7,404
Views
45
CrossRef citations to date
0
Altmetric
Original Articles

Categorizing modularization strategies to achieve various objectives of building investments

, , &
Pages 32-48 | Received 16 Oct 2016, Accepted 04 Jul 2017, Published online: 19 Jul 2017

References

  • Ågren, R. and Wing, R.D., 2014. Five moments in the history of industrialized building. Construction management and economics, 32 (1–2), 7–15.
  • Arnheiter, E.D. and Harren, H., 2005. A typology to unleash the potential of modularity. Journal of manufacturing technology management, 16 (7), 699–711.10.1108/17410380510619923
  • Baldwin, C.Y., 2008. Where do transactions come from? Modularity, transactions, and the boundaries of firms. Industrial and corporate change, 17 (1), 155–195.
  • Baldwin, C.Y. and Clark, K.B., 1997. Managing in an age of modularity. Harvard business review, 75 (5), 84–93.
  • Bask, A., et al. 2011. Framework for modularity and customization: service perspective. Journal of business & industrial marketing, 26, 306–319.10.1108/08858621111144370
  • Burke, G.P. and Miller, R.C., 1998. Modularization speeds construction. Power engineering, 102 (1), 20–22.
  • Chun-Che Huang, C. and Kusiak, A., 1998. Modularity in design of products and systems. IEEE transactions on systems, man, and cybernetics, 28 (1), 66–77.10.1109/3468.650323
  • Doran, D., et al. 2007. Supply chain modularization: cases from the French automobile industry. International journal of production economics, 106 (1), 2–11.10.1016/j.ijpe.2006.04.006
  • Eisenhardt, K.M., 1989. Building theories from case study research. The academy of management review, 14 (4), 532–550.
  • Erixon, G., von Yxkull, A.V. and Arnström, A., 1996. Modularity–the basis for product and factory reengineering. CIRP annals-manufacturing technology, 45 (1), 1–6.10.1016/S0007-8506(07)63005-4
  • Fine, C.H., 1998. Clockspeed: winning industry control in the age of temporary advantage. New York, NY: Perseus Books.
  • Flyvbjerg, B., 2006. Five misunderstandings about case-study research. Qualitative inquiry, 12 (2), 219–245.10.1177/1077800405284363
  • Gibb, A.G.F., 1999. Off-site fabrication: prefabrication, pre-assembly and modularisation. New York, NY: John Wiley & Sons.
  • Gibb, A.G.F. and Isack, F., 2003. Re-engineering through pre-assembly: client expectations and drivers. Building research & information, 31 (2), 146–160.10.1080/09613210302000
  • Gosling, J., et al., 2016. Defining and categorizing modules in building projects: an international perspective. Journal of construction engineering and management, 04016062, 1–11.
  • Guðlaugsson, T.V., Ravn, P.M., and Mortensen, N.H. 2016 Modelling production system architectures in the early phases of product development. Concurrent engineering: research and applications, 25 (2), 1–15.
  • Haas, C.T., et al., 2000. Prefabrication and preassembly trends and effects on the construction workforce. Austin, TX: Center for Construction Industry Studies, University of Texas at Austin.
  • Hofman, E., Voordijk, H., and Halman, J., 2009. Matching supply networks to a modular product architecture in the house-building industry. Building research & information, 37 (1), 31–42.10.1080/09613210802628003
  • Hvam, L., Mortensen, N.H., and Riis, J., 2008. Product customization. Berlin and Heidelberg: Springer-Verlag.
  • Isaac, S., Bock, T., and Stoliar, Y., 2016. A methodology for the optimal modularization of building design. Automation in construction, 65, 116–124.10.1016/j.autcon.2015.12.017
  • Jansson, G., Johnsson, H., and Engström, D., 2014. Platform use in systems building. Construction management and economics, 32 (1-2), 70–82.10.1080/01446193.2013.793376
  • Jensen, P., Olofsson, T., and Johnsson, H., 2012. Configuration through the parameterization of building components. Automation in construction, 23, 1–8.10.1016/j.autcon.2011.11.016
  • Johnsson, H. and Meiling, J.H., 2009. Defects in offsite construction: timber module prefabrication. Construction management and economics, 27 (7), 667–681.10.1080/01446190903002797
  • Jonsson, H. and Rudberg, M., 2014. Classification of production systems for industrialized building: a production strategy perspective. Construction management and economics, 32 (1–2), 53–69.10.1080/01446193.2013.812226
  • Jonsson, H. and Rudberg, M., 2015. Production system classification matrix: matching product standardization and production-system design. Journal of construction engineering and management, 141 (6), 1–10.
  • Kusiak, A., 2002. Integrated product and process design: a modularity perspective. Journal of engineering design, 13 (3), 223–231.10.1080/09544820110108926
  • Lawson, R.M., Ogden, R.G., and Bergin, R., 2012. Application of modular construction in high-rise buildings. Journal of architectural engineering, 18 (2), 148–154.10.1061/(ASCE)AE.1943-5568.0000057
  • Mikkola, J.H., 2006. Capturing the degree of modularity embedded in product architectures. The journal of product innovation management, 23 (2), 128–146.10.1111/jpim.2006.23.issue-2
  • Miller, T.D. and Elgård, P. 1998. Defining modules, modularity and modularization: evolution of the concept in a historical perspective. 13th IPS Research Seminar. Fuglsoe: Aalborg University.
  • O’Connor, J.T., O’Brien, W.J., and Choi, J.O., 2014. Critical success factors and enablers for optimum and maximum industrial modularization. Journal of construction engineering and management, 140 (6), 1–11.
  • Pan, W., Gibb, A., and Dainty, A., 2007. Perspectives of UK housebuilders on the use of offsite modern methods of construction. Construction management and economics, 25 (2), 183–194.10.1080/01446190600827058
  • Pan, W., Gibb, A.G.F., and Sellars, A.B., 2008. Maintenance cost implications of utilizing bathroom modules manufactured off-site. Construction management and economics, 26, 1067–1077.10.1080/01446190802422161
  • Pasquire, C.L. and Gibb, A.G.F., 2002. Considerations for assessing the benefits of standardisation and pre-assembly in construction. Journal of financial management of property and construction, 7 (3), 151–161.
  • Poulis, K., Poulis, E., and Plakoyiannaki, E., 2013. The role of context in case study selection: an international business perspective. International business review, 22 (1), 304–314.10.1016/j.ibusrev.2012.04.003
  • Robertson, D. and Ulrich, K., 1998. Planning for product platforms. Sloan management review, 39 (4), 19.
  • Salvador, F., 2007. Toward a product system modularity construct: literature review and reconceptualization. IEEE transactions on engineering management, 54 (2), 219–240.10.1109/TEM.2007.893996
  • Salvador, F., Forza, C., and Rungtusanatham, M., 2002. Modularity, product variety, production volume, and component sourcing: theorizing beyond generic prescriptions. Journal of operations management, 20, 549–575.10.1016/S0272-6963(02)00027-X
  • Sanchez, R. and Mahoney, J.T., 1996. Modularity, flexibility, and knowledge management in product and organization design. Strategic management journal, 17 (S2), 63–76.10.1002/smj.4250171107
  • Schoenwitz, M., Naim, M., and Potter, A., 2012. The nature of choice in mass customized house building. Construction management and economics, 30, 203–219.10.1080/01446193.2012.664277
  • Skinner, W., 1985. Manufacturing: the formidable competitive weapon. New York, NY: John Wiley & Sons.
  • Styhre, A. and Gluch, P., 2010. Managing knowledge in platforms: boundary objects and stocks and flows of knowledge. Construction management and economics, 28, 589–599.10.1080/01446190903450061
  • Tatum, C.B., Vanegas, J.A., and Williams, J.M., 1987. Constructability improvement using prefabrication, preassembly, and modularization. Austin, TX: Bureau of Engineering Research, University of Texas at Austin.
  • Thuesen, C. and Hvam, L., 2011. Efficient on‐site construction: learning points from a german platform for housing. Construction Innovation, 11 (3), 338–355.10.1108/14714171111149043
  • Ulrich, K., 1995. The role of product architecture in the manufacturing firm. Research policy, 24 (3), 419–440.10.1016/0048-7333(94)00775-3
  • Voordijk, H., Meijboom, B., and de Haan, J., 2006. Modularity in supply chains: a multiple case study in the construction industry. International journal of operations & production management, 26 (6), 600–618.10.1108/01443570610666966
  • Wikberg, F., Olofsson, T., and Ekholm, A., 2014. Design configuration with architectural objects: linking customer requirements with system capabilities in industrialized house-building platforms. Construction management and economics, 32 (1–2), 196–207.10.1080/01446193.2013.864780
  • Yin, R.K., 2013. Case study research: design and methods. Beverly Hills, CA: Sage Publications.