References
- Aghbashlo, M., Hosseinpour, S., & Ghasemi-Varnamkhasti, M. (2014). Computer vision technology for real-time food quality assurance during drying process. Trends in Food Science & Technology, 39(1), 76–84.10.1016/j.tifs.2014.06.003
- Anily, S., & Grosfeld-Nir, A. (2006). An optimal lot-sizing and offline inspection policy in the case of nonrigid demand. Operations Research, 54(2), 311–323.10.1287/opre.1050.0258
- Cárdenas-Barrón, L. E. (2008). Optimal manufacturing batch size with rework in a single-stage production system – A simple derivation. Computers & Industrial Engineering, 55(4), 758–765.10.1016/j.cie.2007.07.017
- Cárdenas-Barrón, L. E. (2009). Economic production quantity with rework process at a single-stage manufacturing system with planned backorders. Computers & Industrial Engineering, 57(3), 1105–1113.10.1016/j.cie.2009.04.020
- Cárdenas-Barrón, L. E., Taleizadeh, A. A., & Treviño-Garza, G. (2012). An improved solution to replenishment lot size problem with discontinuous issuing policy and rework, and the multi-delivery policy into economic production lot size problem with partial rework. Expert Systems with Applications, 39(18), 13540–13546.10.1016/j.eswa.2012.07.012
- Cárdenas-Barrón, L. E., Chung, K. J., & Treviño-Garza, G. (2014). Celebrating a century of the economic order quantity model in honor of Ford Whitman Harris. International Journal of Production Economics, 155, 1–7.
- Christer, A. H., & Waller, W. M. (1984). Delay time models of industrial inspection maintenance problems. Journal of the Operational Research Society, 35(5), 401–406.10.1057/jors.1984.80
- Djamaludin, I., Murthy, D. N. P., & Wilson, R. J. (1994). Quality control through lot sizing for items sold with warranty. International Journal of Production Economics, 33, 97–107.10.1016/0925-5273(94)90123-6
- Goyal, S. K., & Cárdenas-Barrón, L. E. (2002). Note on: Economic production quantity model for items with imperfect quality–a practical approach. International Journal of Production Economics, 77(1), 85–87.10.1016/S0925-5273(01)00203-1
- Hu, F., & Zong, Q. (2009). Optimal production run time for a deteriorating production system under an extended inspection policy. European Journal of Operational Research, 196(3), 979–986.10.1016/j.ejor.2008.05.008
- Khan, M., Jaber, M. Y., & Bonney, M. (2011). An economic order quantity (EOQ) for items with imperfect quality and inspection errors. International Journal of Production Economics, 133(1), 113–118.10.1016/j.ijpe.2010.01.023
- Khan, M., Jaber, M. Y., & Wahab, M. I. M. (2010). Economic order quantity model for items with imperfect quality with learning in inspection. International Journal of Production Economics, 124(1), 87–96.10.1016/j.ijpe.2009.10.011
- Moussawi-Haidar, L., Salameh, M., & Nasr, W. (2013). An instantaneous replenishment model under the effect of a sampling policy for defective items. Applied Mathematical Modelling, 37(3), 719–727.10.1016/j.apm.2012.02.030
- Porteus, E. L. (1986). Optimal lot sizing, process quality improvement and setup cost reduction. Operations Research, 34, 137–144.10.1287/opre.34.1.137
- Porteus, E. L. (1990). The impact of inspection delay on process and inspection lot sizing. Management Science, 36(8), 999–1007.10.1287/mnsc.36.8.999
- Puri, P. S., & Singh, H. (1986). Optimum replacement of a system subject to shocks: A mathematical lemma. Operations Research, 34(5), 782–789.10.1287/opre.34.5.782
- Qin, R., Cudney, E. A., & Hamzic, Z. (2015). An optimal plan of zero-defect single-sampling by attributes for incoming inspections in assembly lines. European Journal of Operational Research, 246(3), 907–915.10.1016/j.ejor.2015.05.054
- Ronald, R., Yang, G. K., & Chu, P. (2004). Technical note: The EOQ and EPQ models with shortages derived without derivatives. International Journal of Production Economics, 92(2), 197–200.10.1016/j.ijpe.2003.10.013
- Rosenblatt, M. J., & Lee, H. L. (1986). Economic production cycles with imperfect production process. IIE Transactions, 18, 48–55.10.1080/07408178608975329
- Salameh, M. K., & Jaber, M. Y. (2000). Economic production quantity model for items with imperfect quality. International Journal of Production Economics, 64, 59–64.10.1016/S0925-5273(99)00044-4
- Shih, N. H., & Wang, C. H. (2013). An extended production and inspection model with non-rigid demand. The Scientific World Journal, 2013, 7, Article ID 623075.
- Taleizadeh, A. A., Kalantari, S. S., & Cárdenas-Barrón, L. E. (2015). Determining optimal price, replenishment lot size and number of shipments for an EPQ model with rework and multiple shipments. Journal of Industrial and Management Optimization, 11(4), 1059–1071.10.3934/jimo
- Taleizadeh, A. A., Noori-daryan, M., & Cárdenas-Barrón, L. E. (2015). Joint optimization of price, replenishment frequency, replenishment cycle and production rate in vendor managed inventory system with deteriorating items. International Journal of Production Economics, 159, 285–295.10.1016/j.ijpe.2014.09.009
- Taleizadeh, A. A., Kalantari, S. S., & Cárdenas-Barrón, L. E. (2016). Pricing and lot sizing for an EPQ inventory model with rework and multiple shipments. TOP, 24, 143–155.10.1007/s11750-015-0377-9
- Wang, C. H., & Sheu, S. H. (2003). Optimal lot sizing for products sold under free-repair warranty. European Journal of Operational Research, 149, 131–141.10.1016/S0377-2217(02)00429-0
- Yeh, R. H., & Chen, T. H. (2006). Optimal lot size and inspection policy for products sold with warranty. European Journal of Operational Research, 174(2), 766–776.10.1016/j.ejor.2005.02.049
- Yeh, R. H., Ho, W. T., & Tseng, S. T. (2000). Optimal production run length for products sold with warranty. European Journal of Operational Research, 120, 575–582.10.1016/S0377-2217(99)00004-1
- Yeh, R. H., & Lo, H. C. (1998). Quality control for products under free-repair warranty. International Journal of Operations and Quantitative Management, 4(3), 265–275.
- Yoo, S. H., Kim, D. S., & Park, M. S. (2009). Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return. International Journal of Production Economics, 121(1), 255–265.10.1016/j.ijpe.2009.05.008