Influence of risk mitigation measures on international construction project success criteria – a survey of Indian experiences

ORCID Icon, ORCID Icon & ORCID Icon
Pages 207-222 | Received 15 Oct 2018, Accepted 29 Jan 2019, Published online: 12 Mar 2019

References

  • Ahsan, K. and Gunawan, I., 2010. Analysis of cost and schedule performance of international development projects. International journal of project management, 28 (1), 68–78.
  • Akintoye, A.S. and MacLeod, M.J., 1997. Risk analysis and management in construction. International journal of project management, 15 (1), 31–38.
  • Al-Bahar, J.F. and Crandall, K.C., 1991. Systematic risk managament approach for construction projects. Journal of construction engineering and management, 116 (3), 533–546.
  • Al-Khattab, A., Anchor, J., and Davies, E., 2007. Managerial perceptions of political risk in international projects. International journal of project management, 25 (7), 734–743.
  • Al-Sabah, R., Menassa, C.C., and Hanna, A., 2014. Evaluating impact of construction risks in the Arabian Gulf region from perspective of multinational architecture, engineering and construction firms. Construction management and economics, 32 (4), 382–402.
  • Alon, I. and Herbert, T.T., 2009. A stranger in a strange land: micro political risk and the multinational firm. Business Horizons, 52 (2), 127–137.
  • Ashley, D.B. and Bonner, J.J., 1987. Political risks in international construction. Journal of construction engineering and management, 113 (3), 447–467.
  • Bing, B.L., et al., 1999. Risk management in international construction joint ventures. Journal of construction engineering and management, 125 (4), 277–284.
  • Bon, R. and Crosthwaite, D., 2001. The future of international construction: some results of 1992–1999 surveys. Building research and information, 29 (3), 242–247.
  • Chan, J.H.L., et al., 2012. Risk mitigation strategies for guaranteed maximum price and target cost contracts in construction. Journal of facilities management, 10 (1), 6–25.
  • Chen, Y.Q., et al., 2012. Interrelationships among critical success factors of construction projects based on the structural equation model. Journal of management in engineering, 28 (3), 243–251.
  • Cho, K., Hong, T., and Hyun, C., 2009. Effect of project characteristics on project performance in construction projects based on structural equation model. Expert Systems with Applications, 36 (7), 10461–10470.
  • Cooke-Davies, T., 2002. The ‘“real”’ success factors on projects. International journal of project management, 20 (3), 185–190.
  • Dandage, R., Mantha, S.S., and Rane, S.B., 2018. Ranking the risk categories in international projects using the TOPSIS method. International journal of managing projects in business, 11 (2), 317–331.
  • de Wit, A., 1988. Measurement of project success. International journal of project management, 6 (3), 164–170.
  • Deng, X. and Low, S.P., 2014. Exploring critical variables that affect political risk level in international construction projects: case study from Chinese contractors. Journal of professional issues in engineering education and practice, 140 (1), 1–11.
  • Deng, X., et al., 2014. Developing competitive advantages in political risk management for international construction enterprises. Journal of construction engineering and management, 140 (9), 04014040.
  • Deng, X., et al., 2018. Identifying micro variables contributing to political risks in international construction projects. Engineering, construction and architectural management, 25 (3), 317–334.
  • Diab, M.F., Varma, A., and Panthi, K., 2017. Modeling the construction risk ratings to estimate the contingency in highway projects. Journal of construction engineering and management, 143 (8), 04017041.
  • Dikmen, I., Birgonul, M.T., and Han, S., 2007. Using fuzzy risk assessment to rate cost overrun risk in international construction projects. International journal of project management, 25 (5), 494–505.
  • Doloi, H., Sawhney, A., and Iyer, K.C., 2012. Structural equation model for investigating factors affecting delay in Indian construction projects. Construction management and economics, 30 (10), 869–884.
  • El-adaway, I.H., et al., 2018. Contract administration guidelines for public infrastructure projects in the United States and Saudi Arabia: comparative analysis approach. Journal of construction engineering and management, 144 (6), 04018031.
  • El-Sayegh, S.M., 2008. Risk assessment and allocation in the UAE construction industry. International journal of project management, 26 (4), 431–438.
  • EXIM Bank, 2018. Annual Report of the Exim Bank of India, 2011–16. Available from: www.eximbankindia.in [Accessed 15 May 2018)
  • Eybpoosh, M., Dikmen, I. and Birgonul, M.T., 2011. Identification of risk paths in international construction projects using structural equation modeling. Journal of construction engineering and management, 137 (12), 1164–1175.
  • Gad, G.M., et al., 2013. Analytical framework for the choice of dispute resolution methods in international construction projects based on risk factors. Journal of legal affairs and dispute resolution in engineering and construction, 5 (1), 27–34.
  • Gao, R., et al., 2016. Workers’ perceptions of safety climate in international construction projects: effects of nationality, religious belief, and employment mode. Journal of construction engineering and management, 143 (4), 04016117.
  • Gibson, G.E.J., Kaczmarowski, J. and Lore, H.E.J., 1995. Preproject-planning process for capital facilities. Journal of construction engineering and management, 121 (3), 312–318.
  • Goh, E. and Loosemore, M., 2017. The impacts of industrialization on construction subcontractors: a resource based view. Construction management and economics, 35 (5), 288–304.
  • Gunduz, M., Nielsen, Y., and Ozdemir, M., 2013. Fuzzy assessment model to estimate the probability of delay in Turkish construction projects. Journal of management in engineering, 31 (4), 04014055.
  • Hair, J.F., et al., 2014. Multivariate Data Analysis. Essex: Pearson Education Limited.
  • Hammad, M.W., Abbasi, A., and Ryan, M.J., 2016. Allocation and management of cost contingency in projects. Journal of management in engineering, 32 (6), 04016014.
  • Han, S.H., et al., 2004. Multicriteria financial portfolio risk management for international projects. Journal of construction engineering and management, 130 (3), 346–356.
  • Han, S.H., Kim, D.Y., and Kim, H., 2007. Predicting profit performance for selecting candidate international construction projects. Journal of construction engineering and management, 133 (6), 425–436.
  • Han, S.H., et al., 2008. A web-based integrated system for international project risk management. Automation in construction, 17 (3), 342–356.
  • Hastak, M. and Shaked, A., 2000. ICRAM-1: model for international construction risk assesment. Journal of management in engineering, 16 (1), 59–69.
  • Hooper, D., Coughlan, J., and Mullen, M., 2008. Structural equation modelling: guidelines for determining model fit. Electronic journal of business research methods, 6 (1), 53–60.
  • Hsueh, S.L., et al., 2007. On-line multi-criterion risk assessment model for construction joint ventures in China. Automation in construction, 16 (5), 607–619.
  • Hwang, B.-G., Zhao, X., and Yu, G.S., 2016. Risk identification and allocation in underground rail construction joint ventures: contractors’ perspective. Journal of civil engineering and management, 22 (6), 758–767.
  • Isa, C.M.M., Saman, H.M., and Nasir, S.R.M., 2014. Specific-factors influencing market selection decision by Malaysian construction firms into international market. Procedia – social and behavioral sciences, 129, 4–10.
  • Jha, K.N. and Devaya, M.N., 2008. Modelling the risks faced by Indian construction companies assessing international projects. Construction management and economics, 26 (4), 337–348.
  • Kadry, M., Osman, H., and Georgy, M., 2017. Causes of construction delays in countries with high geopolitical risks. Journal of construction engineering and management, 143 (2), 04016095.
  • Kapila, P. and Hendrickson, C., 2001. Exchange rate risk management in international construction ventures. Journal of management in engineering, 17 (4), 186–191.
  • Lee, J.K., et al., 2018. Win-win strategy’ for sustainable relationship between general contractors and subcontractors in international construction projects. KSCE journal of civil engineering, 22 (2), 428–439.
  • Lee, N. and Schaufelberger, J.E., 2013. Risk management strategies for privatized infrastructure projects: Study of the build–operate–transfer approach in East Asia and the Pacific. Journal of management in engineering, 30 (3), 05014001.
  • Lee, S.-H., et al., 2011. Strategies for developing countries to expand their shares in the global construction market: phase-based SWOT and AAA analyses of Korea. Journal of construction engineering and management, 137 (6), 460–470.
  • Ling, F. and Lim, H.L., 2007. Foreign firms’ financial and economic risk in China. Engineering, Construction and Architectural Management, 14 (4), 346–362.
  • Ling, F.Y.Y. and Hoi, L., 2006. Risks faced by Singapore firms when undertaking construction projects in India. International journal of project management, 24 (3), 261–270.
  • Liu, J., Zhao, X., and Yan, P., 2016. Risk paths in international construction projects: case study from Chinese contractors. Journal of construction engineering and management, 142, 1–11.
  • Mahalingam, A. and Levitt, R.E., 2007. Institutional theory as a framework for analyzing conflicts on global projects. Journal of construction engineering and management, 133 (7), 517–528.
  • Mills, A., 2001. A systematic approach to risk management for construction. Structural Survey, 19 (5), 245–252.
  • Molwus, J.J., Erdogan, B., and Ogunlana, S.O., 2013. Sample size and model fit indices for structural equation modelling (SEM): the case of construction management research. ICCREM 2013 - the case of construction management research, bridges, ASCE, 338–347.
  • Nguyen, L.D., Ogunlana, S.O., and Lan, D.T.X., 2004. A study on project success factors in large construction projects in Vietnam. Engineering, construction and architectural management, 11 (6), 404–413.
  • Ofori, G., 2003. Frameworks for analysing international construction. Construction management and economics, 21 (4), 379–391.
  • Oke, A.E., Ogunsami, D.R., and Ogunlana, S., 2012. Establishing a common ground for the use of structural equation modelling for construction related research studies. Construction economics and building, 12 (3), 89–94.
  • Ozorhon, B., et al., 2008. Effect of partner fit in international construction joint ventures. Journal of management in engineering, 24 (1), 12–20.
  • Ozorhon, B., Dikmen, I., and Birgonul, M.T., 2006. Case-based reasoning model for international market selection. Journal of construction engineering and management, 132 (9), 940–948.
  • Patel, D.A. and Jha, K.N., 2016. Structural equation modeling for relationship-based determinants of safety performance in construction projects. Journal of management in engineering, 32 (3), 1–12.
  • Shi, S., et al., 2016. Examining the interrelationship among critical success factors of public private partnership infrastructure projects. Sustainability, 8 (12), 1313.
  • Smith, G.R. and Bohn, C.M., 1999. Small to medium contractor contingency and assumption of risk. Journal of construction engineering and management, 125 (2), 101–108.
  • Stephen, M. and Picken, D., 2000. Using risk analysis to determine construction project contingencies. Journal of construction engineering and management, 126 (2), 130–136.
  • Tabish, S.Z.S. and Jha, K.N., 2011. Identification and evaluation of success factors for public construction projects. Construction management and economics, 29 (8), 809–823.
  • Tabish, S.Z.S. and Jha, K.N., 2012. Success traits for a construction project. Journal of construction engineering and management, 138 (10), 1131–1139.
  • Tripathi, K.K. and Jha, K.N., 2017. An empirical study on performance measurement factors for construction organizations. KSCE journal of civil engineering, 1–15. doi:10.1007/s12205-017-1892-z.
  • Tripathi, K.K. and Jha, K.N., 2018. Determining success factors for a construction organization: a structural equation modeling approach. Journal of management in engineering, 34 (1), 04017050.
  • Ulubeyli, S., Kazaz, A., and Arslan, V., 2017. A structured selection process for small and medium enterprises in construction industry: case of international projects. Periodicals of engineering and natural sciences, 5 (3), 263–270.
  • Wang, S.Q., Dulaimi, M.F., and Aguria, M.Y., 2004. Risk management framework for construction projects in developing countries. Construction management and economics, 22 (3), 237–252.
  • Wong, P.S.P. and Cheung, S.O., 2005. Structural equation model of trust and partnering success. Journal of management in engineering, 21 (2), 70–80.
  • Wu, Z., et al., 2017. Risk factors for project success in the Chinese construction industry. Journal of manufacturing technology management, 28 (7), 850–866.
  • Xiaopeng, D. and Pheng, L.S., 2013. Understanding the critical variables affecting the level of political risks in international construction projects. KSCE journal of civil engineering, 17 (5), 895–907.
  • Xiong, B., Skitmore, M., and Xia, B., 2015. A critical review of structural equation modeling applications in construction research. Automation in construction, 49, 59–70.
  • Ye, M., et al., 2018. Diversification in the international construction business. Construction management and economics, 36 (6), 348–361.
  • Yildiz, A.E., et al., 2014. A knowledge-based risk mapping tool for cost estimation of international construction projects. Automation in construction, 43, 144–155.
  • Zhang, G. and Zou, P.X.W., 2007. Fuzzy analytical hierarchy process risk assessment approach for joint venture construction projects in China. Journal of construction engineering and management, 133 (10), 771–779.
  • Zhang, X., 2011. Social risks for international players in the construction market: a China study. Habitat International, 35 (3), 514–519.
  • Zhao, X., Hwang, B.G., and Yu, G.S., 2013. Identifying the critical risks in underground rail international construction joint ventures: case study of Singapore. International journal of project management, 31 (4), 554–566.
  • Zhao, Z.-Y., et al., 2017. Agglomeration and competitive position of contractors in the international construction sector. Journal of construction engineering and management, 143 (6), 04017004.
  • Zhi, H., 1995. Risk management for overseas construction projects. International journal of project management, 13 (4), 231–237.
  • Zou, P.X.W., Zhang, G., and Wang, J., 2007. Understanding the key risks in construction projects in China. International journal of project management, 25 (6), 601–614.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.