3,456
Views
10
CrossRef citations to date
0
Altmetric
Articles

Infrastructure maintenance and replacement optimization under multiple uncertainties and managerial flexibility

, , &
Pages 91-107 | Received 23 Jun 2019, Accepted 23 Sep 2019, Published online: 15 Oct 2019

References

  • ACM., 2017. WACC drinkwater 2018-2019 (WACC drinking water 2018–2019). The Hague, The Netherlands: Authority for Consumers and Markets.
  • Adey, B.T., Burkhalter, M., and Lethanh, N., 2018. Determining an optimal set of work zones on large infrastructure networks in a GIS framework. Journal of infrastructure systems, 24(1), 04017048.
  • Almeida, J.O., Teixeira, P.F., and Delgado, R.M., 2015. Life cycle cost optimization in highway concrete bridges management. Structure and infrastructure engineering, 11, 1263–1276.
  • Ascher, H., 2007. Different insights for improving part and system reliability obtained from exactly same DFOM “failure numbers. Reliability engineering & system safety, 92, 552–559.
  • Ascher, H., and Feingold, H., 1984. Repairable systems reliability. New York, NY: Marcel Dekker, Inc.
  • AWWA., 2019. 2018 State of the water industry report reveals long-term trends. Available from: https://www.awwa.org/Portals/0/AWWA/Development/Managers/2018_SOTWI_Report_Final_v3.pdf [Accessed 30 July 2019].
  • Baik, H.-S., Seok Jeong, H., and Abraham, D.M., 2006. Estimating transition probabilities in Markov chain-based deterioration models for management of wastewater systems. Journal of water resources planning and management, 132, 15–24.
  • Black, F., and Scholes, M., 1973. The pricing of options and corporate liabilities. Journal of political economy, 81, 637–654.
  • Brealey, R.E., Myers, S.C., and Allen, F., 2017. Principles of corporate finance. 12th ed. New York, NY: McGraw-Hill Education.
  • Buyukyoran, F., and Gundes, S., 2018. Optimized real options-based approach for government guarantees in PPP toll road projects. Construction management and economics, 36, 203–216.
  • Carbonara, N., and Pellegrino, R., 2018. Revenue guarantee in public-private partnerships: a win-win model. Construction management and economics, 36, 584–598.
  • Cardin, M.-A., Neufville, R., and Geltner, D.M., 2015. Design catalogs: a systematic approach to design and value flexibility in engineering systems. Systems engineering, 18, 453–471.
  • CBS Stateline, 2018. Civil engineering works; input price index 2000 = 100, from 1979 [online]. The Netherlands, CBS. Available from: https://opendata.cbs.nl/statline/#/CBS/en/dataset/81139eng/table?ts=1547989906393 [Accessed 20 January 2019].
  • Compare, M., Martini, F., and Zio, E., 2015. Genetic algorithms for condition-based maintenance optimization under uncertainty. European journal of operational research, 244, 611–623.
  • Copeland, T., and Antikarov V., 2003. Real options. A practitioner's guide. London, UK: The Penguin Group.
  • Costello, S.B., et al., 2005. Stochastic model for strategic assessment of road maintenance. Proceedings of the institution of civil engineers - transport, 158, 203–211.
  • Cox, J.C., Ross, S.A., and Rubinstein, M. 1979. Option pricing: a simplified approach. Journal of financial economics, 7, 229.
  • CROW., 2018. Indexen risicoregelingen GWW [online]. The Netherlands, CROW. Available from: https://www.crow.nl/publicaties/indexen-risicoregelingen-gww [Accessed 30 July 2019].
  • De Neufville, R., and Scholtes, S., 2011. Flexibility in engineering design. Cambridge, MA: Massachusetts Institute of Technology.
  • Elcheikh, M., Al Sheikh, D., and Burrow, M.P.N., 2013. Project appraisal of rail projects using fuzzy sets theory. International journal of railway technology, 2, 32–62.
  • Elcheikh, M., and Michael, P.N.B., 2017. Uncertainties in forecasting maintenance costs for asset management: application to an aging canal system. ASCE-ASME journal of risk and uncertainty in engineering systems, part A: civil engineering, 3, 04016014.
  • Faddoul, R., Raphael, W., and Chateauneuf, A., 2011. A generalised partially observable Markov decision process updated by decision trees for maintenance optimization. Structure and infrastructure engineering, 7, 783–796.
  • Faghih Sayed Amir, M., and Kashani, H., 2018. Forecasting construction material prices using vector error correction model. Journal of construction engineering and management, 144, 04018075.
  • Farida Agustini, W., Affianti, I.R., and Putri, E.R.M., 2018. Stock price prediction using geometric Brownian motion. Journal of physics: conference series, 974, 012047.
  • Feng, Z., Zhang, S.-B., and Gao, Y., 2015. Modeling the impact of government guarantees on toll charge, road quality and capacity for build-operate-transfer (BOT) road projects. Transportation research part A: policy and practice, 78, 54–67.
  • FHWA. 2019. Conditions and performance [online]. Washington, DC, FHWA. Available from: https://www.fhwa.dot.gov/policy/2013cpr/chap12.cfm [Accessed 30 July 2019].
  • Ford, D.N., Lander, D.M., and Voyer, J.J., 2002. A real options approach to valuing strategic flexibility in uncertain construction projects. Construction management and economics, 20, 343–351.
  • Francis, J.C., and Kim, D., 2013. Modern portfolio theory: foundations, analysis, and new developments + website. Hoboken, NJ: Wiley.
  • Frangopol, D., 2011. Life-cycle performance, management, and optimization of structural systems under uncertainty: accomplishments and challenges. Structure and infrastructure engineering, 7, 389–413.
  • Frangopol, D.M., Kallen, M.-J., and van Noortwijk, J.M., 2004. Probabilistic models for life-cycle performance of deteriorating structures: review and future directions. Progress in structural engineering and materials, 6, 197–212.
  • Guthrie, G., 2009. Real options in theory and practice. Oxford, UK: Oxford University Press.
  • Haffner, J.D., and Gennady, E.M., 2011. Water infrastructure issues. New York, NY: Nova Science Publishers.
  • Hall, J.W., et al., 2016. The future of national infrastructure: A system-of-systems approach. Cambridge, UK: Cambridge University Press.
  • Hillier, F.S., and Lieberman, G.J., 2010. Introduction to operations research. Boston, MA: McGraw-Hill.
  • Ilbeigi, M., Castro-Lacouture, D., and Joukar, A., 2017. Generalized autoregressive conditional heteroscedasticity model to quantify and forecast uncertainty in the price of asphalt cement. Journal of management in engineering, 33, 04017026.
  • Ilg, P., Scope, C., Muench, S., and Guenther, E., 2017. Uncertainty in life cycle costing for long-range infrastructure. Part I: leveling the playing field to address uncertainties. The international journal of life cycle assessment, 22, 277–292.
  • Kim, K., Park, T., Bang, S., and Kim, H., 2017. Real options-based framework for hydropower plant adaptation to climate change. Journal of management in engineering, 33, 04016049.
  • Klatter, L., Vrouwenvelder, T., and van Noortwijk, J., 2009. Societal and reliability aspects of bridge management in the Netherlands. Structure and Infrastructure Engineering, 5, 11–24.
  • Kolobov, M., and Kolobov, A., 2012. Planning with Markov decision processes: an AI perspective. San Rafael, CA: Morgan and Claypool.
  • Lander, D.M., and Pinches, G.E., 1998. Challenges to the practical implementation of modeling and valuing real options. The quarterly review of economics and finance, 38, 537–567.
  • Lange, D.A., 2018. The relevance of ageing for civil infrastructure: The profession, the politics, the classroom. In: v.B. Klaas, D. Koleva, and T. van Beek, eds., The ageing of materials and structures: towards scientific solutions for the ageing of our assets. Cham, Switzerland: Springer International Publishing.
  • Leira, B.J., 2013. Optimal stochastic control schemes within a structural reliability framework. New York, NY: Springer International Publishing.
  • Lethanh, N, Hackl, J., and Adey, B.T., 2017. Determination of Markov transition probabilities to be used in bridge management from mechanistic-empirical models. Journal of bridge engineering, 22(10), 4017063.
  • Lin, P., Yuan, X.‐X., and Tovilla, E., 2019. Integrative modeling of performance deterioration and maintenance effectiveness for infrastructure assets with missing condition data. Computer-aided civil and infrastructure engineering, 34, 677–695.
  • Liu, J., Gao, R., and Yuen, J.C.C., 2017. Pricing mechanism of early termination of PPP projects based on real option theory. Journal of management in engineering, 33, 04017035.
  • Maier, S., Polak, J.W., and Gann, D.M., 2018. Valuing portfolios of interdependent real options using influence diagrams and simulation-and-regression: a multi-stage stochastic integer programming approach. Computers and operations research, 104505. doi:10.1016/j.cor.2018.06.017
  • Markowitz, H., 1952. Portfolio selection. The journal of finance, 7, 77–91.
  • Martani, C., Cattarinussi, L., and Adey, B.T., 2018. A new process for the evaluation of the net-benefit of flexible ground-floor ceiling in the face of use transition uncertainty. Journal of building engineering, 15, 156–170.
  • Masteri, K., Venkatesh, B., and Freitas, W., 2018. A fuzzy optimization model for distribution system asset planning with energy storage. IEEE transactions on power systems, 33(5), 5114–5123.
  • McGregor, S., et al., 2017. Interactive visualization for testing Markov Decision Processes: MDPVIS. Journal of visual languages & computing, 39, 93–106.
  • Merton, R.C., 1973. Theory of rational option pricing. The Bell journal of economics and management science, 4, 141–183.
  • Mirzadeh, I., Butt, A.A., Toller, S., and Birgisson, B., 2014. Life cycle cost analysis based on the fundamental cost contributors for asphalt pavements. Structure and infrastructure engineering, 10, 1638–1647.
  • Mohanta, D.K., Sadhu, P.K., and Chakrabarti, R, IEEE PES Power Systems Conference, and GA USA Exposition Atlanta., 2005. Fuzzy Markov model for determination of fuzzy state probabilities of generating units including the effect of maintenance scheduling. IEEE transactions on power systems, 20(4), 2117–2124.
  • Mun, J., 2006. Real options analysis. Tools and techniques for valuing strategic investment and decisions. Hoboken, NJ: Wiley Finance Series - Wiley & Sons.
  • NEN-EN., 1990. Eurocode: Basis of structural design. Delft, The Netherlands: Normalisatie Instituut.
  • NEN 8700., 2011. Beoordeling van de constructieve veiligheid van een bestaand bouwwerk bij verbouw en afkeuren - Grondslagen (Assessment of existing structures in case of reconstruction and disapproval - Basic Rules). Delft, The Netherlands: Normalisatie Instituut.
  • Oliveira, J.R.M., et al., 2017. Two-Stage multiobjective optimization of maintenance scheduling for pavements. Journal of infrastructure systems, 23(3). doi:10.1061/(ASCE)IS.1943-555X.0000355
  • Orcesi, A., 2016. CEDR transnational road research programme: re-gen risk assessment of ageing infrastructure. Brussels, Belgium: CEDR Transnational Road Research Programme.
  • Park, T., Kim, B., and Kim, H., 2012. Impact of deterioration and negotiation on sewer system O&M contracts from the real option perspective. Water resources management, 26, 2973–2989.
  • Pascual, R., Ortega, J.H., and Qualita, N.F., 2006. Optimal replacement and overhaul decisions with imperfect maintenance and warranty contracts. Reliability engineering & system safety, 91, 241–248.
  • Pellegrino, R., et al., 2011. A real options-based model to supporting risk allocation in price cap regulation approach for public utilities. Construction management and economics, 29, 1197.
  • Power, G.J., et al., 2016. Valuation of strategic options in public-private partnerships. Transportation research Part A: policy and practice, 90, 50–68.
  • Puterman, M. L., 1994. Markov decision processes: discrete stochastic dynamic programming. New York, NY: Wiley.
  • Rehan, R., et al., 2016. Development of unit cost indices and database for water and wastewater pipelines capital works. Journal of cost analysis and parametrics, 9, 127–160.
  • Rigdon, S.E., and Basu, A.P., 2000. Statistical methods for the reliability of repairable systems. New York, NY: John Wiley & Sons, Inc.
  • Robelin, C.-A., and Madanat, S.M., 2007. History-dependent bridge deck maintenance and replacement optimization with Markov decision processes. Journal of infrastructure systems, 13, 195–201.
  • Rubinstein, M., 1994. Implied binomial trees. The journal of finance, 49, 771–818.
  • Sánchez-Silva, M., and Georgia-Ann, K., 2016. Reliability and life-cycle analysis of deteriorating systems. New York, NY: Springer International Publishing.
  • Scope, C., Ilg, P., Muench, S., and Guenther, E., 2016. Uncertainty in life cycle costing for long-range infrastructure. Part II: guidance and suitability of applied methods to address uncertainty. The international journal of life cycle assessment, 21, 1170–1184.
  • Shafiee, M., Finkelstein, M., and Chukova, S., 2011. Burn-in and imperfect preventive maintenance strategies for warranted products. Proceedings of the institution of mechanical engineers, part O: journal of risk and reliability, 225, 211–218.
  • Sinha, K.C., Labi, S., and Agbelie, B.R.D.K., 2017. Transportation infrastructure asset management in the new millennium: continuing issues, and emerging challenges and opportunities. Transportmetrica A: transport science, 13, 591–606.
  • Stewart, M.G., 2001. Reliability-based assessment of ageing bridges using risk ranking and life cycle cost decision analyses. Reliability engineering & system safety, 74, 263–273.
  • Swei, O., Gregory, J., and Kirchain, R., 2017. Probabilistic approach for long-run price projections: case study of concrete and asphalt. Journal of construction engineering and management, 143, 05016018.
  • Van den Boomen, M., et al., 2018. Untangling decision tree and real options analyses: a public infrastructure case study dealing with political decisions, structural integrity and price uncertainty. Construction management and economics, 37, 24–43.
  • Van den Boomen, M., van den Berg, P.L., and Wolfert, A.R.M., 2019. A dynamic programming approach for economic optimization of lifetime-extending maintenance, renovation, and replacement of public infrastructure assets under differential inflation. Structure and infrastructure engineering, 15(2), 193–205.
  • Walraven, E.M.P., and Spaan, M.T.J., 2018. Column generation algorithms for constrained POMDPs. Journal of artificial intelligence research, 62, 489–533.
  • Wirahadikusumah, R., Abraham, D.M., and Castello, J., 1999. Markov decision process for sewer rehabilitation. Engineering, construction and architectural management, 6, 358–370.
  • Woodward, M., Kapelan, Z., and Gouldby, B., 2014. Adaptive flood risk management under climate change uncertainty using real options and optimization. Risk analysis: an official publication of the society for risk analysis, 34, 75–92.
  • Younis, R., et al., 2016. Forecasting the unit price of water and wastewater pipelines capital works and estimating contractors’ markup. Journal of cost analysis and parametrics, 9, 46–68.
  • Yu, M.K.W., and Ive, G., 2011. Orders and output in UK construction statistics: new methodology and old problems. Construction management and economics, 29, 653.