1,309
Views
10
CrossRef citations to date
0
Altmetric
Articles

Understanding the role of contractor capability in risk management: a comparative case study of two similar projects

ORCID Icon, ORCID Icon & ORCID Icon
Pages 223-238 | Received 17 May 2018, Accepted 27 Feb 2019, Published online: 11 Apr 2019

References

  • Aje, O.I., Odusami, K.T., and Ogunsemi, D.R., 2009. The impact of contractors’ management capability on cost and time performance of construction projects in Nigeria. Journal of financial management of property and construction, 14 (3), 171–187.
  • Alzahrani, J.I., and Emsley, M.W., 2013. The impact of contractors’ attributes on construction project success: A post construction evaluation. International journal of project management, 31 (2), 313–322.
  • Ballesteros-Pérez, P., et al., 2015. Climate and construction delays: case study in Chile. Engineering, construction and architectural management, 22 (6), 596–621.
  • Crispim, J., Silva, L.H., and Rego, N., 2018. Project risk management practices: the organizational maturity influence. International journal of managing projects in business. doi:10.1108/IJMPB-10-2017-0122
  • Dikmen, I., et al., 2018. Effects of risk attitude and controllability assumption on risk ratings: observational study on international construction project risk assessment. Journal of management in engineering, 34 (6), 04018037.
  • Doloi, H., 2009. Analysis of pre‐qualification criteria in contractor selection and their impacts on project success. Construction management and economics, 27 (12), 1245–1263.
  • Doloi, H., 2013. Cost overruns and failure in project management: understanding the roles of key stakeholders in construction projects. Journal of construction engineering and management, 139 (3), 267–279.
  • Doloi, H., Iyer, K.C., and Sawhney, A., 2011. Structural equation model for assessing impacts of contractors performance on project success. International journal of project management, 29 (6), 687–695.
  • Eisenhardt, K.M., 1989. Building theories from case study research. Academic of management review, 14 (4), 532–550.
  • El-Sawalhi, N., Eaton, D., and Rustom, R., 2007. Contractor pre-qualification model: state-of-the-art. International journal of project management, 25 (5), 465–474.
  • Hassanein, A.A.G., and Afify, H.M.F., 2007. Risk management practices of contractors: a case study of power station projects in Egypt. Journal of financial management of property and construction, 12 (3), 164–179.
  • Hatush, Z., and Skitmore, M., 1997. Criteria for contractor selection. Construction management and economics, 15 (1), 19–38.
  • Heravi, G., and Hajihoseini, Z., 2012. Risk allocation in public-private partnership infrastructure projects in developing countries: case study of the Tehran–Chalus toll road. Journal of Infrastructure Systems, 18 (3), 210–217.
  • Holt, G.D., Olomolaiye, P.O., and Harris, F.C., 1995. A review of contractor selection practice in the U.K. construction industry. Building and environment, 30 (4), 553–561.
  • International Organization for Standardization, 2009. ISO 73: 2009 Risk Management Vocabulary, Generva: ISO.
  • Jha, K.N., and Devaya, M.N., 2008. Modelling the risks faced by Indian construction companies assessing international projects. Construction management and economics, 26 (4), 337–348.
  • Kasabreh, N.S.S., and Tarawneh, S.A., 2019. Investigating the impact of contractor’s performance on the success of Jordanian residential construction projects. International journal of construction management, 1-8. doi:10.1080/15623599.2018.1560547
  • Kumar, R., Iyer, K. C., and Singh, S. P., 2017. 2017. Quantification of construction project risks by analysis of past dispute cases. In: P.W. Chan and C.J. Neilson, eds. Proceedings of the 33rd Annual ARCOM Conference, 4–6 September. Cambridge, UK, Association of Researchers in Construction Management, 532–541.
  • Latham, S.M., 1994. Constructing the team. Joint Government/Industry review of procurement and contractual arrangements in the United Kingdom construction industry. Final report. London: H.M.S.O., 50–52.
  • Leiringer, R., and Dainty, A., 2017. Construction management and economics: new directions. Construction management and economics, 35 (11–12), 655–656.
  • Ling, F.Y.Y., and Hoang, V.T.P., 2010. Political, economic, and legal risks faced in international projects: case study of Vietnam. Journal of professional issues in engineering education and practice, 136 (3), 156–164.
  • Liu, J., Zhao, X., and Yan, P., 2016. Risk paths in international construction projects: case study from Chinese contractors. Journal of construction engineering and management, 142 (6), 1–11.
  • Mahalingam, A., 2010. PPP experiences in Indian cities: barriers, enablers, and the way forward. Journal of construction engineering and management, 136 (4), 419–429.
  • Mu, S., et al., 2014. Assessing risk management capability of contractors in subway projects in mainland China. International journal of project management, 32 (3), 452–460.
  • Perera, B.A.K.S., Dhanasinghe, I., and Rameezdeen, R., 2009. Risk management in road construction: the case of Sri Lanka. International journal of strategic property management, 13 (2), 87–102.
  • Pongpeng, J., and Liston, J., 2003. Contractor ability criteria: a view from the Thai construction industry. Construction management and economics, 21 (3), 267–282.
  • Semaan, N., and Salem, M., 2017. A deterministic contractor selection decision support system for competitive bidding. Engineering, construction and architectural management, 24 (1), 61–77.
  • Song, J., Hu, Y., and Feng, Z., 2018. Factors affecting early termination of PPP projects in China. Journal of management in engineering, 34 (1), 1–10.
  • Subramanyan, H., Sawant, P.H., and Bhatt, V., 2012. Construction project risk assessment: Development of model based on investigation of opinion of construction project experts from India. Journal of construction engineering and management, 138 (3), 409–421.
  • Sun, C., et al., 2017. Critical risk identification for PPP waste-to-energy incineration projects in China: a multiple case study. In: Wang Y., et al., eds. International conference on construction and real estate management, 10–12 November 2017. Guangzhou, China: ASCE, 328–338.
  • Taroun, A., 2014. Towards a better modelling and assessment of construction risk: insights from a literature review. International journal of project management, 32 (1), 101–115.
  • Taylor, J.E., Dossick, C.S., and Garvin, M., 2011. Meeting the burden of proof with case-study research. Journal of construction engineering and management, 137 (4), 303–311.
  • Wang, M.T., and Chou, H.Y., 2003. Risk allocation and risk handling of highway projects in Taiwan. Journal of management in engineering, 19 (2), 60–68.
  • Wang, N., 2011. Risk allocation in operational stage of private finance initiative projects. Journal of Performance of Constructed Facilities, 25 (6), 598–605.
  • Wang, T., et al., 2016. Relationships among risk management, partnering, and contractor capability in international EPC project delivery. Journal of management in engineering, 32 (6), 1–10.
  • Yin, R.K., 2014. Case study research: design and methods. 5th ed. UK: Sage.
  • Zou, P.X.W., Chen, Y., and Chan, T., 2010. Understanding and improving your risk management capability: Assessment model for construction organization. Journal of construction engineering and management, 136 (8), 854–863.
  • Zou, P.X.W., and Li, J., 2010. Risk identification and assessment in subway projects: case study of Nanjing Subway Line 2. Construction management and economics, 28 (12), 1219–1238.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.