of Management in Engineering, 19(2), 78–82.
  • Ruddock, L. and Ruddock, S. (2011) Evaluation of trends in the UK construction industry using growth and productivity accounts. Construction Management and Economics, 29(12), 1229–1239.
  • Sako, M. (2006) Outsourcing and offshoring: implications for productivity of business services. Oxford Review of Economic Policy, 22(4), 499–512.
  • Schreyer, P. (2001) The OECD productivity manual: a guide to the measurement of industry-level and aggregate productivity. International Productivity Monitor, 2(Spring), 37–51.
  • Schriver, W.R. and Bowlby, R.L. (1985) Changes in productivity and composition of output in building construction, 1972–1982. Review of Economics and Statistics, 67(2), 318–322.
  • Shen, Z., Jensen, W., Berryman, C. and Zhu, Y. (2011) Comparative study of activity-based construction labor productivity in the United States and China. Journal of Management in Engineering, 27(2), 116–124.
  • Sherwood, M. (1994) Difficulties in the measurement of service outputs. Monthly Labor Review, 117(3), 11–19.
  • Stokes, H.K. (1981) An examination of the productivity decline in the construction industry. Review of Economics and Statistics, 63(4), 495–502.
  • Sudit, E.F. (1995) Productivity measurement in industrial operations. European Journal of Operational Research, 85(3), 435–453.
  • Timmer, M.P., Inklaar, R., O’Mahoney, M. and van Ark, B. (2010) Economic Growth in Europe: A Comparative Industry Perspective, Cambridge University Press, Cambridge.
  • Topp, V., Soames, L., Parham, D. and Bloch, H. (2008) Productivity in the mining industry: measurement and interpretation. Australian Government Productivity Commission Staff Working Paper, December.
  • Willis, C.J. and Rankin, J.H. (2012) The construction industry macro maturity model (CIM3): theoretical underpinnings. International Journal of Productivity and Performance Management, 61(4), 382–402.
  • Wölfl, A. (2003) Productivity growth in service industries: an assessment of recent patterns and the role of measurement. STI Working Paper 2003/7, OECD, Paris.
  • Yi, W. and Chan, A.P. (2013) Critical review of labor productivity research in construction journals. Journal of Management in Engineering, doi: 10.1061/(ASCE)ME.1943-5479.0000194.
  • Zhi, M., Hua, G.B., Wang, S.Q. and Ofori, G. (2003) Total factor productivity growth accounting in the construction industry of Singapore. Construction Management and Economics, 21(7), 707–718.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.