Solving the FS-RCPSP with hyper-heuristics: A policy-driven approach

, , &
Pages 403-419 | Received 09 Nov 2016, Accepted 12 Feb 2018, Published online: 05 Mar 2018

References

  • Alcaraz, J., & Maroto, C. (2001). A robust genetic algorithm for resource allocation in project scheduling. Annals of Operations Research, 102, 83–109.10.1023/A:1010949931021
  • Alipouri, Y., Sebt, M. H., Ardeshir, A., & Fazel Zarandi, M. H. (2017). A mixed-integer linear programming model for solving fuzzy stochastic resource constrained project scheduling problem. Operational Research: An International Journal, 1–12. doi:10.1007/s12351-017-0321-x
  • Anagnostopoulos, K., & Koulinas, G. (2012). Resource-constrained critical path scheduling by a GRASP-based hyperheuristic. Journal of Computing in Civil Engineering, 26(2), 204–213.10.1061/(ASCE)CP.1943-5487.0000116
  • Anagnostopoulos, K. P., & Koulinas, G. K. (2010). A genetic hyperheuristic algorithm for the resource constrained project scheduling problem. In Proceedings of the 2010 IEEE Congress on Evolutionary Computation, CEC 2010. Barcelona: IEEE Computer Society Press.
  • Artigues, C., Leus, R., & Talla Nobibon, F. T. (2013). Robust optimization for resource-constrained project scheduling with uncertain activity durations. Flexible Services and Manufacturing Journal, 25(1–2), 175–205.10.1007/s10696-012-9147-2
  • Artigues, C., Michelon, P., & Reusser, S. (2003). Insertion techniques for static and dynamic resource-constrained project scheduling. European Journal of Operational Research, 149, 249–267.10.1016/S0377-2217(02)00758-0
  • Boctor, F. F. (1990). Some efficient multi-heuristic procedures for resource-constrained project scheduling. European Journal of Operational Research, 49, 3–13.10.1016/0377-2217(90)90116-S
  • Bruni, M. E., Di Puglia, L., Beraldi, P., & Guerriero, F. (2017). An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations. Omega, 71, 66–84.10.1016/j.omega.2016.09.009
  • Buckley, J. J. (2005). Fuzzy probability: New approach and applications. Studies in Fuzziness and Soft Computing Series. Berlin Heidelberg: Springer-Verlag.
  • Buckley, J. J., & Feuring, T. (2000). Evolutionary algorithm solution to fuzzy problems: Fuzzy linear programming. Fuzzy Sets and Systems, 109, 35–53.10.1016/S0165-0114(98)00022-0
  • Burke, E. K., Gendreau, M., Hyde, M., Kendall, G., Ochoa, G., Özcan, E., & Qu, R. (2013). Hyper-heuristics: A survey of the state of the art. Journal of the Operational Research Society, 64, 1695–1724.10.1057/jors.2013.71
  • Chakrabortty, R. K., Sarker, R. A., & Essam, D. L. (2017). Resource constrained project scheduling with uncertain activity durations. Computers and Industrial Engineering, 112, 537–550.10.1016/j.cie.2016.12.040
  • Damay, J., Quilliot, A., & Sanlaville, E. (2007). Linear programming based algorithms for preemptive and non-preemptive RCPSP. European Journal of Operational Research, 182, 1012–1022.10.1016/j.ejor.2006.09.052
  • Davari, M., & Demeulemeester, E. (2017). The proactive and reactive resource-constrained project scheduling problem. Journal of Scheduling, 1–27. doi:10.1007/s10951-017-0553-x
  • Demeulemeester, E. L., & Herroelen, W. S. (2002). Project scheduling: A research handbook. In International series in operations research and management science (Vol. 49). Kluwer Academic Publishers (now Springer).
  • Dorndorf, U., Pesch, E., & Phan-Huy, T. (2000). A branch-and-bound algorithm for the resource-constrained project scheduling problem. Mathematical Methods of Operations Research (ZOR), 52, 413–439.10.1007/s001860000091
  • Elsayed, S., Sarker, R., Ray, T., & Coello, C. C. (2017). Consolidated optimization algorithm for resource-constrained project scheduling problems. Information Sciences, 418–419, 346–362.10.1016/j.ins.2017.08.023
  • Fang, C., Kolisch, R., Wang, L., & Chundi, M. (2015). An estimation of distribution algorithm and new computational results for the stochastic resource-constrained project scheduling problem. Flexible Services and Manufacturing Journal, 27(4), 585–605.10.1007/s10696-015-9210-x
  • Fleszar, K., & Hindi, K. (2004). Solving the resource-constrained project scheduling problem by a variable neighbourhood search. European Journal of Operational Research, 155, 402–413.10.1016/S0377-2217(02)00884-6
  • Herroelen, W., & Leus, R. (2005). Project scheduling under uncertainty: Survey and research potentials. European Journal of Operational Research, 165, 289–306.10.1016/j.ejor.2004.04.002
  • Hirota, K. (1981). Concepts of probabilistic sets. Fuzzy event. Journal of Mathematical Analysis and Applications, 23, 421–427.
  • Huang, W., Ding, L., Wen, B., & Cao, B. (2009). Project scheduling problem for software development with random fuzzy activity duration times. Berlin Heidelberg: Springer-Verlag.10.1007/978-3-642-01510-6
  • Itoh, T., & Ishii, H. (2005). One machine scheduling problem with fuzzy random due-dates. Fuzzy Optimization and Decision Making, 4, 71–78.10.1007/s10700-004-5571-4
  • Ke, H., & Liu, B. (2007). Project scheduling problem with mixed uncertainty of randomness and fuzziness. European Journal of Operational Research., 183, 135–147.10.1016/j.ejor.2006.09.055
  • Koulinas, G., Kotsikas, L., & Anagnostopoulos, K. (2014). A particle swarm optimization based hyper-heuristic algorithm for the classic resource constrained project scheduling problem. Information Sciences, 277, 680–693.10.1016/j.ins.2014.02.155
  • Kruse, R., & Meyer, K. D. (1987). Statistics with vague data. Dordrecht: D. Reidel Publishing Company.10.1007/978-94-009-3943-1
  • Liu, B. (2002a). Theory and practice of uncertainty programming. Heidelberg: Physica-Verlag.10.1007/978-3-7908-1781-2
  • Liu, B. (2002b). Random fuzzy dependent-chance programming and its hybrid intelligent algorithm. Information Sciences, 141, 259–271.10.1016/S0020-0255(02)00176-7
  • Mahalleh, M. K. K., Ashjari, B., Yousefi, F., & Saberi, M. (2017). A robust solution to resource-constraint project scheduling problem. International Journal of Fuzzy Logic and Intelligent Systems, 17(3), 221–227.10.5391/IJFIS.2017.17.3.221
  • Nematian, J., Eshghi, K., & Eshragh-Jahromi, A. (2010). A resource-constrained project scheduling problem with fuzzy random duration. Journal of Uncertain Systems, 4(2), 123–132.
  • Özdamar, L., & Ulusoy, G. (1994). A local constraint based analysis approach to project scheduling under general resource constraints. European Journal of Operational Research, 79, 287–298.10.1016/0377-2217(94)90359-X
  • Palpant, M., Artigues, C., & Michelon, P. (2004). LSSPER: Solving the resource-constrained project scheduling problem with large neighbourhood search. Annals of Operations Research, 131, 237–257.10.1023/B:ANOR.0000039521.26237.62
  • Paraskevopoulos, D. C., Tarantilis, C. D., & Ioannou, G. (2012). Solving project scheduling problems with resource constraints via an event list-based evolutionary algorithm. Expert Systems with Applications, 39, 3983–3994.10.1016/j.eswa.2011.09.062
  • Puri, M. L., & Ralescu, D. A. (1986). Fuzzy random variables. Journal of Mathematical Analysis and Applications, 114, 409–422.10.1016/0022-247X(86)90093-4
  • Qin, A. K., Huang, V. L., & Suganthan, P. N. (2009). Differential evolution algorithm with strategy adaptation for global numerical optimization. IEEE Transactions on Evolutionary Computation, 13(2), 398–417.10.1109/TEVC.2008.927706
  • Ranjbar, M. (2008). Solving the resource-constrained project scheduling problem using filter-and-fan approach. Applied Mathematics and Computation, 201, 313–318.10.1016/j.amc.2007.12.025
  • Roghanian, E., Alipour, M., & Rezaei, M. (2018). An improved fuzzy critical chain approach in order to face uncertainty in project scheduling. International Journal of Construction Management, 18(1), 1–13.10.1080/15623599.2016.1225327
  • Rostami, S., Creemers, S., & Leus, R. (2017). New strategies for stochastic resource-constrained project scheduling. Journal of Scheduling, 1–17. doi:10.1007/s10951-016-0505-x
  • Sebt, M. H., Alipouri, Y., & Alipouri, Y. (2013). Solving resource-constrained project scheduling problem with evolutionary programming. Journal of the Operational Research Society, 64, 1327–1335.10.1057/jors.2012.69
  • Steeneck, D. W., & Sarin, S. C. (2015). Resource-constrained project scheduling with concave processing rate functions. Journal of the Operational Research Society, 66(5), 794–806.10.1057/jors.2014.44
  • Storn, R., & Price, K. (1997). Differential evolution-A simple and efficient heuristic for global optimization over continuous Spaces. Journal of Global Optimization, 11, 341–359.10.1023/A:1008202821328
  • Tormos, P., & Lova, A. (2001). A competitive heuristic solution technique for resource-constrained project scheduling. Annals of Operations Research, 102, 65–81.10.1023/A:1010997814183
  • Valls, V., Ballestín, F., & Quintanilla, S. (2008). A hybrid genetic algorithm for the resource-constrained project scheduling problem. European Journal of Operational Research, 185, 495–508.10.1016/j.ejor.2006.12.033
  • Xu, J., & Zhang, Z. (2012). A fuzzy random resource-constrained scheduling model with multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project. Journal of Scheduling, 15, 253–272.10.1007/s10951-010-0173-1
  • Ying, K. C., Lin, S. W., & Lee, Z. J. (2009). Hybrid-directional planning: Improving improvement heuristics for scheduling resource-constrained projects. The International Journal of Advanced Manufacturing Technology, 41(3–4), 358–366.10.1007/s00170-008-1486-5
  • Yousefli, A. (2017). A fuzzy ant colony approach to fully fuzzy resource constrained project scheduling problem. Industrial Engineering and Management Systems, 16(3), 307–315.10.7232/iems.2017.16.3.307
  • Zadeh, L. A. (1968). Probability measures of Fuzzy events. Journal of Mathematical Analysis and Applications, 23, 421–427.10.1016/0022-247X(68)90078-4
  • Zheng, X. L., & Wang, L. (2015). A multi-agent optimization algorithm for resource constrained project scheduling problem. Expert Systems with Applications, 42, 6039–6049.10.1016/j.eswa.2015.04.009
  • Zoulfaghari, H., Nematian, J., & Nezhad, A. A. K. (2016). A resource-constrained project scheduling problem with fuzzy activity times. International Journal of Fuzzy System Applications, 5(4), 1–15.10.4018/IJFSA

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.